Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Feb 27, 2017 21:50:21 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Feb 27, 2017 21:50:21 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by deepakyerr~
Page#    639 Blog Entries  next>>
  
Info Update
0 Followers
152 views
Today (07:30)   VSKP/Visakhapatnam Junction (8 PFs)

deepakyerr~   786 blog posts
Entry# 2179569            Tags   Past Edits
Kothavalsa Kirandul Doubling works 450-460km line 5146 cr 2022 completion target
Kothavalsa koraput section 30 tunnels ,16km tunneling
379 bridges 43 major
Old line 1966 completion date 445 km 58 tunnels 84 major bridges.
The
...
more...
report says the line will be laid on other side of hills and valley at some stretches as its not feasible for parallel line and 5 new stations I'll come up. Araku Boddavara 69 km stretch may increase up to 70-90km line I'll run 10-50-100 m away while araku koraput the line may move farther and new stations may come.
Kothavalsa koraput 190km 2500cr total 5146 cr allocation for 2017-18 300cr.
  
General Travel
0 Followers
556 views
Feb 23 2017 (17:10)   BBS/Bhubaneswar (6 PFs)

Venkat వెంకట్   2291 blog posts
Entry# 2175732            Tags   Past Edits
Bhubaneswar is rocking in Airways. It crossed 2.5 lakhs passengers in Jan 17. Also now first direct International flight of odisha going to start March end.
Air Asia going to start Bhubaneswar to Kulalampur 4 days a week flight.
Bhubaneswar - delhi route has highest flyers
BHUBANESWAR BENGALURU 29212
BHUBANESWAR CHENNAI 4887
...
more...

BHUBANESWAR COIMBATORE 647
BHUBANESWAR DELHI 86961
BHUBANESWAR HYDERABAD 44477
BHUBANESWAR KOLKATA 42320
BHUBANESWAR MUMBAI 40815
BHUBANESWAR VARANASI 3009
BHUBANESWAR VISAKHAPATNAM 1520

9 posts are hidden.

  
173 views
Feb 25 2017 (16:27)
deepakyerr~   786 blog posts
Re# 2175732-11            Tags   Past Edits
These data are two way figures in that sector BbS to vskp 703 Vskp to BBS 817 total 1520 travellers.

  
150 views
Feb 25 2017 (16:29)
deepakyerr~   786 blog posts
Re# 2175732-12            Tags   Past Edits
Venkat he was inquiring from which site u can get the air traveller data of BBS or another airport.
  
General Travel
0 Followers
2340 views
Feb 10 2017 (07:48)   18509/Visakhapatnam - Hazur Sahib Nanded Express

SGNR HS Inaugural 27 Feb^~   78815 blog posts   5089 correct pred (78% accurate)
Entry# 2158326            Tags   Past Edits
ECoR conversion to superfast for #Taag2017

13 posts - Fri Feb 10, 2017

  
1164 views
Feb 10 2017 (15:19)
Venkat వెంకట్   2291 blog posts
Re# 2158326-14            Tags   Past Edits
main Bottle neck is at Visakhapatnam Outer. GPT to VSKP outer track fit for 80 kmph.
At GPT where HWH,MAS line connected at that connection MPS 30 kmph. If these two eliminated then Huge tome can be saved.
Railways has enough place to lay another 2-3 tracks here but neglected

  
1042 views
Feb 10 2017 (17:50)
deepakyerr~   786 blog posts
Re# 2158326-15            Tags   Past Edits
The MPs at Gopalpatnam is now 15kmph. Yes third line will only decongest and also the mps needs to be improved from kancharapalem loco tried Shep into platforms.

  
1133 views
Feb 10 2017 (17:56)
Venkat వెంకట్   2291 blog posts
Re# 2158326-16            Tags   Past Edits
May be a TSR for some time. Its 30 kmph at crossing as i my self there at that location when working going on last time.
VSKP outer means Kancharapalem bridge only. From there 2 tracks suddenly becomes 8. Needs more tracks there else 2 tracks via coaching complex can directly join at GPT as already land is there.

