Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Fri Jul 25, 2014 23:05:34 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video    Post a Train TipPost a Train Tip **new    Post a Station TipPost a Station Tip **new    Super Search
Topics:    Filters:

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Aug 4, 2014
Trains with ARP 30 Dep on: Sun Aug 24, 2014
Trains with ARP 60 Dep on: Tue Sep 23, 2014

  
  

Rail News

  • China to Extend Rail Line from Tibet to India, Nepal  News Entry# 186846
    by: rdb**  Today (11:02PM)


    BEIJING — China plans to extend a railway line linking Tibet with the rest of the country to the borders of India, Nepal and Bhutan by 2020 once an extension to a key site in Tibetan Buddhism opens, a state-run newspaper reported on Thursday.
    ...
  • Telangana school bus mishap: Bus driver held responsible by Railways  News Entry# 186845
    by: rdb**  Today (11:01PM)


    Hyderabad: The South Central Railway authorities said that it was evident that the driver of the school bus drove into the approaching train leading to the accident. “It is a matter of common sense to stop when a train is approaching. The bus driver underestimated the speed of the moving...
  • SCR vows to remove Unmanned Railway Level Crossings by 2016-17  News Entry# 186844
    by: rdb**  Today (10:59PM)


    South Central Railway (SCR) General Manager PK Srivastava reviewed with the Principal Heads of the Departments concerned on the progress of works for eliminating the unmanned railway level crossings on SCR.
    Expressing serious concern over the accident that occurred on Thursday...
  • A trip down memory lane  News Entry# 186843
    by: rdb**  Today (10:57PM)


    Neville Jeremiah’s career in Southern Railway was one of pioneering achievements
    A lifetime is hard to condense into a few hundred words, especially if it has been as eventful as Neville Jeremiah’s, but the erstwhile Southern Railways chief mechanical engineer tries...
  • Railways might get better toilet systems  News Entry# 186842
    by: rdb**  Today (10:56PM)


    If all goes well, there will be no nauseating scenes at railway tracks in railway stations across the country. The railways also can save lot of money on water and labour to clean the human waste discharged from the toilets of respective trains halted for a while at the stations.
    ...

New Trains

Site Announcements

  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
  • Entry# 932140
    Dec 12 2013 (01:34AM)


    Over the last month, several enhancements have been made to the IRI Atlas. Following are the salient points: . 1. Previously, the tracks were crude with many straight line segments. Only on clicking on the individual tracks, it would assume a finer form. Now, the tracks are refined even on the overview...
  • Entry# 914135
    Nov 22 2013 (09:32PM)


    -@all: There's been this recent concern raised by many about the so-called "race blogs", and how they are congesting the Forum. As per our long-standing policy, members are allowed to blog freely, so long as their posts are not offensive or of a repetitive spam nature. . Accordingly, the following changes are being...
  • Entry# 871813
    Oct 09 2013 (06:44AM)


    Some new features have been introduced: #siteannouncement . Blogs: 1. Multiple Train & Station tags can be added to each Blog Entry as well as each Blog Reply within the Blog Entry. The "Tags" link within each Blog Entry/Reply will show the list of Train/Station Tags. . 2. The Forum submenu within the Train &...
Blog Entry# 294125  
Posted: Nov 29 2011 (2:10PM)

12 Responses
Last Response: Nov 29 2011 (4:28PM)
0 Followers
411 views
Nov 29 2011 (2:10PM)           
 

395 cr for patch doubling SMTA NCB NMX RQJ   18258 blog posts   19013 correct pred (68% accurate)  
Entry# 294125               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Sorry to see the highly inefficiency of platform management in HWH Station.If the station with 23 PFs have such condition,what will happen to other important stations with less no of platforms....???

2 posts - Tue Nov 29, 2011 - are hidden. Click to open.

391 views
Nov 29 2011 (2:20PM)        

395 cr for patch doubling SMTA NCB NMX RQJ   18258 blog posts   19013 correct pred (68% accurate)  
Re# 294125-3               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Sir,I will explain in detail after a few mins..please be patient & kindly suggest accordingly that what should be the next step from Eastern Rly Authorities....I want all to actively participate in this decision .Because its the matter of pride for the greatest stations in India...!!

378 views
Nov 29 2011 (2:29PM)        

PKV**   17506 blog posts   35 correct pred (78% accurate)  
Re# 294125-4               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
PFs 17-24 belong to SER and being of more recent origin were built longer to berth 24 coach trains. PF nos. 1 to 14 are of the old vintage when 24-coach trains were not even dreamt off. Hence they are presently inadequate. But yes other than 9,12,14 and possibly 8, the others are too short for the purpose. BTW PFs 1 to 5 and often 6 are used by EMU locals with 9/12 coaches.
An interesting tidbit is that even about 10 years ago, KING COROMANDEL used to depart from the OLD COMPLEX (PF 14) but arrive at the NEW COMPLEX (PF 18 TO 21). Passengers often found this arrangement very confusing causing people to nearly miss the outgoing train. Fortunately, better sense prevailed and this anomaly was rectified.

