Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Feb 20, 2017 07:26:32 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Feb 20, 2017 07:26:32 IST

Blog Entry# 2072290  
Posted: Nov 26 2016 (20:08)

No Responses Yet
  
General Travel
0 Followers
832 views
Nov 26 2016 (20:08)   12289/Mumbai CST - Nagpur Duronto Express | CSTM/Mumbai Chhatrapati Shivaji Terminus (18 PFs)

12188 मुम्बई जबलपुर गरीबरथ एक्सप्रेस~   339 blog posts   7 correct pred (100% accurate)
Entry# 2072290            Tags   Past Edits
Railway Megablock on 27th, Nov, Sunday
CENTRAL LINE: MATUNGA-MULUND DN FAST LINE FROM 10.15 AM TO 3.15 PM
HARBOUR LINE: NERUL-MANKHURD UP AND DN HARBOUR LINES FROM 11.10 AM TO 4.10 PM
WESTERN LINE: NIGHT BLOCK on BETWEEN BORIVALI AND BHAYANDER STATIONS
--------------------------------
...
more...

Details
CENTRAL LINE
MATUNGA-MULUND DN FAST LINE FROM 10.15 AM TO 3.15 PM
Dn fast/semi fast services leaving Chhatrapati Shivaji Terminus from 9.38 am to 2.54 pm will be diverted on Dn slow line between Matunga and Mulund
stations halting at all stations between Sion and Mulund stations and will arrive destination 20 minutes behind schedule.
All Up fast/semi fast services leaving Thane from 10.46 am to 3.18 pm will halt at Mulund, Bhandup, Vikhroli, Ghatkopar and Kurla stations in
addition to their respective scheduled halts and will arrive destination 15 minutes behind schedule.
All slow services arriving and leaving Chhatrapati Shivaji Terminus Mumbai between 11.00 am and 5.00 pm will arrive destination 10 minutes behind schedule.
All long distance trains leaving Chhatrapati Shivaji Terminus Mumbai and Dadar during the block period will be diverted on Dn slow line between Matunga and Mulund.
HARBOUR LINE
NERUL-MANKHURD UP AND DN HARBOUR LINES FROM 11.10 AM TO 4.10 PM
Up & Dn Harbour line services will remain suspended between Nerul and Mankhurd during block period.
Dn services for Panvel/Belapur/Vashi leaving Chhatrapati Shivaji Terminus Mumbai from 10.11 am to 3.29 pm and Up services for Chhatrapati Shivaji
Terminus Mumbai leaving Panvel/Belapur/Vashi from 10.29 am to 3.46 pm will remain cancelled.
Special services will be run on Chhatrapati Shivaji Terminus Mumbai-Mankhurd & Thane-Panvel sections during the block period.
Harbour line passengers are permitted to travel via Trans Harbour / Main line from 11.00 am to 5.00 pm on their valid tickets.
Due to these blocks, suburban trains are likely to be more crowded than usual. Passengers are requested not to take any risks while travelling. They are also
requested to avoid travelling on foot board, roof top of locals and not to board extremely over crowded trains. Passengers are requested to bear with the
Railway Administration for the inconvenience caused.
WESTERN LINE
NIGHT BLOCK on BETWEEN BORIVALI AND BHAYANDER STATIONS
To carry out maintenance work of tracks, signaling & overhead equipments, a night block will be taken from 00:50 hrs to 04:50 hrs on up & down
slow lines between Borivali and Bhayander stations during the midnight falling between Saturday, 26th November and Sunday, 27th November, 2016.
During the block all up slow line trains will be operated on fast lines between Borivali and Vasai Road/Virar. Due to this some local trains will remain
cancelled whose list will be displayed on notice board at every station. During the block period, trains will be dealt from any of the platforms at Borivali.
Hence, there will be no jumbo block during the day time on this Sunday, 27th November, 2016 on Western Railway.
- Install m-Indicator click here

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 2
Trains with ARP 15 Dep on: Tue Mar 7
Trains with ARP 30 Dep on: Wed Mar 22
Trains with ARP 120 Dep on: Tue Jun 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site