  
1097 views
Feb 10 2017 (18:57)
12752   730 blog posts   4 correct pred (80% accurate)
Re# 2158326-17            Tags   Past Edits
even if we get third and fourth line, the MPS wont be changed much as there are lot of switching of tracks to be done to go in and out of PF's. and 15-20kmph is the max you find in any big junctions ...so on that front cant change much

1 posts are hidden.

  
335 views
Feb 25 2017 (14:45)
gyanendrayadav13   64 blog posts
Re# 2158326-19            Tags   Past Edits
Another problem for train no. 18516 is the route from KDJR to DPS. In the present time table, time from KDJR to NYG, distance of 32 km has been kept 50 mins, from NYG to BSPX, distance of 24 km, 45 mins and from BSPX to DPS, distance of 32 km, 60 mins. This has been kept for a reason. There is speed restriction in this section due to too many sharp curves and trains are given maximum speed permission of only 40 kmph. Actually trains travel at 30 kmph speed only in this section. The train 07438, KCG- TATA Express has been kept a time of 38 Mins to travel from BSPX to DPS. But in practice it never travelled this distance below 60 Mins. What I mean is that until the section is modified and NOC is given for higher speeds, the trains will travel at the speed of...
more...
30 kmph only in this section. Now in the new time table, the time to run from KDJR to TATA has been decreased. But I feel that in practise the train will run taking the same time as it takes now and reach TATA after 11:30 am. The Name Tag Super Fast is only to cheat the public and increase the fare of its tickets.

6 posts are hidden.
  
Rail News
0 Followers
255 views
IR Affairs
Feb 22 2017 (22:18)   PMO to Indian Railways: Speed up doubling of tracks, electrification

shakti.newdelhi   9 news posts
Entry# 2177377   News Entry# 294535         Tags   Past Edits
PMO to Indian Railways: Speed up doubling of tracks, electrification
Taking note of the slow execution of infrastructure projects, the Prime Minister's Office has asked the Railways to speed up the electrification work and laying of new tracks.
By: PTI | New Delhi | Published: February 22, 2017 9:41 PM
Taking note of the slow execution of infrastructure projects, the Prime Minister’s Office has
...
more...
asked the Railways to speed up the electrification work and laying of new tracks. In a letter to Chairman Railway Board A K Mital, Principal Secretary to Prime Minister Nripendra Misra said “You are aware of the focus of the government towards the development and modernisation of facilities in railways”. Electrification and doubling, including laying of the new tracks, are crucial for the expansion of rail network. Doubling is laying of another set of rail tracks along the existing route which enables its decongestion. However, PMO has observed that the project execution in electrification and doubling were below the target by the end of the year 2016.
“While reviewing the progress up to 2016, against the target of 1500 km of doubling, only 531 km has been achieved. In electrification, against the target of 2000 route km, only 1,210 km has been achieved by the railways,” Misra has stated in the letter written on January 31.

2 posts are hidden.

  
158 views
Feb 25 2017 (08:12)
deepakyerr~   786 blog posts
Re# 2177377-3            Tags   Past Edits
Woke up 20 yrs late when NHAI was formed to execute golden quadrilateral of 6000km of NH to 4 lanes they should have constituted IR to take Quardrapuled the existing double tracks connecting 4 metros estimating the growth of country due to globalization liberelisation. By now 10000km of track could have been 4 tracks.
  
General Travel
0 Followers
153 views
Feb 24 2017 (18:08)  

Pandian Exp   43 blog posts   2219 correct pred (79% accurate)
Entry# 2177134            Tags   Past Edits
Auto upgradation is possible on waiting list ticket or confirmed ticket....or both....??? If I book ticket in general waiting list 70 in sleeper class and opt for upgradation then will my ticket get upgrade or it'll get into RAC....??? For day after tomorrow journey in 12637 pandian exp from chennai to madurai...!!

  
128 views
Feb 24 2017 (18:18)
deepakyerr~   786 blog posts
Re# 2177134-1            Tags   Past Edits
As current booking is available online now chances of upgradation have decreased even though you opt in check box. If it is done u are lucky.

  
114 views
Feb 24 2017 (18:23)
Pandian Exp   43 blog posts   2219 correct pred (79% accurate)
Re# 2177134-2            Tags   Past Edits
Ok thank u...!!
  