359 views
Nov 29 2011 (2:36PM)        

Vinay Kumar   12930 blog posts   361 correct pred (78% accurate)  
Re# 294125-5               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Which PF has the Road Sub-Way entry in HWH??
The 2 PF, from where Mumbai Mail & Punjab Mail departs!!

357 views
Nov 29 2011 (2:38PM)        

PKV**   17506 blog posts   35 correct pred (78% accurate)  
Re# 294125-6               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
PFs 8 & 9 in the Old Complex and PFs 21 & 22 in the New Complex.

315 views
Nov 29 2011 (4:04PM)        

395 cr for patch doubling SMTA NCB NMX RQJ   18258 blog posts   19013 correct pred (68% accurate)  
Re# 294125-7               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Sir,now I'll describe what was the situation in HWH on 27.11.2011,Sunday Morning,when I was there to recieve my parents who were arriving by 12346.The train generally arrives on PF #14.In the Enquiry board beside the 1st Class Waiting Hall,it was written that the train will arrive @ 06.10.By 06.05,it was displayed,train crossed Liluah & @ 06.10,display shown,Train O/S.So,I was pretty assured that the train may arrive by any time after the announcement.by the mean time,11447,which arrived HWH @ 04.10 in the morning,was still parked @ PF#6 till 06.05 & 12308,which arrived @ 05.10,was there in PF#9,was moved to pit line only after 06.45.That Day 12274(NDLS Duronto) was running 50 mts late,13006 was delayed by 30 mts,15960 by 5 Hrs,12312 by 6 Hrs,13010 by 1 Hr,12174 by 1 Hr,12334 by 15 mts...So 12346 should have got entry by 06.25 at least as there was no train to occupy PF#14,13 & 12.12352...
Read more...
was also written O/S by that time.Still the train was made to halt @ HWH outer for more than 1 Hr to enter only at 07.20.Now think if the above mentioned trains on that day was on time,then Saraighat would have been further delayed.Isnt it a mismanagement.First of all,you dont have enough platforms to accomodate 24 coachers(which is the demand for every train now-a-days),then if platforms are available also,you're not utilizing them efficiently.

299 views
Nov 29 2011 (4:12PM)        

PKV**   17506 blog posts   35 correct pred (78% accurate)  
Re# 294125-8               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Yes, Prabir, this sort of mismanagement is quite characteristic of Howrah Station. Imagine the plight of a passenger who wants to board the Falaknuma Express departing from the New Complex at 7.25 am. Despite Saraighat being on time, he will have to miss the ongoing train.

296 views
Nov 29 2011 (4:14PM)        

395 cr for patch doubling SMTA NCB NMX RQJ   18258 blog posts   19013 correct pred (68% accurate)  
Re# 294125-9               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
In this context I would like to mention that 12345/12346 Saraighat Exp is one of the most important trains of Eastern Rly,which gets the priviledge of departure from PF#9(along with trains like 12301,12311,12303,12381,12307 etc),which is very close to the Bay for entry & exit of vehicles

294 views
Nov 29 2011 (4:16PM)        

395 cr for patch doubling SMTA NCB NMX RQJ   18258 blog posts   19013 correct pred (68% accurate)  
Re# 294125-10               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
If I was the passenger I would get down from the train & move on to new complex platform,after crossing the yard.The train was standing very near to the station.

292 views
Nov 29 2011 (4:19PM)        

PKV**   17506 blog posts   35 correct pred (78% accurate)  
Re# 294125-11               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Good move if you are a lone passenger with limited luggage. But if one is travelling with the family and/or luggage/aged persons, then it is a difficult proposition, Prabir.

279 views
Nov 29 2011 (4:28PM)        

Nagavali Exp**   13413 blog posts   28968 correct pred (63% accurate)  
Re# 294125-12               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
This problem is not only with Howrah, its seen in almost all stations down in south too. Before 9am, MV-MYS express will reach Mysore and it will be made to halt outside for almost 15-20 minutes and reaches Mysore station by 9:20am. This is almost daily affair there:(
Most of the trains reaching Bangalore Cantonment will not depart immediately and again will be made to wait outside Bangalore city station (for this reason people always miss connecting trains).
Scroll to Top
Scroll to Bottom