Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Mar 30, 2017 10:35:09 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Mar 30, 2017 10:35:09 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by 12121 मध्य प्रदेश संपर्क क्रांति एक्सप्रेस~
Page#    219 Blog Entries  next>>
  
★  General Travel
0 Followers
968 views
Mar 23 2017 (20:29)  

Waiting for elocos in ET JBP section😌~   41 blog posts
Entry# 2208343            Tags   Past Edits
Updates on Katni-Jabalpur electrification.
The work is going on with full pace between jabalpur to sihora.
The hole work is done till jabalpur outer and soon to be reached jabalpur station but after sihora till katni the work is very slow, in some places not even hole work is done.
Pic - Gosalpur station #ETALDELECTRIFICATION #JBPNEWS

  
737 views
Mar 23 2017 (21:04)
12121 मध्य प्रदेश संपर्क क्रांति एक्सप्रेस~   410 blog posts   5 correct pred (100% accurate)
Re# 2208343-1            Tags   Past Edits
Have you captures some more pics? If so, please post.

1 posts are hidden.

  
392 views
Mar 25 2017 (13:37)
Waiting for elocos in ET JBP section😌~   41 blog posts
Re# 2208343-3            Tags   Past Edits
No i didn't captured pics.....

1 posts are hidden.
  
General Travel
0 Followers
625 views
Mar 23 2017 (12:14)  

rohit04u   33 blog posts
Entry# 2207603            Tags   Past Edits
Fantastic news update itarsi pipariya railway electrification crs inspection 22 march 2017 bhai somebody please update on nu pipariya railway electrification also kitna complete hua or kitna left now agar ye or katni jbp bhi complete ho gaya toh phir sab e loco katni pe hi change honge kachhpura jbp pe bhi kaam shuru ho gaya hai from mml i didn't expected this kind of pace of the work feel this katni itarsi would get completed by December 2017 pakka but katni satna ne poora kaam bigaad diya otherwise full itarsi allahabad balle balle ho jati

2 posts are hidden.

  
270 views
Mar 23 2017 (19:18)
12121 मध्य प्रदेश संपर्क क्रांति एक्सप्रेस~   410 blog posts   5 correct pred (100% accurate)
Re# 2207603-3            Tags   Past Edits
Waiting for PPI-JBP to complete soon.

  
#Admin #AtlasMonitor please update Itarsi-Pipariya track as Double Electrified Line.
  
General Travel
0 Followers
875 views
Mar 22 2017 (18:59)   SOY/Sukrimangela (2 PFs)

200 LHB trains in India^~   79752 blog posts   5093 correct pred (78% accurate)
Entry# 2206864            Tags   Past Edits
Today Updates
Inspection of Sukhrimangela and Ghansore section done by Drm Ngp and his team today
.
Inspection of new converted BGLine between Podhanur&Pollachi by Commissioner fr Rly Safety #CRS
.
...
more...

CRS inspection of Electrification between Itarsi &Pipariya

  
804 views
Mar 22 2017 (21:30)
12121 मध्य प्रदेश संपर्क क्रांति एक्सप्रेस~   410 blog posts   5 correct pred (100% accurate)
Re# 2206864-1            Tags   Past Edits
What was the result of CRS of ET-PPI?

  
716 views
Mar 23 2017 (00:45)
200 LHB trains in India^~   79752 blog posts   5093 correct pred (78% accurate)
Re# 2206864-2            Tags   Past Edits
Let the full exam complete first then we get result.
  
★  General Travel
0 Followers
1532 views
Mar 22 2017 (13:27)   PPI/Pipariya (3 PFs) | TKD/WAG-9

OHE over JBP~   1114 blog posts   64 correct pred (72% accurate)
Entry# 2206486            Tags   Past Edits
CORE officers conducted a trial on tuesday by running a e-loco from ET which reached PPI without any hassel. CRS inspection of ET-PPI is to be done today, expected to complete by 15:40 HRS in PPI. Electrification uptill JBP is to be completed by the end of this year.
#ETALDELECTRIFICATION

2 posts are hidden.

