Date of Action : 19 Nov 2014
Details: rakes for mail/express trains are being allotted by the railway board. the rake will be changed as and when allotted to northern railway. as regard the increase in speed, still trains with LHB rakes are running at maximum speed of 110 kmph on Ghaziabad-Mughalsarai section . the timings saving will be feasible only when the trains will be running at 130 kmph