if the stops are removed then do u have any issue ......... CD and BVH are still unnecessary ,,,,,,,,, when it comes to CD other trains also der and it can be easily increased its speed as i have checked the route is even free from BPA to NGP ...... the train is capable of arriving at 2:50 st NGP and then ar 09:10 at BPL and if it goes the same way then BVH can be removed which is surely possible for this train to made to reach by 08 at NDLS or even earlier if done by IR..........