General Travel
1 Followers
72 views
Feb 24 2017 (15:39)  

Noora Kader   13 blog posts
Entry# 2176968            Tags   Past Edits
Dear sirs.iam booked a ticket 3rd ac from guwahaty to palghat on 26th April train no .12516 . my booking status was waiting list WL5/WL1 when booked on 22-2-2017. now RAC.12 have any chance to get confirmed berth

  
105 views
Feb 24 2017 (16:34)
deepakyerr~   786 blog posts
Re# 2176968-1            Tags   Past Edits
It will be confirmed by that time.
  
Travel Question
0 Followers
208 views
Feb 24 2017 (16:09)   16301/Venad Express | ERS/Ernakulam Junction (South) (6 PFs)

RbK~   705 blog posts   9878 correct pred (86% accurate)
Entry# 2177013            Tags   Past Edits
Is it possible to penalize a passenger boarding a reserved 2S coach in an Express train(say an Intercity Express), with an unreserved II class ticket (applicable to the same train for travel in Unreserved coach)?
If yes, what is the maximum amount that can be realized as fine?
Though the difference in fare was just the reservation charge, saw a TTE warning such passengers with fine upto Rs. 300/-. Hence just curious to know if such a fine is possible.

  
161 views
Feb 24 2017 (16:32)
deepakyerr~   786 blog posts
Re# 2177013-1            Tags   Past Edits
I travel in janmabhoomi exp Vskp SC in general sitting coaches reserved. Lot of unreserved travellers board the reserved coaches and all the corridors are filled. TTE checks the tickets and if someone is seated in reserved coach he collects rs 15 as reservation fee and gives an receipt and doesn't Ccollect any amount from standing travllers . Never saw TTE asking or warning fine of rs 300. I think its possible to collect as unreserved cannot travel in reserve coaches and are liable to be penalize fine.

1 posts are hidden.
  
Rail Fanning
0 Followers
631 views
Feb 21 2017 (17:26)   17230/Sabari Express (PT) | GNT/Guntur Junction (7 PFs)

Hx Bza Penna Express~   196 blog posts
Entry# 2173220            Tags   Past Edits
Sabari Express with Ed Wap4 loco ready to leave pf1...
Gnt-Tel doubling with electrification status poles are erected almost entire route and some part is with ground levelling and poles

1 posts are hidden.

  
278 views
Feb 24 2017 (08:00)
deepakyerr~   786 blog posts
Re# 2173220-2            Tags   Past Edits
The section is Guntur Guntakal doubling 403 km with 80-100km of track in forest section with chat route. It requires at least 3000-4000crs for and huge allocations every financial year for completion.So the time period is 2019.
  
Travel Question
0 Followers
220 views
Feb 23 2017 (14:55)   18501/Vishakhapatnam - Gandhidham Weekly Express

Bharat Mukkamala   290 blog posts   250 correct pred (64% accurate)
Entry# 2175519            Tags   Past Edits
Is it possible to get a seat to sit in general coach in 18501 in VSKP?

  
181 views
Feb 23 2017 (15:59)
deepakyerr~   786 blog posts
Re# 2175519-1            Tags   Past Edits
Yrs u can get seat as they are 6 coaches but make sure u reach the platform by the time train is parked on platform. So at least 45-60 min before dep time.
  
Rail News
0 Followers
874 views
IR AffairsSWR/South Western  -  
Feb 21 2017 (13:02)   Going to Mars was way, way cheaper