  
495 views
Mar 22 2017 (13:55)
12121 मध्य प्रदेश संपर्क क्रांति एक्सप्रेस~   410 blog posts   5 correct pred (100% accurate)
Re# 2206486-3            Tags   Past Edits
Good news.

7 posts are hidden.
  
★★  General Travel
0 Followers
2072 views
Mar 21 2017 (10:14)  

arydolly001   378 blog posts
Entry# 2204937            Tags   Past Edits
Update of the Day
CRS Infection 22 March between ET- PPI New etelectrification Root And
23 march infection SOY - Ghansor New Brodguage Line , Its Wow News :)

16 posts are hidden.

  
1164 views
Mar 21 2017 (21:36)
12121 मध्य प्रदेश संपर्क क्रांति एक्सप्रेस~   410 blog posts   5 correct pred (100% accurate)
Re# 2204937-17            Tags   Past Edits
Bahut achhi khabar h. Bas dono ka CRS successful ho jaye toh badiya h.

  
1118 views
Mar 21 2017 (22:27)
arydolly001   378 blog posts
Re# 2204937-18            Tags   Past Edits
ameen ameen *-*

3 posts are hidden.
  
★★★  Info Update
0 Followers
3034 views
Mar 14 2017 (17:34)   MML/Madan Mahal (3 PFs)

tsrijan~   50 blog posts   3 correct pred (60% accurate)
Entry# 2197559            Tags   Past Edits
#Electrification
Finally, the foundation work for OHE masts has kicked off between MML and JBP. I talked to one of the staffs present at the site and he told me that KEC Intl.(which is doing the work b/w JBP and ET) will carry out the electrification work upto JBP coaching yard. Also, the work b/w MML and KEQ will commence shortly.

6 posts - Tue Mar 14, 2017

7 posts are hidden.

  
523 views
Mar 15 2017 (09:11)
12121 मध्य प्रदेश संपर्क क्रांति एक्सप्रेस~   410 blog posts   5 correct pred (100% accurate)
Re# 2197559-8            Tags   Past Edits
The third pic is line towards jbp or KEQ?

  
544 views
Mar 15 2017 (09:12)
tsrijan~   50 blog posts   3 correct pred (60% accurate)
Re# 2197559-9            Tags   Past Edits
Towards JBP.

20 posts are hidden.

  
319 views
Mar 17 2017 (10:54)
12121 मध्य प्रदेश संपर्क क्रांति एक्सप्रेस~   410 blog posts   5 correct pred (100% accurate)
Re# 2197559-30            Tags   Past Edits
Sad kya h isme? D-loco toh rahenge hi jbp me Gondia line ke liye at least 2020 tak.

1 posts are hidden.

  
816 views
Mar 17 2017 (11:10)
HAPPY COLORFULL HOLI FROM JBP ET OHE OMG 😲~   11901 blog posts   22 correct pred (45% accurate)
Re# 2197559-32            Tags   Past Edits
G line m itna traffic thori hoga k din bhar dloco ki awajahi lgi rhe

2 posts are hidden.

  
733 views
Mar 17 2017 (16:43)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2197559-35            Tags   Past Edits
chalo ab jaake achi khabar aayi ki JBP or uske aas paas bhi electrification ka kaam shuru ho gaya or hope ET-JBP section pehle electrify ho jayga in compare to JBP-KTE or bas ab agle saal ya ye saal end ka intezar hai jab elocos action shuru hoga in sections pe
  
General Travel
0 Followers
1817 views
Mar 14 2017 (20:15)   12854/Amarkantak SF Express (PT) | JBP/Jabalpur Junction (6 PFs)

Montez~   2721 blog posts   1582 correct pred (61% accurate)
Entry# 2197747            Tags   Past Edits
Had a jaunt to KY. Returning back.
Amarkantak arrived on PF 1.
Shockingly ypr ppta was stationary on the mainline since 10 min. Amarkantak gets preference and overtakes. Secr train with numerous halts gets priority in wcr over an ecr train with limited halts.
Incredible experience for me

1 posts are hidden.

