Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Tue Apr 30 22:36:21 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 2162508
Posted: Feb 13 2017 (11:05)

6 Responses
Last Response: Feb 14 2017 (17:49)
5 Followers
Travelogue
40899 views
22

★★★
Feb 13 2017 (11:05)   20651/KSR Bengaluru - Talguppa InterCity Express | CMGR/Chikkamagaluru (3 PFs)
Vijay aditya
Vijay aditya   5 blog posts
Entry# 2162508            Tags   Past Edits
THE MALNAD MADNESS..
.
PART-1
.
It was a calm Saturday morning when my blissful sleep came to a sudden end at 10:40AM, there was a weird loud noise accompanied by vigorous vibration of various
...
more...
parts of my bed. I woke up startled, my semi conscious mind unable to figure out the source, turns out it was our admin hero of the lands beyond lottegollahalli, Tejas, calling me to ensure I wake up in time to book tickets in Tatkal. It was ancient history to me that I had promised him the day earlier, that i would indeed wake up on time and book them in time. These were for our next day return trip from Bhadravati in 16580 SMET-YPR Tri-Weekly Express. It also hit me that we were to depart in a few hours onboard 16201 SBC-SMET Express to Chikmaglur and i was barely in the position to open my eyes fully.
.
Tejas however didn't know that I just woke up to his phone call, so he was duly informed that i was up since morning and the tickets would be taken care of, feigning complete nonchalance. After all, I didn't want my reputation of being punctual, stickler to trips committed and completely dependable be dented. After a series of phone calls and trying to book tickets in parallel, we finally got confirmed reserved tickets for the next day(I have never really imagined the tri-weekly would go into such long WL forcing us to book CK, but then weekend it was).The two other members joining us were also the lone voyagers of lottegollahalli, my very old unpredictable regular travel partner Shashank Bhat and subbu, a dear friend to all of us.
.
There are quite a lot of destinations mentioned like Chikmaglur, Shimoga and Bhadrvathi in what i wrote above so in case you are wondering where this trip was to, then i'd ike to say to explore the Chikmaglur-Kadur line. But like things have always been when a combination of any four of us or all go on a trip, it was an absolute maze of the weirdest of situations which made the next 36 hours turn out different in entirety. Delayed trains, broken brains, lazy legs, sheer madness and of course quite a lot of green chickpea along with their plants.
.
Do keep watching this space for a detailed trip report and be a part of the railfanning escapades and them class while i would try to recollect details and put them into words :)
.
TO BE CONTINUED..

Translate to English
Translate to Hindi

1 Public Posts - Mon Feb 13, 2017

23971 views
8

Feb 13 2017 (17:36)
Vijay aditya   5 blog posts
Re# 2162508-2              
PART-3:
.
The train was unusually full, well i can't really say unusually or not, but in a 2S coach, there were atleast 30 people standing apart from the reserved ones all the way till Arsikere. Once we departed Tumkur, movement was very slow with stops every 15-20 minutes to give way to trains ranging from Superfasts to Passengers. We had originally intended to alight at Kadur, the scheduled arrival being 18:54 and take the connecting train(Shimoga Town-Chikmaglur Passenger) to Chikmaglur at 2010. Assuming a delay of even 40 minutes, this seemed like
...
more...
a totally viable plan.
.
We were looped at Karadi and made to wait quite a long time to let what appeared like Tatanagar-YPR express to pass. With hope still alive and spirits all high, we got back into the train hoping we would still be able to make it. SMET-YPR express was waiting for our train at Tiptur and we were making great progress after that, Arsikere was only 25kms from here, On time Performance is assured is what we thought not being able to predict the events of the next one hour.
After departure from Tiptur, we were making good time till we were looped into platform 3 of Honnavalli Road. With a lazy stretch, all of us got out of the train to either click some pictures, find some local vendors and get some food and the likes. A crossing was inevitable, and no sooner than the opposite mainline aspect turned green, the dutiful railfans headed to that end of the platform to have do some investigations on the train approaching. Minutes later, Chalukya Express Zoomed past at a rather sedate pace owing to some TSR ahead. Anyway, we were set to leave now that the crossing was over, right? Wrong!
.
It was dark already and the vehicle lights from the mainroad after the station were clearly visible, the level crossing gate had been opened. This meant we are not going anywhere and are to give way to another train at the same station, double crossing for an already delayed intercity express, we were certainly not pleased. Soon enough, the aspect of the mainline MACL turned green again for what we thought would be Janshatabdi, cursing the train. In few minutes, which appeared like hours, Karwar-YPR triweekly express made an appearance and went past us in a slow pace, almost mocking the intercity express.
Our train, SMET intercity was already quite badly trolled with two crossings at the same station. But finally the wait was over and we were good to go, oh how wrong we were!!
.
The LC gate opened again and we threw our arms in the air in despair, i was wondering how the reaction would be from a certain railfan from the same base very renowned for his exaggerated reactions to anything imaginable. Its been about 30 minutes since we have been looped at honavalli road when the MACL on the mainline turned green yet again, this time bringing in UBL-SBC Jan shatabdi, the delay now more than 90 minutes. We were supposed to take the passenger from Kadur to chiikmaglur at 2010, but having spent the last 45 odd minutes at the same location, it was 2000 already crushing all hopes.
.
What followed was a non stop run to Arsikere and the fastest run in the whole trip between Arsikere and Kadur, it was about 2100, YPR-CMGR passenger was trailing us somewhere not much behind. However, reaching Chikmaglur station around 2300, a station located outside the city and looking for accomodation options didnt seem that appealing. Altough we did at a point considering spending the night at the station.
.
So Kadur it was, for the night, to head to Chikmaglur early next morning..Exploring that route in the morning was something which kept us all going(Apart from one or two other edible things) although we were all clearly tired.
.
TO BE CONTINUED...

Translate to English
Translate to Hindi

3 Public Posts - Mon Feb 13, 2017

1 Public Posts - Tue Feb 14, 2017

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy