Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Jan 22, 2017 15:43:43 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Jan 22, 2017 15:43:43 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Entry# 1871540-0
Entry# 1871540-0
Entry# 2029393-0

BRGT/Bheraghat (2 PFs)
भेड़ाघाट     भेड़ाघाट

Track: Construction - Double-Line Electrification

SH 22, Bhedaghat, Dis. Jabalpur
State: Madhya Pradesh

Elevation: 389 m above sea level
Zone: WCR/West Central   Division: Jabalpur
No Recent News for BRGT/Bheraghat
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 8
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: /5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Nearby Stations

KEQ/Kachhpura 9 km     MML/Madan Mahal 13 km     BHTN/Bhitoni 14 km     HBG/Howbagh Jabalpur 14 km     JBP/Jabalpur Junction 16 km     GRG/Gwarighat 23 km     ADTL/Adhartal 24 km     BMR/Bikrampur 25 km     JPV/Jamtara Paraswara 27 km     DOE/Deori 33 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 10 of 13 blog entries  next>>
  
★★★  General Travel
Dec 23 2016 (21:55)   12670/Ganga Kaveri Express | JBP/Jabalpur Junction (6 PFs) | ET/WDP-4B

12192 जबलपुर नई दिल्ली श्रीधाम सुपरफास्ट   308 blog posts   5 correct pred (100% accurate)
Entry# 2102196            Tags   Past Edits
#ETALDELECTRIFICATION
In a nutshell, I've closely identified the progress of electrification work between Jabalpur and Itarsi. The details are given below.
1. Jabalpur (excl.)-Narsinghpur work is almost done. Wiring is complete. Work left is only on the two bridges over Narmada river. I think they are deciding to electrify KEQ-JBP at the end. Pic is given in my trip blog.
2. The pic
...
more...
no. 1 & 2 gives the good news we all have been waiting for. The final section i.e, Kareli-Pipariya work has started. Holes have been dug from Gardarwara till Pipariya. You can see works-man digging holes for poles. Soon they'll reach Kareli.
3. Pipariya station is completely under wires now. Pics 3,4,5 shows the status. Wiring from PPI-BGRT is done. At few poles it is to be tightened. I've seen works-man tighten the wires, but due to immense speed of the train (thanks to ET shed monster WDP4b :p ) i couldn't capture those instants. Pics- 8,9 shows BRGT station status.
4. The only single line section of ET-ALD route i.e, BRGT-SQL has also begun to come under wires. Poles and wires are installed and only tightening needs to be done. Pics 9,10,11 are evident. Even bridge over TAWA river is getting poles to be installed.
5. The section after SQL is completed. Only tightening of wires is left at 4-5 poles.
Work is going on at decent pace. CORE is all set to trail the electrified section of ET-PPI in January and is working on that. I hope that was useful :)

16 posts - Mon Dec 26, 2016

  
3212 views
Dec 26 2016 (12:58)
2017Year of hopes for JBP   3079 blog posts   44 correct pred (50% accurate)
Re# 2102196-18            Tags   Past Edits
yes work of doubling also started b/w BGTA-Sontalai as i have spotted the ongoing work after sontalai as trees is being cutted and i think only before tawa bridge the new line will be diverting or else i think the more space which is there in the old bridge will be used to lay new line and before tunnel it will be divertd to avoid new tunnel construction so its good to see work of doubling started from sontalai end

  
2057 views
Jan 04 2017 (23:17)
Ashfak Ahmed Moosa   62 blog posts
Re# 2102196-19            Tags   Past Edits
Jbp katni electrification work 70percent kam ho gaya hai sihora station k pas dumping yard hai jaha electrification mai lagney wala saman rakha hai

  
1957 views
Jan 04 2017 (23:42)
Mohammad Sharique Siddiqui   26 blog posts
Re# 2102196-20            Tags   Past Edits
Very happy to see that the work is restarted hope it finishes soon

  
1913 views
Jan 05 2017 (00:11)
12192 जबलपुर नई दिल्ली श्रीधाम सुपरफास्ट   308 blog posts   5 correct pred (100% accurate)
Re# 2102196-21            Tags   Past Edits
70% ho gya?

