Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Mar 29, 2017 05:31:55 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Mar 29, 2017 05:31:55 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Waiting for elocos in ET JBP section😌~
Page#    25 Blog Entries  next>>
  
★  General Travel
0 Followers
870 views
Mar 23 2017 (20:29)  

Waiting for elocos in ET JBP section😌~   41 blog posts
Entry# 2208343            Tags   Past Edits
Updates on Katni-Jabalpur electrification.
The work is going on with full pace between jabalpur to sihora.
The hole work is done till jabalpur outer and soon to be reached jabalpur station but after sihora till katni the work is very slow, in some places not even hole work is done.
Pic - Gosalpur station #ETALDELECTRIFICATION #JBPNEWS

  
661 views
Mar 23 2017 (21:04)
12121 मध्य प्रदेश संपर्क क्रांति एक्सप्रेस~   410 blog posts   5 correct pred (100% accurate)
Re# 2208343-1            Tags   Past Edits
Have you captures some more pics? If so, please post.

  
600 views
Mar 24 2017 (10:24)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2208343-2            Tags   Past Edits
so hope JBP-Sihora will get electrified soon and i think JBP station will be electrified at last only due to the block which has to be taken by contractor to complete work in JBP yard and in main station area and palatforms and good to see some pace comes in the JBP-KTE section for electrification and i think likewise ET-PPI JBP-Sihora work will complete before Sihora-KTE/KTES

  
315 views
Mar 25 2017 (13:37)
Waiting for elocos in ET JBP section😌~   41 blog posts
Re# 2208343-3            Tags   Past Edits
No i didn't captured pics.....

  
256 views
Mar 25 2017 (15:28)
Alcos made me RailFan 🚂   31 blog posts   2 correct pred (100% accurate)
Re# 2208343-4            Tags   Past Edits
are bhai abhi hi acha hai... jab electrification o jayega tab D locos ko bhot miss kroge
  
General Travel
0 Followers
247 views
Mar 23 2017 (20:23)  

Waiting for elocos in ET JBP section😌~   41 blog posts
Entry# 2208334            Tags   Past Edits
Updates on Katni-Jabalpur electrification.
The work is going on with full pace from jabalpur to sihora
The hole work is completed till jabalpur outer but after sihora till katni the work is very slow, in some places not even work of hole is done..... Pic - Gosalpur station
  
★★★  Info Update
0 Followers
2899 views
Mar 14 2017 (17:34)   MML/Madan Mahal (3 PFs)

tsrijan~   50 blog posts   3 correct pred (60% accurate)
Entry# 2197559            Tags   Past Edits
#Electrification
Finally, the foundation work for OHE masts has kicked off between MML and JBP. I talked to one of the staffs present at the site and he told me that KEC Intl.(which is doing the work b/w JBP and ET) will carry out the electrification work upto JBP coaching yard. Also, the work b/w MML and KEQ will commence shortly.

14 posts - Thu Mar 16, 2017

  
268 views
Mar 16 2017 (13:54)
Waiting for elocos in ET JBP section😌~   41 blog posts
Re# 2197559-15            Tags   Past Edits
Iss baar ke rail budget me kuch amount mila h electrification ke liye issiliye maine pucha...

  
335 views
Mar 16 2017 (13:56)
Bina Jn   174 blog posts
Re# 2197559-16            Tags   Past Edits
Agar Gauge conversion k sath sath electrification karenge to Gauge conversion aur slow ho jayega. Pahele Jabalpur-Gondia connectivity jyada jaruri hai eletrification to bad me bhi ho jayega.

7 posts are hidden.

  
Mar 16 2017 (18:27)
Waiting for elocos in ET JBP section😌~   41 blog posts
Re# 2197559-24            Tags   Past Edits
today i visit MML station the work is going on with full pace... the hole work is almost completed in pf 2 and 3.

  
324 views
Mar 16 2017 (22:47)
OHE over JBP~   1114 blog posts   64 correct pred (72% accurate)
Re# 2197559-25            Tags   Past Edits
Have the masts and pillers arrived at MML?

1 posts are hidden.

