Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Apr 28, 2017 02:38:32 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Apr 28, 2017 02:38:32 IST

Blog Entry# 2026953  
Posted: Oct 17 2016 (16:26)

10 Responses
Last Response: Oct 30 2016 (22:32)
  
★  Rail Fanning
0 Followers
8118 views
Oct 17 2016 (16:26)   12876/Neelachal (Neelanchal) SF Express | LJN/Lucknow Junction NER (6 PFs) | MGS/WAP-4
 

Lucknow Metro~   2360 blog posts   9 correct pred (47% accurate)
Entry# 2026953            Tags   Past Edits
I took a trip in 12876 Neelachal on 16 Oct between Lucknow and Kharagpur. Train arrived LKO 40 min late. ASR HWH stood parallel to it. We left LKO before 13049 ASR HWH(that goes via SLN ). But PBH route is very congested and we were stopped at many places for crossings.Spotted xings were with Padmavat and Bundelkhand Exp. Reached BSB 2 hr 50 min late. Food was not delivered by IRCTC E Catering due to heavy delay. Maintained its delay till MGS where we xinged with DNR ANVT exp and Imperial mail. ASR HWH was scheduled to arrive after us.Coaches were new but too crowdy.Toilets were biotoilet equipped. AC 3 Tier easily had 100 people per coach. Loco link for NDLS to LKO was MGS P4. For LKO to MGS it was a WDP 4D. MGS to KGP was a red P 4 of unknown shed. Reached...
more...
KGP with a delay of 3 hrs.
>View after Tata crossing a river (Subarnarekha?)
>Condition of coach in the morning
>Freight visible after TATA
>View after TATA
>Rail track running parallel to us after TATA
>Lucknow Shatabdi standing at LJN
>Lucknow Barauni at LJN
>Lucknow Metro under construction
>Beautiful Lko

4 posts - Mon Oct 17, 2016

1 posts - Sun Oct 30, 2016

  
6218 views
Oct 30 2016 (13:41)
Lucknow Metro~   2360 blog posts   9 correct pred (47% accurate)
Re# 2026953-6            Tags   Past Edits
Agreed. A daily train between lucknow and bbs is needed.
The LKO RBL route still has a very long way to go for electrification. Majority of this section is still single tracked.

  
6153 views
Oct 30 2016 (17:43)
Sealdah Jammu HumSafar should get JRC Stoppage*^~   8928 blog posts   1 correct pred (33% accurate)
Re# 2026953-7            Tags   Past Edits
Oh my.... what stretches have been doubled between Utretia Jn and Janghai Jn ? IR has started so many trains via RBL which they could have easily run via the double track electrified route of Jaunpur City - Sultanpur !!!!

  
6136 views
Oct 30 2016 (22:05)
Lucknow Metro~   2360 blog posts   9 correct pred (47% accurate)
Re# 2026953-8            Tags   Past Edits
Literally nothing between UTR and Janghai. LKO-PBH is pretty barren single line. Bhadohi-BSB is double line. PBH-Bhadohi is a mix[single for the most part].
IR runs most trains here since it is politically important route. Raebareily and Amethi are congress mainstays.

  
6112 views
Oct 30 2016 (22:31)
Varuna Express   938 blog posts   663 correct pred (71% accurate)
Re# 2026953-9            Tags   Past Edits
LKO-JNH is still single....doubling underway on JNH-BSB....

  
6041 views
Oct 30 2016 (22:32)
Varuna Express   938 blog posts   663 correct pred (71% accurate)
Re# 2026953-10            Tags   Past Edits
currently hardly 1/4 of BSB-JNH stretch doubled....however soon the whole stretch would be doubled.....work going on

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon May 8
Trains with ARP 15 Dep on: Sat May 13
Trains with ARP 30 Dep on: Sun May 28
Trains with ARP 120 Dep on: Sat Aug 26

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site