As we know Konkan Railway is approximately 750 kms long, surrounded with mountains, tunnels and bridges though this route has many high speed trains which are capable of running with 55+ avg speed whereas we have Tapti line which is almost 70% completed with doubling though trains takes 6:30-7 hours to reach Surat from Bhusaval without any mountains tunnels, it is possible that trains can reach in 5:30-6 hours without doubling but this tapti line is always neglected by IR.
Do you think Tapti line is not properly managed or neglected by IR?