Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Feb 25, 2017 10:07:14 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Feb 25, 2017 10:07:14 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by utkal andhra~
Page#    608 Blog Entries  next>>
  
★★  Rail Budget
0 Followers
1419 views
Feb 01 2017 (15:48)  

awes khan*^~   41010 blog posts   2158 correct pred (78% accurate)
Entry# 2147915            Tags   Past Edits
Pahle Rail budget hota tha to puchte the apne apne region ko kya mila ab to lagta hai puchna padenga budget me Railway ko kuch mila ya nahi.

3 posts are hidden.

  
446 views
Feb 01 2017 (16:11)
utkal andhra~   691 blog posts
Re# 2147915-4            Tags   Past Edits
Railway has lost its importance to some extent.

10 posts are hidden.
  
Pic Upload
0 Followers
1055 views
Jan 26 2017 (19:23)   PUU/Punalur (2 PFs)

livisam~   129 blog posts
Entry# 2141359            Tags   Past Edits

  
208 views
Jan 26 2017 (19:28)
utkal andhra~   691 blog posts
Re# 2141359-1            Tags   Past Edits
I can't read the language. Some one plz translate it into English.Thanks in advance.

  
222 views
Jan 26 2017 (21:16)
livisam~   129 blog posts
Re# 2141359-2            Tags   Past Edits
The Pre CRS inspection took place in PLR - EDMN Stretch. Expecting the CRS inspection before Feb 12th. After that two passenger trains will be extended to Edamon from February last onwards.
However the speed limit from PLR to ARYNKV will be 30 km/hr. as the section is too risky. The distance will be reduced to Chennai through this route. The remaining inspection of various departments will take place in the coming days

9 posts are hidden.
  
General Travel
0 Followers
475 views
Jan 26 2017 (08:14)   SCT/Sengottai (4 PFs)

livisam~   129 blog posts
Entry# 2140586            Tags   Past Edits
Trial run on SCT-AYK strech on February 2nd week after that this line opened for passenger traffic.says SR chief Engr. Suyambu lingam(construction)

  
388 views
Jan 26 2017 (08:40)
utkal andhra~   691 blog posts
Re# 2140586-1            Tags   Past Edits
Some one plz translate the news in Tamil into English so that non-Tamil Rail fans can understand and enjoy the good news about the gauge conversion of Sengottai -- Punalur.

  
337 views
Jan 26 2017 (09:30)
livisam~   129 blog posts
Re# 2140586-2            Tags   Past Edits
Already i give with that gist translation
  
General Travel
0 Followers
2898 views
Jan 07 2017 (08:10)   12740/Secunderabad- Visakhapatnam Garib Rath Express

utkal andhra~   691 blog posts
Entry# 2118570            Tags   Past Edits
REAL GARIBS are living in SRIKAKULAM district . But S.C.Railway is not in favor of extending the GARIB RATH EXPRESS up to PALASA. It is high time the train is extended up to PALASA to provide a chance to the people of sklm district to experience the travel by AC coaches.

1 posts - Thu Jan 19, 2017

1 posts - Fri Jan 20, 2017

4 posts are hidden.

  
538 views
Jan 20 2017 (11:43)
DD DISLODGED BBSKJM SLOT   6152 blog posts
Re# 2118570-7            Tags   Past Edits
REAL GARIBS are living in SRIKAKULAM district . But Eco.Railway is not in favor of extending the 12831/32 GARIB RATH EXPRESS up to PALASA though it has average occupancy. It is high time train 12831/32 is extended up to PALASA to provide a chance to the people of sklm district to experience the travel by AC coaches.

2 posts are hidden.

  
378 views
Jan 20 2017 (12:37)
A good day ahead~   2339 blog posts
Re# 2118570-10            Tags   Past Edits
PSA is not in SCR. They will have to get the approval from ECoR. And ECoR will most definitely not agree to terminating the train at PSA. And SCR will not prefer to run the train any farther than PSA as it's frequency will have to be reduced then. So, it will remain at VSKP for the near future.

  
354 views
Jan 20 2017 (14:08)
tired f waitng4d PR SCRs train gets LHB rake~   1725 blog posts   34 correct pred (73% accurate)
Re# 2118570-11            Tags   Past Edits
To be precise PSA is not even in WAT dvsn.. Why will KUR dvsn even think of terminating it in PSA . same case happened with Visakha. ANd again same people who asked for extension to cater to PSA for serving North Andhra wil blame for extending it to Odisha territory. SO pls ask ECoR to cater to ur demand instead of blaming SCR alone,

3 posts are hidden.

  
483 views
Jan 20 2017 (15:25)
Guest: 81eb314e   show all posts
Re# 2118570-15            Tags   Past Edits
Ask RM FOR humsafar IT'S more affordable.

  
623 views
Jan 20 2017 (15:30)
Guest: 81eb314e   show all posts
Re# 2118570-16            Tags   Past Edits
Ask Khurda division for puri trains EXTEND TILL PSA OR CHE .
First Garib Rath Express belongs to AKP afterwards it got extended till VSKP.

6 posts are hidden.
  
General Travel
0 Followers
1734 views
Jan 13 2017 (21:46)   16182/Silambu Express

utkal andhra~   691 blog posts
Entry# 2126109            Tags   Past Edits
Gradually this train is to be extended up to kollam / tiruvanantapuram and will be made a daily train.This is a preliminary step in that direction.

