Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Jun 29, 2017 21:47:20 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Jun 29, 2017 21:47:20 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by हिसार जंक्शन~
Page#    416 Blog Entries  next>>
  
★★★  Info Update
Dec 03 2015 (21:50)   HSR/Hisar Junction (6 PFs)

हिसार जंक्शन~   1123 blog posts   11 correct pred (58% accurate)
Entry# 1669885            Tags   Past Edits
Finally!! Got up early and planned a short trip to Rewari to providing you latest updates on RE-MHU-HSR #Electrification & #Doubling.
Board train : 54835 (HSR-RE PXGR)
Return Board train :59721 (JP-HSR FAST PXGR)
Highlights : ( Statics are in % & acc to my data )
◆◆Doubling
...
more...

●RE-KSI work almost done 99% including track laying,linking and signalling. 1% remainedmained for track linking.
●KSI-MHU work for track laying & linking is done almost 60%.Levelling work done 80%.Remaining work left 20%.
◆◆◆Overall work done 65-70%
◆◆Electrification
●Railway is setting up TSS at STD & RE
●RE-KSI work for pole basic structure is complete on both side (up-dwn) . Pole erected 70%.
●KSI-MHU work for pole basic structure is in progress
●MHU-HSR work for pole basic structure completed till Hansi (HNS) (50KM).
Pole have been erected from MHU to in between BWK-JKZ (35KM).
Wiring & OHE Eqip have been completed till BWN (14KM)
●●Work for Plateforms including increase in height and 2nd platefrom are in progress till BWK.
KSI will now have 3 Plateforms currently only have single.
●● Today i saw heavy load on RE-HSR track met with 10 WDG with 10 different Goods and Coal train
◆◆◆ IMP NEWS: RAILWAY is CONSTRUCTES A BY-PASS LINE TO IGNORE REWARI UNDER WDFC WHICH CONNECT RE-HSR SECTION TO RE-FL SECTION UNDER WDFC. A GREAT RELIEF !! (this is not confirmed news ...but i am informing you as i saw rly constructing bridge and other work just 10km before rewari on HSR-RE section)
Today's Blog Upload
●Doubling
●Electrification
●HSR-RE Pxgr - 54835
●JP-HSR Fast Pxgr - 59721
●DEE-BDTS GR - 12215
●BDTS-DEE GR - 12216
●SLN-ADI Exp - 19404
●VARIOUS WDG LOCO PICS
●Various Station pics
#Hisar

27 posts - Dec 2015

1 posts - Jan 2016

2 posts - Feb 2016

28 posts - Mar 2016

4 posts - Apr 2016

1 posts - May 2016

5 posts - Jul 2016

3 posts - Aug 2016

16 posts - Sep 2016

3 posts - Oct 2016

16 posts - Nov 2016

2 posts - Dec 2016

1 posts - Jan 2017

11 posts - Mar 2017

10 posts - Apr 2017

  
★  
3154 views
May 01 2017 (19:52)
हिसार जंक्शन~   1123 blog posts   11 correct pred (58% accurate)
Re# 1669885-136            Tags   Past Edits
Update as on 1/05/2017 :
#Doubling work reached to Manheru.Bllasted stone have been laid down over 80% of section between KSI-MHU while almost the same for rails.Where as 20% section in which in some part nothing happened yet or track linking left.
Second Plateform work is in progress at MHU,CKD and Jahrli station.
#Electrifcation work reached to MHU outer in which basic
...
more...
structure is being constructing near MHU outer.
Poles have been erected till CKD outer on both line (running line completed whereas on new line it covers almost 95%) whereas basic structure is approaching MHU.OHE mast n clips on running line till CKD and wiring has been done on both line 5 kms towards MHU to KSI
#1 - Manheru Station second PF
#2 - Jharli station second PF
#3 - Section between Kosli-Jharli
#4 - Kosli Station
#5 - Jatusana Station
#6,7,8 - Approaching Rewari where OHE is rising up to 7.5m
#9 - Bhiwani Junction and stored poles
#10 - At rewari Junction , Double stack container under High Rise OHE !

