The 3 rd line between ktv to VZM still needs 2 years to see the light. There are stretches near kantakapalli ,alamanda and near bheemasinghi which require small bridges to be constructed. In some of the posts pertaining to this topic i read about trains having parallel run but i didn't notice this parallel action in between kottavalsa and VZM oflate.