  
1893 views
Jan 05 2017 (00:25)
Ashfak Ahmed Moosa   62 blog posts
Re# 2102196-22            Tags   Past Edits
Yes bro aj hi dayodaya express sey jaipur se lauta hu tab mainey dekha hai70na sahi par 60percent to done hai
  
Rail Fanning
0 Followers
3468 views
Aug 04 2014 (06:02)   15119/Rameswaram - Manduadih Weekly Express | BRGT/Bheraghat (2 PFs)
 

Guest: 7a4f254c   show all posts
Entry# 1177584            Tags   Past Edits
Hazardous Overtake with Honking by Rameswaram Varanasi Weekly.
Video link HD] : [click here
Pic Source: click here
Fast & furious ET [itarsi] WDM3A as power of BSB [Varanasi] bound 14259 Rameswaram Varanasi Weekly Express overtakes ET WDM3A # 18856 hauled ALD [Allahabad Junction] bound 51189 Itarsi Allahabad Passenger (UnReserved) at BRGT [Bheraghat] with ultimate honking and chugging.
51189
...
more...
Itarsi Allahabad Passenger (UnReserved) having 6 overtakes between ET & JBP on daily basis. This is a best passenger for railfan to capture overtakes by diesel hauled trains.
By: Chirag Sagar
  
★  General Travel
0 Followers
2149 views
Jan 22 2015 (15:50)   BRGT/Bheraghat (2 PFs)
 

Guest: 2d1ec22e   show all posts
Entry# 1348114            Tags   Past Edits
****BHERAGHAT****
the world famous Bheraghat near about Jabalpur(Distance 20 KM)
It's most famous sights are the Dhuandhar Falls, Marble Rocks, and the Chaunsath Yogini temple.
The temple is one of the four major extant temples containing carvings of sixty four yogini, female yoga mystics. It was built in the 10th century under the Kalachuri empire. It commands a view of the whole area
...
more...
around and of the river flowing through the marble rocks.
Its major attraction is a waterfall known as Dhuandhar, which looks like smoke coming out of the river and therefore it got its name as "Dhuan(smoke)-dhar(flow of water)". Another major attraction which needs mention is 'Bandar Kodini', when one travels in between the marble rocks in a boat, the mountains at both the sides at one point come so close that the monkeys are able to jump across them, hence the name "Bandar Kodini". In a moonlit night, the travel between the marble rock mountains in a boat on the river Narmada is a heavenly site which should not be missed for anything.
Pic. 1:- Natural marbal rock captured at the time of boating.
Pic. 2:- boating
Pic. 3:- Natural marbal rock captured at the time of boating.
Pic. 4:- Rope-way at bhedaghat
Pic. 5:- Dhuan-Dhar Waterfall captured from inside of rope-way
Pic. 6:- Dhuan-dhar, which looks like smoke coming out of the river and therefore it got its name as "Dhuan(smoke)-dhar(flow of water)".

1 posts - Thu Jan 22, 2015

1 posts - Fri Jan 23, 2015

1 posts - Sat Jan 24, 2015

  
856 views
Jan 24 2015 (20:04)
जय हो ™^~   11325 blog posts   107632 correct pred (74% accurate)
Re# 1348114-4            Tags   Past Edits
Awesome pics bro...
Thanks for uploading.
I went there when I was in class XI from school in 2003.
Awesome place....beauty at its best!!!

  
874 views
Jan 24 2015 (20:06)
Guest: 18c2ff4e   show all posts
Re# 1348114-5            Tags   Past Edits
Bheraghat is heaven in MP.....

  
898 views
Jan 24 2015 (20:12)
Guest: 3b0f10b5   show all posts
Re# 1348114-6            Tags   Past Edits
Thx lot.....
:)

  
817 views
Jan 24 2015 (20:13)
Guest: 3b0f10b5   show all posts
Re# 1348114-7            Tags   Past Edits
Yp...
Near about Jabalpur..

  
930 views
Jan 25 2015 (15:13)
mai hoo na~   625 blog posts   5026 correct pred (70% accurate)
Re# 1348114-10            Tags   Past Edits
Fantabulous!!!
  
★  Rail Fanning
0 Followers
1632 views
Oct 19 2016 (17:48)   BRGT/Bheraghat (2 PFs)
 

tsrijan~   37 blog posts   3 correct pred (60% accurate)
Entry# 2029393            Tags   Past Edits
#AldEtElectrification
BRGT now fully under wires!
Date: 13/10/16

1 posts - Wed Oct 19, 2016

5 posts - Thu Oct 20, 2016

  
883 views
Oct 20 2016 (16:40)
2017Year of hopes for JBP   3079 blog posts   44 correct pred (50% accurate)
Re# 2029393-8            Tags   Past Edits
yeah lets c how much time wcr will take to built 3rd line

  
841 views
Oct 20 2016 (16:49)
OHE over JBP~   992 blog posts   61 correct pred (72% accurate)
Re# 2029393-9            Tags   Past Edits
Wiring on JBP stn will be done by the contractor who is in charge of KTE-JBP Electrification.

