Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Mar 30, 2017 12:21:42 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Mar 30, 2017 12:21:42 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by हिसार जंक्शन
Page#    404 Blog Entries  next>>
  
★★★  General Travel
0 Followers
15295 views
Oct 27 2015 (19:01)   HSR/Hisar Junction (6 PFs)

हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Entry# 1630444            Tags   Past Edits
Headlines from today's Function of Laying of Foundation Stone for #CoachCareComplex by #RM Mr Suresh Prabhu.
The CCC contains....
- A washing line (24+2 coaches but RM announced it will be of 28 coaches)
- A sik line/Shed for fully inspection of coaches
-
...
more...
An Office Complex which is environmently green
- A Depot for daily uses instruments & Spare Parts.
The representatives of Hisar (MP-Dhusyant Chautala , MLA- Kamal Gupta) demanded of-
1-Re develop of Hisar Junction (build 115 years ago and after that no such chnages is come here)
2-Make Hisar as Head Quartr as official have to travel 600km for work which is way lone and hisar is surrounded by three division (Delhi,Ambala,Bikaner) which means we have to talk three divisions for a project to took place.
More over that the farmers are ready to give there land at Nyoli Kalan (10RKM away from HSR on HSR-BTI line )
3-Senction work for Hansi-Jind (35km) & Uklana-Narwan (29km) whose survey report has been come to GM and found feasibily positive & work for HNSI-ROK rail line.
4-Senction work for ROB's at Surya nagar & Dabra Chawk (whose DPR is done) & RUB at patel nagar.
5-Allot fund for railway line as official only senction rs 10000 For the project.
#RM Mr Suresh Prabh replies,
1-Hisar is one of the 400 station whose development is done under PPP model.
2-Hansi-ROK rail line is having some issue about land acquisition , as soon it resolved we'll be on the ground.
3- The ROB at surya nagar will be soon on earth & i believe i'll get the chance for laying the foundation stone.
4- I have senction 60 lacs for the washing line project right now and remaining will be provided as it requires.
5-A DEMU train will be run after the complition of Washing Line.
Before leaving he said , i have all the demands from the representatives as my style of work is that " I do first then i speak, qouted about her grandmother " and i am not promising right now but you'll surely see better for your city.

15 posts - Oct 2015

5 posts - Apr 2016

4 posts - May 2016

6 posts - Jun 2016

3 posts - Nov 2016

3 posts - Dec 2016

1 posts - Jan 2017

3 posts - Thu Feb 16, 2017

  
1400 views
Feb 16 2017 (21:04)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   9877 blog posts   14933 correct pred (63% accurate)
Re# 1630444-48            Tags   Past Edits
is this rail line construction washing pit

1 posts are hidden.

  
405 views
Mar 26 2017 (22:07)
हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Re# 1630444-50            Tags   Past Edits
Updated on CCC/Hisar as on 26/03/2017

  
199 views
Yesterday (14:26)
rohitgl   3 blog posts   1 correct pred (50% accurate)
Re# 1630444-51            Tags   Past Edits
Thanks for sharing pictures... seems it will take time to complete.. let's pray that work should finish fast with good quality infrastructure which should stay for decades...

  
94 views
Today (10:14)
हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Re# 1630444-52            Tags   Past Edits
Trail Run on Washing Line Track today ! Gorakhdham Exp to be run on track !

  
77 views
Today (10:16)
हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Re# 1630444-53            Tags   Past Edits
Thnku Bro ! Yes, i guess 2 months for Washing line and approx same for the Pit line !
  
★★  Info Update
0 Followers
3155 views
Feb 16 2017 (15:26)   HSR/Hisar Junction (6 PFs)

हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Entry# 2166780            Tags   Past Edits
Hisar-Jakhal #Electrification (Part of MTJ-AWR-RE-HSR-JHL-DUI-LDH Elect.)(where RE-HSR-LDH is on High Rise being feeder route for WDFC) Update !!

Digging work almost completed (source-RF from Jakhal)
Poles being erected on the section
Photo
...
more...
: Poles erected at Hisar on Hisar-Jakhal Section !!

