Timeline UpdatesTrip UpdatesNews PostsPvt PostsPvt PostsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Mon Sep 22, 2014 05:41:34 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
PNR Super Search
PNR Entry# 249868  
Predictions: 18
confirm: 12
rac: 2
wl: 4
Journey: Thu Oct 27, 2011 @ 19:55
12137/Punjab Mail
Entry# 249868

PNR: 841-xxxxxxx (E-Ticket)   |   AC 3-tier - 3A   |   Tot Seats: Avbl >127   |   Charting: < 17:24   |   Similar PNRs
DR/Mumbai Dadar Central   to   FZR/Firozpur Cantt. Junction   |   1922 km / 1931 km
Original Status as of: Oct 04 2011 (8:34PM)
From: Mumbai Dadar Central/DR
To: Firozpur Cantt./FZR
Date of Journey: Thu Oct 27, 2011 @ 19:55
Class: AC 3-tier - 3A
Passenger 1: Waitlist# 47 (Booking Status: W/L 68,GNWL)
Passenger 2: Waitlist# 48 (Booking Status: W/L 69,GNWL)
Passenger 3: Waitlist# 49 (Booking Status: W/L 70,GNWL)
Passenger 4: Waitlist# 50 (Booking Status: W/L 71,GNWL)
Passenger 5: Waitlist# 51 (Booking Status: W/L 72,GNWL)
Chart NOT Prepared
Please analyze my PNR, and predict my chances of confirmation. Thanks.

Latest Status as of: Oct 27 2011 (5:04PM)
Passenger 1: Can/Mod (Booking Status: W/L 68,GNWL)
Passenger 2: Can/Mod (Booking Status: W/L 69,GNWL)
Passenger 3: Can/Mod (Booking Status: W/L 70,GNWL)
Passenger 4: Can/Mod (Booking Status: W/L 71,GNWL)
Passenger 5: Can/Mod (Booking Status: W/L 72,GNWL)
Chart NOT Prepared

355 views
Oct 04 2011 (8:40PM)        

Adil   324 blog posts   4591 correct pred (78% accurate)  
Re# 249868-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
would suggest to be prepared for tatkal or any other option...

395 views
Oct 04 2011 (8:51PM)        

Gurmeet Singh bhagat   16 blog posts   176 correct pred (52% accurate)  
Re# 249868-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
sure confirmed...

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Oct 2, 2014
Trains with ARP 30 Dep on: Wed Oct 22, 2014
Trains with ARP 60 Dep on: Fri Nov 21, 2014

  
  

Rail News

New Trains

Site Announcements

  • Entry# 1209120
    Sep 07 (03:36PM)


    -@all members: This is an IMPORTANT reminder to all members that NO MONETARY transactions are permitted within the scope of IRI. Members are NOT ALLOWED to borrow/lend money to each other, book rail tickets for each other, introduce themselves as "IRI Members/Admins" and solicit monetary favours, asking to book rail tickets...
  • Entry# 1204822
    Sep 02 (07:04PM)


    With the roll out of new TTs, we are introducing 3 new enhancements: . 1. "To Be Introduced" trains: As the title implies, Admins may add Trains that are announced in the Budget and Not yet introduced, to this list, with WHATEVER tentative TT is available, and whatever sketchy or vague information...
  • Entry# 1193896
    Aug 21 2014 (10:23PM)


    The new IRI logo can now be seen. Actually, we are reluctant to make changes to the logo (for the sake of recognizability and consistency), but some very slight modification was done this time. Here is the post-facto rationalization of the logo: . 1. The Chakra is the Wheel symbolizing Transportation/Travel which...
  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
Scroll to Top
Scroll to Bottom