  
2020 views
May 15 2017 (12:14)
हिसार जंक्शन~   1123 blog posts   11 correct pred (58% accurate)
Re# 1669885-137            Tags   Past Edits
Wiring completed till Satrod (STD) outer on MHU-HSR stretch !!

  
1049 views
Jun 08 2017 (11:05)
हिसार जंक्शन~   1123 blog posts   11 correct pred (58% accurate)
Re# 1669885-138            Tags   Past Edits
After a long halt ...work for electrification between STD-HSR have been started!!

  
667 views
Jun 14 2017 (16:37)
rohitgl   6 blog posts   1 correct pred (50% accurate)
Re# 1669885-139            Tags   Past Edits
seems It got delayed due to Electricity board DHBVN but good to see that it got started

  
240 views
Jun 25 2017 (21:26)
हिसार जंक्शन~   1123 blog posts   11 correct pred (58% accurate)
Re# 1669885-140            Tags   Past Edits
Poles are reached near Surya Nagar Railway Crossing (outer Hisar Jn) !!
Work for TSS getting delayed because of pending approval and tendering delay from HVPNL !!
  
General Travel
0 Followers
1080 views
Jun 10 2017 (13:30)   HSR/Hisar Junction (6 PFs)

हिसार जंक्शन~   1123 blog posts   11 correct pred (58% accurate)
Entry# 2314837            Tags   Past Edits
Preliminary Work for Hisar-Bathinda Electerifivarion has been started !

  
240 views
Jun 10 2017 (13:45)
Mumbai Rajdhani best train in world^~   82836 blog posts   5299 correct pred (78% accurate)
Re# 2314837-1            Tags   Past Edits
NWR ko Electrification ka chaska lag Gaya Hai ...

  
248 views
Jun 10 2017 (13:46)
Ammar ali   610 blog posts   388 correct pred (81% accurate)
Re# 2314837-2            Tags   Past Edits
Foolish news papaer writing as always.Writing soil as swine nothing can be done of them.

1 posts are hidden.

  
869 views
Jun 10 2017 (14:55)
12952 नई दिल्ली मुंबई राजधानी द किंग~   6838 blog posts   345 correct pred (77% accurate)
Re# 2314837-4            Tags   Past Edits
I wish to see JP-HSR passanger with WAP 5.

4 posts are hidden.
  
Imaginary
0 Followers
822 views
011
May 26 2017 (20:48)   IMG05662/♥♥Hisar Silchar Express♥♥

HS GD SKD pride of NER~   15 img trains   8 popular
90 green flags   0 red flags   8 green per Train
Entry# 2294487            Tags   Past Edits
A new connection from Rewari to Silchar. please give your views, suggestions and of course flags.

8 posts are hidden.

  
323 views
Jun 06 2017 (09:42)
हिसार जंक्शन~   1123 blog posts   11 correct pred (58% accurate)
Re# 2294487-9            Tags   Past Edits
Add stoppage at Rewari Jn for 20 min or so as there will be loco reversal !!

  
316 views
Jun 06 2017 (13:52)
HS GD SKD pride of NER~   2735 blog posts   70 correct pred (80% accurate)
Re# 2294487-10            Tags   Past Edits
Yes I was wondering about that. Thanks for confirming it.
  
