Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Jun 29, 2017 04:30:41 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Jun 29, 2017 04:30:41 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Tushar
Page#    3 Blog Entries  
  
0 Followers
582 views
Jul 22 2010 (14:09)  
 

Tushar   3 blog posts
Entry# 59701            Tags   Past Edits
Dear Blog Members,
I have a confusion. After Uttar Banga Vananchal collision this question has arised in my mind. Please reply me the 100% correct details.
Is the work of the Assistant driver of a disel engine to check water level & other such things or also to see the signals and also to assist the Driver when he is running the train?

1 posts are hidden.

  
500 views
Jul 22 2010 (14:27)
Guest: 33bcb825   show all posts
Re# 59701-2            Tags   Past Edits

As far as pay structure matter, it is very necessary to understand the nature of duty of the employee, required qualification for the post, productivity of the post, anomalies arised and injustice [mated due to wrong classification of post] in the fixation of pay scales in last five central pay commission. And as per the future prospect point of view and modernization in working system to be consider at the time of recommendation of pay scale. With this our association representing the entire detailed information about loco running staff of Indian railway, and demanding the justified pay scale on the basis
1]
...
more...
conditions required to work as loco running staff,
2] nature of duty,
3] anomalies in the pay scales which were neither rectify nor corrected by the all previous pay commission,
4] productivity of loco running staff including additional efforts for saving administrative expenditure by energy saving & which is in what way helpful for nation. Considering all this fact you are requested to give us justice by recommending the justified pay scales to loco running staff of Indian railway. In the following representation all the above said four terms references given below for your more clarification.
RUNNING STAFF OF INDIAN RAILWAY MEANS THOSE WHO WORK FOR SAFE & EFFICEST MOVEMENT OF TRAINS. THOSE WHO WORK ON LOCO IS LOCO RUNNING STAFF & TRAFFIC SIDE EMPLOYEE WORKING AS INCHARGE AS GUARD IS TRAFFIC RUNNING STAFF.
LOCO RUNNING STAFF: - Loco running consists of
LOCO PILOT (MAIL/EXPRESS),
LOCO PILOT (PASSANGER),
LOCO PILOT (GOODS)
SHUNTING LOCO PILOT,
ASSISTANT LOCO PILOT,
LOCO PILOT (M/EXP):- Loco Running staffs those who are working on Mail/express trains. [Mail express train consists of passenger carrying train with speed of 110KMPH As well as super fast train like RAJDHANI EXPRESS TRAIN with a speed of 120 to 160 kmph].
LOCO PDLOT (PASSANGER):- Loco Running staffs those are working on passenger Trains and run the train with a speed of lOOKMPH.
LOCO PILOT (GOODS);- Loco Running staffs those who are working on goods train operation with a speed of75KMPH & likely to run with lOOKMPH in the coming days as per railways modernization programmed. These loco pilot goods carrying a load of 5100 tones load with single/multiple locomotive.
SHUNTING LOCO PILOT: - Loco running staffs those are utilized for formation of passenger & goods train and their shunting [attaching & detaching of coaches/ wagons] in yards.
ASSISTANT LOCO PILOT: - These loco running staffs are utilized as an assistant of Loco pilot & who are equally responsible for all type of locomotive & train unusual. His Duty to check locomotive thoroughly & have to follow all lawful orders of loco pilot, have to perform extraordinary work in case of serious unusual with trains.
Loco running staff playing a key role in INDIAN RAILWAY'S safe& punctual running of trains with security and productivity. Status of Loco running staff is same as sniper of Indian Army, most skilled pilots of Indian Air force. Because it is universal truth that no any organization can come up & prove their efficiency if their staff are not highly skilled. And with reference to ANNUAL STASTICAL REPORT OF INDIAN RAILWAY as well as speech of HON. RAILWAY MINISTER'S SPEECH IN LOK SABHA on budget, expressed that Indian Railway has earned freight transport, punctuality of M/Exp trains much more than the target expected during the year 2005-06. The same report in the Iastl5 years. It itself indicates management system of INDIAN RAILWAY is good and efficient for the future competition but more important is that the INDIAN RAILWAY has achieved this because of highly skilled staff in which high leveled contribution of Loco running staff is more. And Hon. Minister has acknowledged it in their budget report.
TO KNOW RUNNING STAFF OF INDIAN RAILWAY, Your honor, following facts to be notice carefully. Hereby you are informed
1) the system of recruitment as a loco men in loco running Staff,
2) eligibility for loco staff,
3) training schedule and nature of training,
4) responsibility and nature of work,
5) duties of loco running staff while the train is on run,
5) conditions & Nature of duty while working on high speed train.
6) Duty hours of loco running men.
1) RECRUTTEMENT: - The system of recruitment as loco running men as a Assistant loco pilot, in Indian Railway is through RAILWAY RECRITMENT BOARD
2) ELIGIBILITY FOR RUNNING STAFF: - Because of vast advanced technological changes, and fast movement of train operation Railway required the group of high leveled Technical graduate staff for train operation. Hence Railway started recruitment of literate staff in 1962 through RRB. And from last 20 years, the Railway demanding technical diploma like Diploma in mechanical/ electrical/ electronics engg. Or ITI Diploma holders for the post of assistant loco pilot and in addition to this candidate must have high leveled medical standard which is no other category required so far. Loco running men must have the highest standard of medical fitness in medical ore 'A' One. (As it meant for Airplane Pilots) this medical standard has to maintain from the period of joining and up to the end of carrier as loco running men. A) Each eye vision must be perfect as that of air pilots, but for distance and near vision. B) Each ear must be clear for hearing. C) X-ray for chest be clear. D) ECG for heart etc functioning normal. E) Blood & Urine tests for sugar—NIL F) Physical fitness of the body must be perfect. G) Ishihara test free from color blind free. H) Blood pressure must be normal. The same medical check up, the running staff must have to pass after every periodical gap of 4 years up to the age of 45 years. From 45 years age to 55 years age, periodical medical examination in the same above manner is conducted once in 2 years. And from 55 years age up to 60 years age PME is conducted once in year. And after every PME certificate the loco running can continue as loco running staff. In fact number of medical unfitness noticed is more in loco Rg. Staff as compared to all other category employee of Indian railway due to their condition duty which is explained in the duties of running staff. In addition to this, the loco running staff working on high speed train must have to pass super-Psycho test at RDSO LUCKNOW. As well as loco 10 running staff may also send for special medical examination and called anytime to the divisional office for Psycho test.
3) TRAINING SHEDULE &NATURE OF TRAINING:- After recruitment as a loco running send to ZONAL TRAINING CENTRE for training. The training schedule is for 12 months on Diesel / Electric locomotive including technical education of locomotive, operation education of locomotive. In addition to this General and Subsidiary rules training given. And after successful completion of training from ZTS trainees sent to posted division for practical training under DIVISIONAL TRAINING CENTRE under loco supervisor. And after successful completion of training, posted as ASSISTANT LOCO PILOT SHUNTING LOCO PILOTS:- It is a promotional post from Assistant loco pilot. For this post asstt loco pilot to ZONAL TRAINING CENTRE for 15 days training in which loco operation and General rules and subsidiary rules are teaches. And after completion of training, trainee must pass the exam at ZTS as well as in Divisional exam. Then Loco Inspector gives practical handling training. Then successful eligible candidates will be given the promotion of SHUNTING LOCO PILOTS. LOCO PILOTS PROMOTIONAL COURSE:- For the loco pilot promotion, promotional course is whether for diesel or electric locomotive, must have to pass following coarse from the ZONAL TRAINING CENTRE which is as under- A) GENERAL AND SUBSIDIARY RULES - period 1 months. B) DIESEL LOCOMOTIVE-period 2 Months. C) ELECTRIC LOCOMOTIVE - period 6 months. At zonal training centre, there will be theory classes on GENERAL AND SUBSIDIARY RULES. This book is BIBLE of Indian railway. It means every servant those who are involved directly or indirectly with train movement, he must know the rules of this book, is related to his work. There are 18 chapters in this book. Chapter 4 is for loco pilots. But other than chapter 4, chapter 1 to 3, and 5 to 18 must also necessarily teaches to loco pilots as he is the first person who first faced & noticed the unusual during the coarse of duty. And who can immediate inform to all concern. Not only this, loco pilots have to take firm and appropriate steps towards the train safety. According to this book, an employee who can take initiative for smooth and safe running of trains, if he have proper knowledge of rules of this book. Recent vast reduction in train accidents, surprise and unbelievable achievement of railway transportation is purely based on loco running staff. Because no industry, no country are safe even they have world's high class technology, if they don't have high skilled employee. During the training, in Diesel locomotive theory classes detailed operational study of different type of diesel locomotive used in Indian railway such as type WDM-2, WDM-4, WDG-2, WDG-4, WDS-6 is given in which thorough technical education is given which is necessary to keep moving the train and loco with safety, security, punctuality & productivity. Similarly for electric locomotive pilots training, loco running staff given thorough training of different types of electric locomotive such as WAG-5, WAG-7, WAG-9(ABB Computerized loco) WAM-4, WAP-1, WAP-4, WAP-5(ABB) & WAP-7. There are also three different types in WAG-5 & WAM-4 LOCOMOTIVE on the basis of types of traction motors, modification in electrical circuit & types of brake system used. In addition to this training of multiple unit of electric locomotive are also given. 11 REFRESHER COURSE;- Every loco running staff are booked for refresher course once in three years in zonal training centre. The period of refr