Hareesh Mangalam*^~   1172 news posts
Entry# 2173132   News Entry# 294443         Tags   Past Edits
Bengaluru-Hassan rail line took 21 years to be completed and cost almost Rs 1,300 crore, three times the cost of launching ISRO's Mars mission
One must congratulate all the Railways ministers of India and the governments of Karnataka between 1996 and 2017 for the completion of the Hassan-Bengaluru broad gauge line via Shravanabelagola.
However, it took almost 21 years to complete and cost of the project was four times the initial sanctioned amount due to delay in implementation. The safety inspection was conducted recently, and commercial operations may begin soon.
The
...
more...
website of the South Western Railways pegs the total cost of 167-km line at Rs 1,289.92 of crore, three times the cost of India's Mars Orbiter Mission (Rs 450 crore).
The railway line was the dream project of former prime minister HD Devegowda, who represents the Hassan Lok Sabha constituency.
The line was sanctioned during his stint as prime minister in 1996-97 with an initial estimated cost of Rs 295 crore, as per the original sanctioned pink book cost.
However, the final cost went up as much as four times of that estimation.
According to the pink book, 8 km of tracks was to be constructed per year with each kilometer costing Rs7.72 crore.
Of the total 167 km of the total project length, the 44 km track between Hassan and Shravanabelagola was commissioned in 2006 during Mahamastakabhishekha of Bahubali, and work between Nelamangala and Chikkabanavara (off Bengaluru) of 14 km was completed in 2013 (a total of 58 km for both work) and took 17 years.
On calculation, it comes out that a shocking 0.30 km of work per year was done in these two stretches.
Railways sources told BM that the commissioner for railway safety has conducted a statutory inspection of the section from Nelamangala to Shravanabelagola between February 6 and 10, including speed run trial which shows a possible 120 km per hour speed.
The sections from Krantiveera Sangolli Rayanna Station (KSR), Bengaluru and Nelamangala on the one end, and Hassan and Shravanabelagola on the other end have already been commissioned for passenger traffic.
The remaining stretch from Nelamangala to Shravanabelagola will be started after authorisation by the commissioner for railway safety, probably by the end of this month.
Speaking on the delay,rail expert Sanjeev V Dyamannanavar said, “The cost got escalated due to Karnataka government's failure to acquire land in required time. Another reason for the delay was the alignment issues. Initially, the railway line was to pass through Vijay Mallya owned stud farm. However, following objections, Railways decided to go for re-alignment to save the stud farm. However, the farmers who were about to lose the land due to the re-alignment then approached court which ruled in their favour and directed the court to go for the alignment over Kunigal stud farm. At least five years was lost in this.Now, to recover the huge investment, the Railways have to convert Hassan into a railway hub by running trains from different parts of the state, otherwise it would become a non-profitable line like the Chikkamagaluru-Kadur or ChikkaballapurKolar lines. Even the freight traffic should be routed to Mangaluru port using Hassan railway line.“
It may also be recalled as to how Hassan-Shravanabelagola train service was operational in 2007 itself and there was a night train from Shravanabelogala to Bengaluru via Hassan and Arasikere. The train would leave Shravanabelagola in the night and reach Bengaluru in the morning (while the road route would take a couple of hours) and subsequently the train was discontinued.
Tunnel thrill
Adding to the glory of the track between Bengaluru and Mangaluru, the line will have a tunnel constructed at Marur village in Biskur forest area between Nelamangala and Kunigal. The passengers will be enthralled to travel in tunnel that is almost 30 metres below the ground level. The tunnel will be one kilometer long in an area where the forest is not so dense. It will be the closest rail tunnel to Bengaluru.
Distance and journey time reduced
The take-off point for the new line is Chikbanavar on Bengaluru-Tumakuru BG line. Chikbanavar is 13 kms from KSR Bengaluru City Railway station.The distance from Chikbanavar to Nelamangala is 14 km. Two pairs of trains are currently running between KSR Bengaluru City and Nelamangala.
The much awaited line will reduce the distance between Bengaluru and Hassan by 50 km via Arsikere and about 87 km via Mysuru. With distance being reduced, the journey time between these two junctions will be reduced by one hour. The passengers commuting to Mangaluru will also enjoy the benefit of distance being reduced by 50 km via Arsikere and 107 km via Mysuru.
This is a cost sharing project between the government of Karnataka and Ministry of Railways.
Blame game on for Whitefield-Kolar railway line project
The Whitefield-Kolar railway line is all set to take the route of Hassan-Bengaluru railway line via Shravanabelagola, as it seems it is going to take a long time to be completed and the initial estimate costs might go through the roof.
The railway line of 52 km between Whitefield and Kolar was sanctioned in the 2011-12 Railways budget for Rs 343 crore, with a cost sharing system between Indian Railways and the government of Karnataka.
The project is likely to take decades to finish as the physical progress of the project is shown as `Nil' on the Railways website.
Speaking to Bangalore Mirror, Ashok Gupta, chief administrative officer (construction), Bangalore Railway Division said, “There has not been any progress as the state government still has not allotted the required land of 831 acres.“
Ministers at the helm
During the railway budget years between 1996 and 2017, Railways got 15 ministers, with Mamata Banerjee and Nitish Kumar taking charge twice
Two ministers from Karnataka, Mallikarjuna Kharge and DV Sadananda Gowda, have also taken charge as Railways ministers during this period

7 posts are hidden.