7 posts - Fri Feb 17, 2017

  
2348 views
Feb 17 2017 (21:50)
हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Re# 2166780-8            Tags   Past Edits
Is saal me eloco bahut muskil hai...kuki abi to hsr-re complete me oct -nov lag jayega !

  
2297 views
Feb 18 2017 (10:30)
bti jhl without cross~   338 blog posts   3 correct pred (80% accurate)
Re# 2166780-9            Tags   Past Edits
ok, but bti rok par jrur start ho jayega

  
2244 views
Feb 18 2017 (13:32)
हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Re# 2166780-10            Tags   Past Edits
Rok-JHL tk ho ajyega ..but BTI dun knw....BTI tk structure bn gye qa ?

  
1368 views
Mar 03 2017 (12:01)
bti jhl without cross~   338 blog posts   3 correct pred (80% accurate)
Re# 2166780-11            Tags   Past Edits

  
★  
283 views
Mar 26 2017 (22:15)
हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Re# 2166780-12            Tags   Past Edits
Wiring started on Hisar-Barwala section !!
  
General Travel
0 Followers
887 views
Mar 16 2017 (18:00)   STD/Satrod (1 PFs)

रोहित सिंह मुंदालिया   386 blog posts   429 correct pred (66% accurate)
Entry# 2199738            Tags   Past Edits
SATROD STATION(std) on Rewari- Hisar section

3 posts are hidden.

  
556 views
Mar 16 2017 (19:47)
हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Re# 2199738-4            Tags   Past Edits
Mast pic bhai....great capture😄

2 posts are hidden.
  
Rail Fanning
0 Followers
1326 views
Mar 13 2017 (11:45)   12555/Gorakhdham SF Express (PT) | HSR/Hisar Junction (6 PFs) | KYN/WDG-4/12763

ALI™~   1170 blog posts   2153 correct pred (66% accurate)
Entry# 2195953            Tags   Past Edits
One of the first ISO 9001:2015 Certified 12555/56 Gorakhdham Sup Exp standing at @HisarJunction @sureshpprabhu @drmbikaner @gmner_gkp click here

  
1123 views
Mar 13 2017 (20:34)
हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Re# 2195953-1            Tags   Past Edits
Thanku bhai mera tweet share krne ke lie... IRI pr bhi post kia h
/blog/post/2195228

  
1135 views
Mar 13 2017 (20:38)
ALI™~   1170 blog posts   2153 correct pred (66% accurate)
Re# 2195953-2            Tags   Past Edits
Yes bro...
  
★★  Rail Fanning
0 Followers
1553 views
Mar 12 2017 (17:21)   12556/Gorakhdham SF Express | HSR/Hisar Junction (6 PFs) | KYN/WDG-4/12763

हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Entry# 2195228            Tags   Past Edits
ONE of The First ISO 9001 Certified Train 12555/56 GORAKHDHAM SUPERFAST EXP Lead by "HOLI SPECIAL LINK" KYN/WDG4/12763 Refreshing at #Hisar Junction !!
" It Is One Of The First ISO 9002 Certified Trains Of India, To Be Introduced, Because Of Its Security Features and High Priority In, Indian Railways Network"-Wiki

  
1382 views
Mar 12 2017 (17:27)
▀▄▀▄▀▄ αиιкєт ▄▀▄▀▄▀~   4503 blog posts   336 correct pred (66% accurate)
Re# 2195228-1            Tags   Past Edits
It's 9001:2015 ISO certified train.

  
1356 views
Mar 12 2017 (17:32)
हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Re# 2195228-2            Tags   Past Edits
I think on wiki it is wrong !!

  
1433 views
Mar 12 2017 (19:15)
Abhishek Jaiswal*^~   45239 blog posts   18375 correct pred (70% accurate)
Re# 2195228-3            Tags   Past Edits
Finally they have implemented my suggestion of adding iso tag on train board :) Take a look at @abhie_jaiswal's Tweet: click here
Excellent captures.