  
518 views
Jan 20 2017 (10:34)
No more DLS or ELS Hereafter only a Locoshed*^~   9567 blog posts   497 correct pred (74% accurate)
Re# 2126109-1            Tags   Past Edits
No.
Podhigai will be extended. this will be at SCT

  
605 views
Jan 20 2017 (10:38)
▓██▓▒░sGs░▒▓██▓*^~   6114 blog posts   9817 correct pred (77% accurate)
Re# 2126109-2            Tags   Past Edits
Then the name "Silambu has to be lifted"

6 posts are hidden.
  
★★★  Info Update
0 Followers
2714 views
Jan 18 2017 (19:24)   BUDGP/Budhagumpa (1 PFs)

Foamer~   1265 blog posts
Entry# 2131671            Tags   Past Edits
Ginigera - Raichur New Railway Line.
------------------------------------------
-
New Station: Budhagumpa.
-
I
...
more...
visited the first station on the new railway line between Ginigera (GIN) and Raichur Junction (RC) - Budhagumpa, yesterday. Below are some pics and info of the station as well as the progress of the railway line. Hope it is informative.....
-
-------------------------------------------------- -------------------------------------------------- --------------------
-
Pic 1: Station Building.
Pic 2: Railway bridge over NH 50.
Pic 3: Trucks carrying crushed stones.
Pic 4: View from PF 1.
Pic 5: Towards Ginigera.
Pic 6, 7: Towards Gangavathi. The railway bridge over the NH can be seen.
Pic 8: Distance from Ginigera-Hosapete line: 9 Kms.
Pic 9: Incomplete loopline.
Pic 10, 13: View of the line.
Pic 11, 12: Road under bridge.
Pic 14: New concrete sleepers for the loopline.
-
-------------------------------------------------- -------------------------------------------------- --------------
Station Info:
-
Name: Budhagumpa, ಬೂದಗುoಪ.
No of PFs: 1, 1 mainline and 1 loopline.
Zone: SWR.
Division: UBL.
Address: Near NH 50, Koppal Taluk, Koppal district, Karnataka.
-
-------------------------------------------------- -------------------------------------------------- --------------
-
Complete line info:
-
From what I could gather, some 30-35 Kms of railway line has been laid. The work on other stations are on too. Once the track work at Gangavathi station too is completed, the line will be inaugurated it seems. Locals are hopeful that their demand for atleast a passenger to UBL and BAY are accepted.
-
Stations after Ginigera are:
Budhagumpa
Jabbalgudda
Chikkabenakal
Gangavathi
-

3 posts are hidden.

  
351 views
Jan 19 2017 (12:50)
utkal andhra~   691 blog posts
Re# 2131671-20            Tags   Past Edits
Thanks a lot for all the iformation and photos contributed by you,sir.

20 posts are hidden.
  
General Travel
0 Followers
743 views
Jan 10 2017 (08:11)   22613/Sangrami SF Weekly Express

utkal andhra~   691 blog posts
Entry# 2122013            Tags   Past Edits
plz attach A1 coach to the train.

  
622 views
Jan 10 2017 (11:17)
deepakyerr~   783 blog posts
Re# 2122013-1            Tags   Past Edits
Instead of 2ac one more 3 ac can be added along with sleeper as its short rake will be useful for intermediate stations till KGP

1 posts are hidden.
  
General Travel
0 Followers
912 views
Jan 10 2017 (07:56)   22604/Villupuram - Kharagpur SF Express

utkal andhra~   691 blog posts
Entry# 2121980            Tags   Past Edits
22603/22604 kgp- vm -kgp express timings at palasa and srikakulam road are very convenient for the tirupaty bound passengers . Unfortunately halts are not provided at these 2 stations . If halts are provided at these 2 stations at least for a period of 6 months on experimental basis , it will prove that the halts are justified.

  
787 views
Jan 10 2017 (09:20)
Hel wid Blog cnt wen derz no useful content in dem~   460 blog posts   28 correct pred (84% accurate)
Re# 2121980-1            Tags   Past Edits
not required

  
823 views
Jan 10 2017 (09:24)
Boxer Bhai~   38174 blog posts   12668 correct pred (61% accurate)
Re# 2121980-2            Tags   Past Edits
Actually this is prime time slot train running in scr
Instead of using for scr trains it given slot for other zones trains
Ya halt should be given why not
Tpj div send proposal to merge kgp vm into prr vm tri weekly run as single train pending in rb
  
General Travel
0 Followers
1165 views
Dec 27 2016 (16:51)   12898/Bhubaneswar-Puducherry SF Express

utkal andhra~   691 blog posts
Entry# 2106993            Tags   Past Edits
CC correction. No A2 Add B4 . Today i boarded the train

  
785 views
Jan 10 2017 (08:42)
Afraaz suhail 🚂🚄🚅~   3752 blog posts   568 correct pred (88% accurate)
Re# 2106993-1            Tags   Past Edits
Are you sure??
  
Info Update
0 Followers
1409 views
Jan 03 2017 (15:48)   MRTD/Morthad (1 PFs)

Rizwan NZB Jn~   216 blog posts
Entry# 2114769            Tags   Past Edits
#Mod #Admin #update #Moderator
Please update the Railway Station address as Nizamabad-Karimnagar Road, Morthad, Nizamabad Dist.

1 posts are hidden.

  
895 views
Jan 09 2017 (07:09)
utkal andhra~   691 blog posts
Re# 2114769-2            Tags   Past Edits
Is the construction work not completed up to ARMOOR?
Page#    608 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Mar 7
Trains with ARP 15 Dep on: Sun Mar 12
Trains with ARP 30 Dep on: Mon Mar 27
Trains with ARP 120 Dep on: Sun Jun 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site