Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Jan 24, 2017 08:43:41 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Jan 24, 2017 08:43:41 IST

Blog Entry# 1364679  
Posted: Feb 09 2015 (15:42)

6 Responses
Last Response: Feb 09 2015 (16:20)
  
Info Update
0 Followers
1118 views
Feb 09 2015 (15:42)   12367/Vikramshila Express
 

RAJWDP4~   2802 blog posts   93 correct pred (54% accurate)
Entry# 1364679            Tags   Past Edits
I want to clear everyone's misunderstanding about delays of ER trains in ECR.
Since lhb are introduced to raise the mps of trains to 130 kmph but in kiul pnbe stretch in some places there are 52 kg rails which can't support 130kmph speed.So ECR is replacing 52kg rails with 60 kg rails.Theytake mega block almost everyday to replace the rais. Work is going on full swing to finish it as soon as possible.
Places which has 52 kg rails are
koo~Fut
...
more...

Atl~Barh
Dmrx~Kiul
Bfm~Jmu
soon rails of these places will be replaced by 60 kg rails to raise the sec speed to 140 kmph.These traffic blocks are short term pain and long term gain for the passengers.IT WOULD BE INAPPROPRIATE TO SAY THAT
ECR IS INTENTIONALLY DELAYING THE TRAINS OF ER OR OTHER DIVISION.It is my humble request to those bloggers who bash ECR to find the reasons behind the delays and then comment.

1 posts - Mon Feb 09, 2015

  
905 views
Feb 09 2015 (15:59)
Pained to know Boeing 777 landcrashed~   23194 blog posts   21088 correct pred (67% accurate)
Re# 1364679-2            Tags   Past Edits
The most useless section of IR even if they replace 52 kg rails by 60 kg I don't think MPS will increase by 140 kmph...& most of the part of HWH RPH MLDT NJP section already having 60 kg rail do it'd difficult to belive that HWH PNBE main line still not having 60 kg rails....

  
904 views
Feb 09 2015 (15:59)
RAJWDP4~   2802 blog posts   93 correct pred (54% accurate)
Re# 1364679-3            Tags   Past Edits
It is done to ease the congestion at Pnbe and is a good move by ECR.

  
924 views
Feb 09 2015 (16:07)
RAJWDP4~   2802 blog posts   93 correct pred (54% accurate)
Re# 1364679-5            Tags   Past Edits
It would be difficult for u to believe but the reality is that still some places of jaj pnbe sec has 52 kg rails i myself have observed it,but in this year they will be replaced to 60 kg.

  
863 views
Feb 09 2015 (16:11)
Hum safar express idea is total flop^~   77507 blog posts   5080 correct pred (77% accurate)
Re# 1364679-6            Tags   Past Edits
Congestion is huge .. This section also needs separate lines for passenger and for superfast.

  
841 views
Feb 09 2015 (16:20)
RAJWDP4~   2802 blog posts   93 correct pred (54% accurate)
Re# 1364679-7            Tags   Past Edits
There should be third line between Ara and Mka to ensure proper run of trains.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Feb 3
Trains with ARP 15 Dep on: Wed Feb 8
Trains with ARP 30 Dep on: Thu Feb 23
Trains with ARP 120 Dep on: Wed May 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2136570
    Yesterday (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
  • Entry# 2126247
    Jan 13 (11:57PM)


    Here are some guidelines for members regarding the new Report button and the revamped FM system: 1. If you have ANY complaint about a blog or ANY other issues, please USE the Report button and file a Complaint. Most complaints are resolved by FMs within seconds/minutes. (Some require further discussion). FMs have...
  • Entry# 2125399
    Jan 13 (08:58AM)


    Often we have some TL Entries seemingly in WaitList forever. Usually, the reason for this is that TLMs have already looked at the TL Entry but are not confident enough to Confirm it or are looking for more inputs from the Member regarding the source, etc. And this delay eventually causes...
  • Entry# 2122843
    Jan 10 (10:15PM)


    This is to address persistent and lingering questions about FM Appointments: . 1. Being an FM is a service. It is NOT supposed to be some kind of "reward" or "medal" to "deserving" members. The ULTIMATE OBJECTIVE of the process is to promptly handle/look into Reports filed by members, which is expected to...
Scroll to Top
Scroll to Bottom


Go to Mobile site