  
1145 views
Mar 13 2017 (00:43)
GKP LKO Section 120kmph Sucessful Trail Done~   2719 blog posts   5 correct pred (100% accurate)
Re# 2195228-4            Tags   Past Edits
Nice click😊👍
  
★★★  Info Update
Dec 03 2015 (21:50)   HSR/Hisar Junction (6 PFs)

हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Entry# 1669885            Tags   Past Edits
Finally!! Got up early and planned a short trip to Rewari to providing you latest updates on RE-MHU-HSR #Electrification & #Doubling.
Board train : 54835 (HSR-RE PXGR)
Return Board train :59721 (JP-HSR FAST PXGR)
Highlights : ( Statics are in % & acc to my data )
◆◆Doubling
...
more...

●RE-KSI work almost done 99% including track laying,linking and signalling. 1% remainedmained for track linking.
●KSI-MHU work for track laying & linking is done almost 60%.Levelling work done 80%.Remaining work left 20%.
◆◆◆Overall work done 65-70%
◆◆Electrification
●Railway is setting up TSS at STD & RE
●RE-KSI work for pole basic structure is complete on both side (up-dwn) . Pole erected 70%.
●KSI-MHU work for pole basic structure is in progress
●MHU-HSR work for pole basic structure completed till Hansi (HNS) (50KM).
Pole have been erected from MHU to in between BWK-JKZ (35KM).
Wiring & OHE Eqip have been completed till BWN (14KM)
●●Work for Plateforms including increase in height and 2nd platefrom are in progress till BWK.
KSI will now have 3 Plateforms currently only have single.
●● Today i saw heavy load on RE-HSR track met with 10 WDG with 10 different Goods and Coal train
◆◆◆ IMP NEWS: RAILWAY is CONSTRUCTES A BY-PASS LINE TO IGNORE REWARI UNDER WDFC WHICH CONNECT RE-HSR SECTION TO RE-FL SECTION UNDER WDFC. A GREAT RELIEF !! (this is not confirmed news ...but i am informing you as i saw rly constructing bridge and other work just 10km before rewari on HSR-RE section)
Today's Blog Upload
●Doubling
●Electrification
●HSR-RE Pxgr - 54835
●JP-HSR Fast Pxgr - 59721
●DEE-BDTS GR - 12215
●BDTS-DEE GR - 12216
●SLN-ADI Exp - 19404
●VARIOUS WDG LOCO PICS
●Various Station pics
#Hisar

27 posts - Dec 2015

1 posts - Jan 2016

2 posts - Feb 2016

28 posts - Mar 2016

4 posts - Apr 2016

1 posts - May 2016

5 posts - Jul 2016

3 posts - Aug 2016

16 posts - Sep 2016

3 posts - Oct 2016

16 posts - Nov 2016

2 posts - Dec 2016

1 posts - Jan 2017

1 posts - Thu Mar 02, 2017

  
457 views
Mar 06 2017 (08:06)
हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Re# 1669885-116            Tags   Past Edits
Commissioning of double and electrification bw Rewari-Kosli of RE-MHU section !!

  
380 views
Mar 06 2017 (14:00)
bti jhl without cross~   338 blog posts   3 correct pred (80% accurate)
Re# 1669885-117            Tags   Past Edits
electric fiction be crs hoga

5 posts are hidden.

  
1121 views
Mar 07 2017 (11:19)
हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Re# 1669885-123            Tags   Past Edits
Acc to tweet....it is commissioned...so all done

  
1029 views
Mar 07 2017 (13:17)
bti jhl without cross~   338 blog posts   3 correct pred (80% accurate)
Re# 1669885-124            Tags   Past Edits
ok sir g

  
711 views
Mar 12 2017 (09:16)
हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Re# 1669885-125            Tags   Past Edits
Update !! First eloco on section WAG 5 /JHANSI
  
★  Info Update
0 Followers
3645 views
Feb 05 2017 (18:26)  

हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Entry# 2152635            Tags   Past Edits
Rohtak-Bhiwani #Electrification Update !!
Basic Structure : in between Kharak-Bamla
Poles Erected- just before Lahli

14 posts - Feb 2017

  
Mar 04 2017 (07:38)
रोहित सिंह मुंदालिया   386 blog posts   429 correct pred (66% accurate)
Re# 2152635-15            Tags   Past Edits
UPDATE-
DIG COMPLETED UPTO BAMLA
POLES ERECTED UPTO-KALANAUR KALAN
TSS WORK STARTED AT KALANAUR KALAN
Video link
...
more...