  
857 views
Oct 20 2016 (17:04)
tsrijan~   37 blog posts   3 correct pred (60% accurate)
Re# 2029393-10            Tags   Past Edits
I don't think so. Because, when the tender of JBP-ET was released, JBP was included in it.
click here

  
817 views
Oct 20 2016 (17:05)
2017Year of hopes for JBP   3079 blog posts   44 correct pred (50% accurate)
Re# 2029393-11            Tags   Past Edits
ohk but that contractor is very slow in compare to ET-KEQ section work contractor and also work is being stopped on JBP-KTE section from so many months so god knws when the contractor will start the work but some months ago the news came that work of JBP-KTE-STA will be given to the contractor who is doing ET-JBP section bcoz of blacklisting of JBP-KTE-STA section work awareded contractor and it will save time also of again floating of tenders so rite now wat is the status dnt knw

  
838 views
Oct 20 2016 (17:08)
2017Year of hopes for JBP   3079 blog posts   44 correct pred (50% accurate)
Re# 2029393-12            Tags   Past Edits
yes its rite and i think the contractor is busy in doing work b/w NU-PPI and after its completion he will start work on KEQ-JBP section as this will be a small section and work can be completed asap
  
General Travel
0 Followers
6205 views
Oct 03 2015 (08:35)   JBP/Jabalpur Junction (6 PFs)
 

Guest: 71104713   show all posts
Entry# 1606437            Tags   Past Edits
  
★★★  Info Update
0 Followers
4727 views
May 30 2016 (15:51)   BRGT/Bheraghat (2 PFs) | NKJ/WDG-4D/70496
 

tsrijan~   37 blog posts   3 correct pred (60% accurate)
Entry# 1871540            Tags   Past Edits
#electrification
OHE masts and cantilevers have been installed on platforms. Only catenary and contact wires need to be installed.
Work is being carried out at great pace. Also, BRGT is being used as a depot to keep all OHE related fittings and equipments.
Please update #sb

4 posts - Mon May 30, 2016

  
May 30 2016 (20:57)
Guest: 4558882a   show all posts
Re# 1871540-5            Tags   Past Edits
Great going! And you have captured exceptional pics. Any update related to work in JBP-KEQ section? Poles?

  
2529 views
May 30 2016 (22:23)
tsrijan~   37 blog posts   3 correct pred (60% accurate)
Re# 1871540-6            Tags   Past Edits
I guess it will take more than a month because the work between KEQ and JBP hasn't even started and the station complex of JBP is huge. Generally, OHE is installed at big stations at later stages of electrification of a route(as we saw in case of GKP).

  
2347 views
May 30 2016 (22:25)
tsrijan~   37 blog posts   3 correct pred (60% accurate)
Re# 1871540-7            Tags   Past Edits
JBP-KEQ section is completely devoid of poles!

  
3297 views
May 31 2016 (08:02)
OHE over JBP~   992 blog posts   61 correct pred (72% accurate)
Re# 1871540-8            Tags   Past Edits

  
2062 views
Jun 01 2016 (04:30)
2017Year of hopes for JBP   3079 blog posts   44 correct pred (50% accurate)
Re# 1871540-9            Tags   Past Edits
i hope that most of the JBP ending trains coming frm ET will get E-Locos asap in compare to KTE side trains and good to see the fast pace of work b/w JBP-ET
  
★★★  Rail Fanning
0 Followers
9692 views
May 26 2015 (22:43)   51672/Katni Itarsi Fast Passenger (UnReserved) | BRGT/Bheraghat (2 PFs)
 

Guest: 4957ffff   show all posts
Entry# 1486613            Tags   Past Edits
#JBP_ET_electrification
Aaj ka latest update...
Kam jbp side se start ho gya h..
1). electrification ka sara saman bhedaghat me shift ho rha h ...
Pics attach h...
2).
...
more...
Electric pole lgane k lie jabalpur se bikrampur (narmada bridge) tk gaddhe traiyar ho ge....
Or aage ka km b under progress h...
3) 80% chhote railway gates k baju me underbridge bn ge/bnae ja rhe h...
4) sare railway gates pr electrification k barrior lg ge.. n railway stations k foot over bridge pe jaliya lg gi...
Lst me sbse imp news..
5) Ghatpindarai belkheda k bich sab kaam ho gya h ab bs sleepers k upr patry dalna reh gya....
I think agr itni hi ya isse b teji se kaam chalta rha to sure dec. 2016 tk ald-JBP-et me WAP dodne lgege...

1 posts - Tue May 26, 2015

11 posts - Wed May 27, 2015

4 posts - Thu May 28, 2015

3 posts - Sat May 30, 2015

  
3965 views
May 30 2015 (20:33)
Montez~   2208 blog posts   1582 correct pred (60% accurate)
Re# 1486613-21            Tags   Past Edits
itni space hai ET me, because qaafi WAPs ki zaroorat hogi
Moreover, diesels ka kya hoga?