  
251 views
Mar 17 2017 (09:27)
Waiting for elocos in ET JBP section😌~   41 blog posts
Re# 2197559-27            Tags   Past Edits
Not arrived yet...

8 posts are hidden.
  
Info Update
0 Followers
742 views
Feb 22 2017 (14:22)   JBP/Jabalpur Junction (6 PFs)

Waiting for elocos in ET JBP section😌~   41 blog posts
Entry# 2174223            Tags   Past Edits
By next month the train will run till ghansore.
  
★★★  Info Update
Feb 08 2017 (13:21)   JBP/Jabalpur Junction (6 PFs)

Waiting for elocos in ET JBP section😌~   41 blog posts
Entry# 2155915            Tags   Past Edits
Updates on ET-JBP electrification as on 6/2/2017.
1. The work of ET-PPI is approximately 99% completed.the bagratawa bridge and tunnel is now fully under wires.i think by this pace of work at the end of this month we can see the elocos on ET-PPI section.
2. The work of electrification is started on NU-PPI section.the pole work is done til kareli and work of pole is going on kareli station.the work of hole is completed till gadarwara and work of digging hole is in progress from GAR-PPI.
1,2
...
more...
& 3pics are of Sontalai station which is completed under wires.
4 pic is of sub-station on bagra tawa station whose work is in progress.
5 & 6 pic is of bagra tawa station which is fully under wires now.
7,8,9,10 & 11 are the pics of Pipariya Station whose work of electrification is fully done.
12 pic is of karakbel station.
13 & 14 pic is of sridham station.
15 is of near bhetaghat station.
16 pic is of narsinghpur station whose only wiring work is left.
By this pace of work i think we can see the elocos on full ET-JBP section at the end of June 2017.

6 posts - Wed Feb 08, 2017

7 posts are hidden.

  
535 views
Feb 08 2017 (17:12)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2155915-8            Tags   Past Edits
very usefull updates of #ETALDELECTRIFICATIONWORK and hopefully by this pace we can hope elocos on ET-JBP stretch by July 2017 after CRS and i hope someone can update JBP-KTE section electrification work details and hopefully that section will also be electrified soon and good pace of work on ET-PPI section and PPI-NU-MML section so hope soon we can hear honking of WAP 4,5,7 etc. locos on this section and time wasting in loco change at ET will be stopped

6 posts are hidden.

  
911 views
Feb 08 2017 (18:34)
12121 मध्य प्रदेश संपर्क क्रांति एक्सप्रेस~   410 blog posts   5 correct pred (100% accurate)
Re# 2155915-15            Tags   Past Edits
Nice updates :)
I think they'll do the CRS of ET-PPI and will use electric traction of passengers and not the SF. By continuously using the electric traction theft can be prevented along with saving some Diesel fuel.
PPI-NU will take some 4-5 months to complete. I guess KTE-JBP will include the JBP station as for electrifying it is concerned. Independent CRS of this route will be earlier than that of PPI-JBP because it is moving at decent pace and it's deadline is June 17.
It's
...
more...
my wild guess that JBP-KTE will get electrified before JBP-PPI.
Few queries-
1. What is the status of NU TSS?
2. Tunnels in PPI-ET section are electrified?

2 posts are hidden.

  
Feb 08 2017 (19:57)
Waiting for elocos in ET JBP section😌~   41 blog posts
Re# 2155915-18            Tags   Past Edits
Yes tunnels are electrified....

  
1277 views
Feb 09 2017 (02:34)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2155915-19            Tags   Past Edits
Now like this jbp-kte section shud also be electrified asap so that many delhi bound trains and kte going trains starting from jbp will get end to end elocos and can be speeded up and due to corruption of cobra co. Jbp-kte section electrification work delaid otherwise it will be operational with elocoa now

  
877 views
Feb 11 2017 (12:23)
rohit04u   33 blog posts
Re# 2155915-20            Tags   Past Edits
Sudden pickup into the pace of work being carried out faster than expected how did this change came into effect bcoz in January 17 there was an update there is pending electrification between the tunnel and most of nu gadarwada but its now almost completed only gadarawada pipariya section is left hope till September October 100% electrification between katni jabalpur itarsi section fully electrified and now the most important point to get considered is the travelling time to get reduced for which purpose is the electrification is going
Great update thanks for updating
  
Info Update
0 Followers
955 views
Jan 18 2017 (12:54)   JBP/Jabalpur Junction (6 PFs)

Waiting for elocos in ET JBP section😌~   41 blog posts
Entry# 2131225            Tags   Past Edits
JBP-BTC gauge conversion new deadline.