1 posts are hidden.

  
488 views
Mar 04 2017 (14:25)
हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Re# 2152635-17            Tags   Past Edits
Thnku bhai for updates

1 posts are hidden.

  
692 views
Mar 04 2017 (15:17)
bti jhl without cross~   338 blog posts   3 correct pred (80% accurate)
Re# 2152635-19            Tags   Past Edits
status update of bnw to hsr?

4 posts are hidden.

  
789 views
Mar 05 2017 (10:06)
हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Re# 2152635-24            Tags   Past Edits
Bnw -Hsr wiring done ?

  
790 views
Mar 05 2017 (15:16)
रोहित सिंह मुंदालिया   386 blog posts   429 correct pred (66% accurate)
Re# 2152635-25            Tags   Past Edits
I mean wiring at bhiwani ....which was previous halted
  
Info Update
0 Followers
1401 views
Feb 20 2017 (18:40)   14321/Ala Hazrat Express (via Bhildi)

हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Entry# 2172043            Tags   Past Edits
Permanent augmentation of two GEN coaches in 14321/14322
#moderator or #admins sir please update the following

  
1364 views
Feb 20 2017 (19:01)
Pran Pratim Ghosh   20310 blog posts   94961 correct pred (75% accurate)
Re# 2172043-2            Tags   Past Edits
24 coaches ho jayenge.
  
★  Rail Fanning
0 Followers
1935 views
Feb 20 2017 (18:11)   HSR/Hisar Junction (6 PFs) | PTRU/WDG-3A/13531

हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Entry# 2172022            Tags   Past Edits
#ScienceExpress lead by 13531/PTRU/WDG 3A standing on Plateform No. 6 at #HisarJunction
1- PTRU/WDG 3A/13531
2- Science Express
3-TB of Science Express
4- Solar Pannel fitted coaches of #ScienceExpress
...
more...

5- Train standing on PF 6 of Hisar

  
1492 views
Feb 20 2017 (18:35)
Mukesh   21 blog posts
Re# 2172022-1            Tags   Past Edits
I think common problem with NWR Stations is
Lack of facilities even proper flooring...
However, most of them seem cleaner than their eastern counterparts.
Churu Jn.

4 posts are hidden.
  
★★  General Travel
0 Followers
1873 views
Feb 18 2017 (11:36)   CUR/Churu Junction (3 PFs)

हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Entry# 2169097            Tags   Past Edits
चुरू-सीकर खंड पर आमान परिवर्तन कार्य हेतु परीक्षण रेलगाड़ी चलाई जारही है।आमजन कृपया अनाधिकृत रूपसे रेललाइन पार न करे !
Source : twitter NWR
Trial Run on Churu-Sikar newly BG line !

  
1519 views
Feb 18 2017 (11:48)
200 LHB trains in India^~   79752 blog posts   5093 correct pred (78% accurate)
Re# 2169097-1            Tags   Past Edits
1 month delayed ho gaya trial

  
1408 views
Feb 18 2017 (13:31)
हिसार जंक्शन   1089 blog posts   11 correct pred (58% accurate)
Re# 2169097-2            Tags   Past Edits
Acha! Chalo der aaye durusht aaye !! Trail successful ho jaye !

  
1495 views
Feb 19 2017 (17:54)
Sikar churu~   105 blog posts
Re# 2169097-3            Tags   Past Edits
No 2 pic kaha ki h.... Ye train fatehpur kab tak aaigi..?
Page#    404 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Apr 9
Trains with ARP 15 Dep on: Fri Apr 14
Trains with ARP 30 Dep on: Sat Apr 29
Trains with ARP 120 Dep on: Fri Jul 28

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site