★★★  General Travel
0 Followers
19448 views
Oct 27 2015 (19:01)   HSR/Hisar Junction (6 PFs)

हिसार जंक्शन~   1123 blog posts   11 correct pred (58% accurate)
Entry# 1630444            Tags   Past Edits
Headlines from today's Function of Laying of Foundation Stone for #CoachCareComplex by #RM Mr Suresh Prabhu.
The CCC contains....
- A washing line (24+2 coaches but RM announced it will be of 28 coaches)
- A sik line/Shed for fully inspection of coaches
-
...
more...
An Office Complex which is environmently green
- A Depot for daily uses instruments & Spare Parts.
The representatives of Hisar (MP-Dhusyant Chautala , MLA- Kamal Gupta) demanded of-
1-Re develop of Hisar Junction (build 115 years ago and after that no such chnages is come here)
2-Make Hisar as Head Quartr as official have to travel 600km for work which is way lone and hisar is surrounded by three division (Delhi,Ambala,Bikaner) which means we have to talk three divisions for a project to took place.
More over that the farmers are ready to give there land at Nyoli Kalan (10RKM away from HSR on HSR-BTI line )
3-Senction work for Hansi-Jind (35km) & Uklana-Narwan (29km) whose survey report has been come to GM and found feasibily positive & work for HNSI-ROK rail line.
4-Senction work for ROB's at Surya nagar & Dabra Chawk (whose DPR is done) & RUB at patel nagar.
5-Allot fund for railway line as official only senction rs 10000 For the project.
#RM Mr Suresh Prabh replies,
1-Hisar is one of the 400 station whose development is done under PPP model.
2-Hansi-ROK rail line is having some issue about land acquisition , as soon it resolved we'll be on the ground.
3- The ROB at surya nagar will be soon on earth & i believe i'll get the chance for laying the foundation stone.
4- I have senction 60 lacs for the washing line project right now and remaining will be provided as it requires.
5-A DEMU train will be run after the complition of Washing Line.
Before leaving he said , i have all the demands from the representatives as my style of work is that " I do first then i speak, qouted about her grandmother " and i am not promising right now but you'll surely see better for your city.

15 posts - Oct 2015

5 posts - Apr 2016

4 posts - May 2016

6 posts - Jun 2016

3 posts - Nov 2016

3 posts - Dec 2016

1 posts - Jan 2017

5 posts - Feb 2017

2 posts - Wed Mar 29, 2017

  
3042 views
Mar 30 2017 (10:14)
हिसार जंक्शन~   1123 blog posts   11 correct pred (58% accurate)
Re# 1630444-52            Tags   Past Edits
Trail Run on Washing Line Track today ! Gorakhdham Exp to be run on track !

  
3082 views
Mar 30 2017 (10:16)
हिसार जंक्शन~   1123 blog posts   11 correct pred (58% accurate)
Re# 1630444-53            Tags   Past Edits
Thnku Bro ! Yes, i guess 2 months for Washing line and approx same for the Pit line !

  
Mar 31 2017 (07:12)
हिसार जंक्शन~   1123 blog posts   11 correct pred (58% accurate)
Re# 1630444-54            Tags   Past Edits
Trail run conducted successfully on washing line track !

  
1453 views
May 24 2017 (12:14)
हिसार जंक्शन~   1123 blog posts   11 correct pred (58% accurate)
Re# 1630444-55            Tags   Past Edits
Expected Date of Inaugration of Coach Care Complex will be 20July ,2017 by Rail Minister . Hope we will see some extended trains !!

  
1170 views
May 30 2017 (16:25)
हिसार जंक्शन~   1123 blog posts   11 correct pred (58% accurate)
Re# 1630444-56            Tags   Past Edits
Update!!
  
★★  General Travel
0 Followers
1583 views
May 01 2017 (21:54)   RE/Rewari Junction (8 PFs)

हिसार जंक्शन~   1123 blog posts   11 correct pred (58% accurate)
Entry# 2258737            Tags   Past Edits
Take a look on High Rise OHE section of RE-HSR-LDH at Rewari. Double stack container and high rise ohe and conventional freight with high rise OHE. And last pic of car carrier wagon
Page#    416 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Jul 9
Trains with ARP 15 Dep on: Fri Jul 14
Trains with ARP 30 Dep on: Sat Jul 29
Trains with ARP 120 Dep on: Fri Oct 27

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.