  
705 views
Jan 19 2017 (22:52)
HAPPY COLORFULL HOLI FROM JBP ET OHE OMG 😲~   11897 blog posts   22 correct pred (45% accurate)
Re# 2131225-1            Tags   Past Edits
Deadline ka koi fyda nhi h kam slow h hona h 😒😒
  
★  General Travel
0 Followers
2299 views
Jan 14 2017 (10:25)   JBP/Jabalpur Junction (6 PFs)

Waiting for elocos in ET JBP section😌~   41 blog posts
Entry# 2126598            Tags   Past Edits
JBP-INDB new railway line Project.....

2 posts - Sat Jan 14, 2017

  
692 views
Jan 14 2017 (11:54)
Guest: 39f7ba0c   show all posts
Re# 2126598-3            Tags   Past Edits
JBP- INDB railway line ka route kya hoga?

  
656 views
Jan 14 2017 (12:03)
HAPPY COLORFULL HOLI FROM JBP ET OHE OMG 😲~   11897 blog posts   22 correct pred (45% accurate)
Re# 2126598-4            Tags   Past Edits
2 hours k lye 4500 crore 😝😝😝

  
777 views
Jan 14 2017 (15:00)
Kushal~   159 blog posts
Re# 2126598-5            Tags   Past Edits
Such waste of money. Indore jabalpur can also done once khandwa indore gauge conversion is complete. Route will be Jabalpur itarsi khandwa indore

1 posts are hidden.

  
544 views
Jan 15 2017 (00:52)
Waiting for elocos in ET JBP section😌~   41 blog posts
Re# 2126598-7            Tags   Past Edits
Route wil be Gadarwara-bhopal-ujjain-Indore..

  
230 views
Jan 15 2017 (20:19)
Montez~   2721 blog posts   1582 correct pred (61% accurate)
Re# 2126598-8            Tags   Past Edits
Seriously a project of no use. Would have been good in case of a new line between PPI and ODG / MDDP

12 posts are hidden.
  
★  Info Update
0 Followers
712 views
Jan 15 2017 (15:40)   JBP/Jabalpur Junction (6 PFs)

Waiting for elocos in ET JBP section😌~   41 blog posts
Entry# 2128084            Tags   Past Edits
1 compliments
10 greats for this :D
By next month there will be trail of elocos on ET-PPI section.
  
Rail News
0 Followers
3675 views
Other News
Jan 14 2017 (16:00)   2018 से जबलपुर लाइन के ट्रैक पर दौड़ेंगे इलेक्ट्रिक इंजन - Patrika News

ankurgupta0602~   4691 news posts
Entry# 2126978   News Entry# 291233         Tags   Past Edits
इटारसी से जबलपुर के बीच अगले साल जनवरी से यात्री ट्रेनों में इलेक्ट्रिक See more at : click here

6 posts are hidden.

  
1289 views
Jan 15 2017 (00:59)
Waiting for elocos in ET JBP section😌~   41 blog posts
Re# 2126978-7            Tags   Past Edits
What about JBP-ALD eletrification...?

4 posts are hidden.
  
General Travel
0 Followers
400 views
Jan 15 2017 (00:58)  

Waiting for elocos in ET JBP section😌~   41 blog posts
Entry# 2127503            Tags   Past Edits
Any updates on JBP-ALD electrification....?
Page#    25 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Apr 8
Trains with ARP 15 Dep on: Thu Apr 13
Trains with ARP 30 Dep on: Fri Apr 28
Trains with ARP 120 Dep on: Thu Jul 27

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site