  
4228 views
May 30 2015 (21:58)
Guest: 744ea271   show all posts
Re# 1486613-22            Tags   Past Edits
Deisel b chalege n electric b....
Na...
Mje ni lgta k jyada jrurt pdegi bcz zone apne apne loci share krehe...
Jese 12321 mumbai mail ko ald tk hwh shade ka WAP leke aata h...
So..
...
more...
electrification k bad may b possible vo loco mumbai tk chalne lge...

  
6573 views
May 31 2015 (14:26)
Montez~   2208 blog posts   1582 correct pred (60% accurate)
Re# 1486613-23            Tags   Past Edits
take this like
ET WAP4 works for 24 hours, n say ki use CSTM se ET aane me 8 hours lagte hain then it hauls Pawan to LTT
Ab agar isi WAP4 ko ET se ALD next 8 hours ka work diya to fir Pawan kaise jayegi LTT tak?
And diesels kyon work karenge fully electrified track par? :P
Fir
...
more...
electrification ka kya fayda :D

  
May 31 2015 (15:23)
Ammar ali   606 blog posts   385 correct pred (81% accurate)
Re# 1486613-24            Tags   Past Edits
Bhai jo loco idle hoga usse use karenge aur tab tak ET ke pass aur wap4 aajayenge.Isliye ald se electrification shuru hua naki et se.Eg. Mumbai mail ka jo HWH WAP4 ald mai deattach hota hai wo ab kte tak aur baad mai cstm tak jane lagega aisa kai trains ke saath hoga jab full route electrify hoga aur kai trains ko home zone se hee loco link milegi to load nahi badega. :-)

  
6398 views
May 31 2015 (22:48)
Guest: 7442c2a4   show all posts
Re# 1486613-25            Tags   Past Edits
Me b yhi bolne wala tha jo ali sir bol rhe h..
  
Info Update
0 Followers
689 views
Sep 26 2015 (19:54)   BRGT/Bheraghat (2 PFs)
 

Guest: 71104713   show all posts
Entry# 1600797            Tags   Past Edits
#admin
Update the station name in Hindi
भेड़ाघाट

  
623 views
Sep 26 2015 (21:06)
SRG*^~   34960 blog posts   151559 correct pred (75% accurate)
Re# 1600797-1            Tags   Past Edits
Thanks Updated..
  
★  Info Update
0 Followers
1844 views
Jun 20 2015 (20:47)   JBP/Jabalpur Junction (6 PFs)
 

Mooche ho to Natthulal jaisi~   986 blog posts   824 correct pred (71% accurate)
Entry# 1519122            Tags   Past Edits
One more Tendor Regarding ET ALD electrification. See this.

  
1580 views
Jun 21 2015 (00:48)
2017Year of hopes for JBP   3079 blog posts   44 correct pred (50% accurate)
Re# 1519122-1            Tags   Past Edits
ur pdf is not opening pls chk n repost
  
Rail Fanning
0 Followers
3229 views
May 26 2015 (22:03)   51672/Katni Itarsi Fast Passenger (UnReserved) | BRGT/Bheraghat (2 PFs)
 

Guest: 4957fffb   show all posts
Entry# 1486574            Tags   Past Edits
#JBP ET electrification
Aaj ka latest update...
Sirf Kareli se JBP tk...
Bcz mene utna hi travel kia h..
��������
1).
...
more...
Electric pole lgane k lie jabalpur se bikrampur (narmada bridge) tk gaddhe traiyar ho ge....
Or aage ka km b under progress h..
2) electrification ka sara saman bhedaghat me shift ho rha h ...
Pics niche h...
3) 80% chhote railway gates k baju me underbridge bnae ja rhe h...
4) sare railway gates pr electrification k barrior lg ge.. n railway stations k foot over bridge pe jaliya lg gi...
Lst me sbse imp news..
5) Ghatpindarai belkheda k bich sab kaam ho gya h ab bs sleepers k upr patry dalna reh gya....
I think agr itni hi ya isse b teji se kaam chalta rha to sure dec. 2016 tk ald-JBP-et me WAP dodne lgege...
Ghatpindarai belkheda k bich sab kaam ho gya h ab bs sleepers k upr patry dalna reh gya....

  
2812 views
May 26 2015 (22:09)
Soumitra Chawathe*^~   30224 blog posts   98197 correct pred (71% accurate)
Re# 1486574-1            Tags   Past Edits
Page#    Showing 1 to 10 of 13 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site