  
383 views
Feb 23 2017 (15:56)
deepakyerr~   786 blog posts
Re# 2173132-8            Tags   Past Edits
NH too face land acquisitions like railways and are not completed in time. They too take 1-2 yrs for land acquisitions and project competition takes 36-48 months though the stipulated time is 30months after handing over land. Total project will take 60 months and cost overruns.

3 posts are hidden.
Page#    639 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 9
Trains with ARP 15 Dep on: Tue Mar 14
Trains with ARP 30 Dep on: Wed Mar 29
Trains with ARP 120 Dep on: Tue Jun 27

  
  

Rail News

  • NWRailways on Twitter:  News Entry# 294909
    by: anilks~  Today (21:50)


    रेवाडी-भिवानी रेलखण्ड पर दोहरीकरण कार्य के लिए नाॅन इण्टरलाॅकिंग कार्य
  • సలహాలకు నజరానా 84 లక్షలు!  News Entry# 294908
    by: Ravichandra Madagala~  Today (21:49)


    న్యూఢిల్లీ, ఫిబ్రవరి 26(ఆంధ్రజ్యోతి): ‘రైళ్లలో ప్రయాణం ఓ నరకం. దీన్ని బాగు చేసేవాళ్లు లేరు. చెప్పినా పట్టించుకునేవాళ్లూ లేరు’ అని తిట్టుకునే ప్రయాణికులు ఎందరో ఉన్నారు. ఈ అపవాదు నుంచి బయట పడాలని సంకల్పించిన రైల్వేశాఖ, సలహాలు స్వీకరించేందుకు ముందుకు వచ్చింది. ఈ క్రమంలో ఓ బంపర్‌ ఆఫర్‌ కూడా ప్రకటించింది. 6 రంగాలపై సలహాలు స్వీకరించనున్న రైల్వే శాఖ, ఏకంగా రూ.84 లక్షల మేర బహుమతులు ఇస్తామని వెల్లడించింది. దీనికి...
  • reservation policy will implement in food stall on railway station know full detail - Hindustan  News Entry# 294907
    by: anilks~  Today (21:47)


    रेलवे स्टेशनों पर स्टॉल के ठेके में लागू होगा आरक्षण, ये होंगे नियम
  • చెన్నైలో ట్రైన్‌సెట్ల తయారీ  News Entry# 294906
    by: Ravichandra Madagala~  Today (21:43)


    దిల్లీ: సొంతంగానే ట్రైన్‌సెట్లను తయారు చేయాలని రైల్వే శాఖ నిర్ణయించింది. వీటి తయారీకి ప్రపంచవ్యాప్త టెండర్లను ఆహ్వానించినా తగిన స్పందన రాకపోవడంతో సొంత వనరులను ఉపయోగించనుంది. గంటకు 160 కి.మీ.వేగంతో వెళ్లే ఈ ట్రైన్‌సెట్ల (ఇంజను, బోగీ కలిసి ఉండే మెట్రో తరహా రైళ్లు)ను చెన్నైలోని రైలు పెట్టెల కర్మాగారం (ఇంటెగ్రల్‌ కోచ్‌ ఫ్యాక్టరీ-ఐసీఎఫ్‌)లో తయారు చేయనుంది. వీటికి ట్రైన్‌-2018 అని పేరు పెట్టింది. ఈ మొత్తం ప్రాజెక్టుకు రూ.200 కోట్లు...
  • SouthWestern Railway on Twitter:  News Entry# 294905
    by: anilks~  Today (21:42)


    Hon'ble MR @sureshpprabhu announces New Catering Policy 2017 for
    Mobile Units & Base Kitchens & Static Units

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site