Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Sat Aug 2, 2014 14:05:49 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video    Post a Train TipPost a Train Tip **new    Post a Station TipPost a Station Tip **new    Super Search
Topics:    Filters:

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Aug 12, 2014
Trains with ARP 30 Dep on: Mon Sep 1, 2014
Trains with ARP 60 Dep on: Wed Oct 1, 2014

  
  

Rail News

New Trains

Site Announcements

  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
  • Entry# 932140
    Dec 12 2013 (01:34AM)


    Over the last month, several enhancements have been made to the IRI Atlas. Following are the salient points: . 1. Previously, the tracks were crude with many straight line segments. Only on clicking on the individual tracks, it would assume a finer form. Now, the tracks are refined even on the overview...
  • Entry# 914135
    Nov 22 2013 (09:32PM)


    -@all: There's been this recent concern raised by many about the so-called "race blogs", and how they are congesting the Forum. As per our long-standing policy, members are allowed to blog freely, so long as their posts are not offensive or of a repetitive spam nature. . Accordingly, the following changes are being...
  • Entry# 871813
    Oct 09 2013 (06:44AM)


    Some new features have been introduced: #siteannouncement . Blogs: 1. Multiple Train & Station tags can be added to each Blog Entry as well as each Blog Reply within the Blog Entry. The "Tags" link within each Blog Entry/Reply will show the list of Train/Station Tags. . 2. The Forum submenu within the Train &...
Blog Entry# 467382  
Posted: Jun 28 2012 (5:19PM)

9 Responses
Last Response: Jun 28 2012 (7:03PM)
General Travel
0 Followers
2094 views
Jun 28 2012 (5:19PM)   12141/Mumbai CST - RajendraNagar Patna SF Express | MGS/Mughal Sarai Junction (8)        
 

उत्तरी रेलवे**   1338 blog posts   1413 correct pred (75% accurate)  
Entry# 467382               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
I don't remember exactly.But as far as i remember i have seen this train is having two diesel engines.does it really need 2 engines to haul a single train
(Confirmed from IRI about 2 engines ET Shed ET- PNBE-TWIN ET WDM#3.)

2078 views
Jun 28 2012 (5:24PM)        

उत्तरी रेलवे**   1338 blog posts   1413 correct pred (75% accurate)  
Re# 467382-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Another such instance ,i saw 12819 orissa sampark kranti at BBS railway station with two electric engines(WAP's) attached conscuitvely.
(Having no proof for this,but from my memory i am 90% sure this was that train in the year 2006)

2057 views
Jun 28 2012 (5:34PM)        

उत्तरी रेलवे**   1338 blog posts   1413 correct pred (75% accurate)  
Re# 467382-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
members plz give ur view

2054 views
Jun 28 2012 (5:37PM)        

विश्व नाथ**   12059 blog posts   263 correct pred (75% accurate)  
Re# 467382-3               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Some trains runs with Twin Locos but not with Highpower locos.
The loco link i internal matter of zones railfan can not question this .

2042 views
Jun 28 2012 (5:49PM)        

Optimus Prime*^   2290 blog posts   315 correct pred (76% accurate)  
Re# 467382-4               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
19047/48 BHAGALPUR-SURAT EXPRESS runs with twin WDM 3A/D throughout its journey!

2013 views
Jun 28 2012 (6:30PM)        

उत्तरी रेलवे**   1338 blog posts   1413 correct pred (75% accurate)  
Re# 467382-5               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Is it that one is for emergency purpose or for fuel backup or both run simultaneously??

1993 views
Jun 28 2012 (6:45PM)        

विश्व नाथ**   12059 blog posts   263 correct pred (75% accurate)  
Re# 467382-6               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Bot loco connected with cable (name don't know) for synchronization.

1972 views
Jun 28 2012 (7:00PM)        

Guest: 7fc1e7e3   show all posts
Re# 467382-7               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
even mumbai howrah mail also run with twin diesel between ald to itarsi

1967 views
Jun 28 2012 (7:02PM)        

Begins Falls Rises ™**   19666 blog posts   1201 correct pred (63% accurate)  
Re# 467382-8               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
its Mued!! two cables are attached in between WDM's.

1971 views
Jun 28 2012 (7:03PM)        

Begins Falls Rises ™**   19666 blog posts   1201 correct pred (63% accurate)  
Re# 467382-9               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
yeah it sometimes required!! sometimes 24 coach train can't b pulled by a single WDM-3A loco. so WDM-3A twins are used n even WDM-2A twins are used.
Scroll to Top
Scroll to Bottom