One thing they must consider is that Charminar has huge slack, which was even a bit high for a medium distance ICF rake train. With LHB rakes, the train can shave off another 15 to 20mts easily.
WL - BZA slack is huge for 12760. Godavari which is also a medium distance train covers this distance in 3hrs and 18mts with 2 stops, while 12760 takes 3hrs and 50mts with 3 stops. This can be covered within 3hrs and 30mts And 2.35hrs between GDR-MAS can also be brought down by another...
more... 5 to 10mts. That's straight away 25 to 30mts speed up.
12759's slack between TEL - BZA can be brought down by 5mts, its slack between KZJ - SC can be brought down by 5 or 10mts and SC-HYD by another 10mts which will speed up the train by another 20-25mts.
TBM 18.10
MS 18.40/50
BZA 01.55/02.00
SC 07.45/07.50
HYD 08.20
HYD 18.30
SC 18.50/18.55
BZA 00.40/00.45
MS 07.50/08.00
TBM 08.35