  
317 views
Mar 14 2017 (20:22)
12121 मध्य प्रदेश संपर्क क्रांति एक्सप्रेस~   410 blog posts   5 correct pred (100% accurate)
Re# 2197747-2            Tags   Past Edits
WCR gives shocks sometimes :p

  
347 views
Mar 14 2017 (22:12)
Montez~   2721 blog posts   1582 correct pred (61% accurate)
Re# 2197747-3            Tags   Past Edits
Certainly 😂
After the OT ypr ppta trailed Amarkantak all along. Vindhyachal was the second train to get overtaken at MML by both of them.

9 posts are hidden.
  
Imaginary
0 Followers
1395 views
013
Mar 05 2017 (22:15)   IMG23438/♥♥Muzaffarpur-Itarsi express♥♥

Proud atheist~   218 img trains   53 popular
752 green flags   57 red flags   4 green per Train
Entry# 2187325            Tags   Past Edits
Flag please my train via ppta-ara-ssm-chopan-singrauli..provide suggestions too..Thank you !!

13 posts are hidden.

  
319 views
Mar 14 2017 (17:37)
12121 मध्य प्रदेश संपर्क क्रांति एक्सप्रेस~   410 blog posts   5 correct pred (100% accurate)
Re# 2187325-14            Tags   Past Edits
It's max passengers will be bound for SGRL or JBP. For ET, only intermediate passengers will be found. For that, change the ARR time at JBP to a suited one. Make it depart from MFP by 11 AM, PPTA 12.30, SGRL 22.30 ,JBP 5.00, ET 11.00.
All major stations will be at better time.

2 posts are hidden.
  
General Travel
0 Followers
825 views
Feb 27 2017 (09:55)   NIL/Nilambur Road (2 PFs)

Hadi*^   2425 blog posts   50 correct pred (62% accurate)
Entry# 2179663            Tags   Past Edits
Electrification

1 posts are hidden.

  
644 views
Feb 27 2017 (13:39)
12121 मध्य प्रदेश संपर्क क्रांति एक्सप्रेस~   410 blog posts   5 correct pred (100% accurate)
Re# 2179663-2            Tags   Past Edits
Please provide the link of the doc.

  
334 views
Mar 13 2017 (09:53)
Hadi*^   2425 blog posts   50 correct pred (62% accurate)
Re# 2179663-3            Tags   Past Edits

1 posts are hidden.
  
General Travel
0 Followers
1404 views
Mar 12 2017 (00:05)   02198/Jabalpur - Coimbatore SF Special | MMR/Manmad Junction (6 PFs)

RTR180   1033 blog posts   7 correct pred (100% accurate)
Entry# 2194569            Tags   Past Edits
One of the best runs ever by a special train!!!
02198 departed Bhusaval 2:10 hours late and covered BSL-MMR 183km section in 1:57 hours at a mindboggling average of 90+kmph. Loco is ET 3D #11516.
General coaches are empty. Sleeper has around 30% occupancy after MMR. My coach S7 has about 10-15 people. Freshly POHed coaches.

4 posts are hidden.

  
981 views
Mar 12 2017 (19:22)
12121 मध्य प्रदेश संपर्क क्रांति एक्सप्रेस~   410 blog posts   5 correct pred (100% accurate)
Re# 2194569-6            Tags   Past Edits
Aap MMR se kahan tak travel kar rhe ho?

  
893 views
Mar 13 2017 (09:47)
RTR180   1033 blog posts   7 correct pred (100% accurate)
Re# 2194569-7            Tags   Past Edits
MAJN
Page#    219 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Apr 9
Trains with ARP 15 Dep on: Fri Apr 14
Trains with ARP 30 Dep on: Sat Apr 29
Trains with ARP 120 Dep on: Fri Jul 28

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site