  
496 views
Jul 22 2010 (14:31)
Guest: 33bcb825   show all posts
Re# 59701-3            Tags   Past Edits
i am not able to copy that article check - mdualp.blogspot.com/2008/10/

  
499 views
Jul 22 2010 (14:36)
Manoj Garhwal~   14320 blog posts   14688 correct pred (63% accurate)
Re# 59701-4            Tags   Past Edits
I heavily doubt that you have typed the whole post on your own.
Dont take it otherwise but instead of posting such huge posts, it is recommended to just put a link.
  
0 Followers
273 views
Jun 02 2010 (01:17)  
 

Tushar   3 blog posts
Entry# 46853            Tags   Past Edits
What is the speed limit of trains in various parts of Assam?
  
0 Followers
489 views
Jun 01 2010 (23:38)  
 

Tushar   3 blog posts
Entry# 46842            Tags   Past Edits
My mother has to travel from NGP to HWH on 23rd June. It is WL 3 going on in Shalimar Express in AC 3 Tier .If I Book a ticket, would it get Confirmed?
मेरी माँ को नागपुर से हावड़ा 23 जून को जाना है। शालीमार एक्‍स. के वाता 3 में प्र.सु. 3 चल रहा है। यही मैं एक टीकट लेता हूँ, तो क्‍या वह पुष्‍ट होगा?

  
326 views
Jun 01 2010 (23:45)
Guest: 84a253de   show all posts
Re# 46842-1            Tags   Past Edits
yes allmost confirmed

  
454 views
Jun 02 2010 (00:35)
tabbu khan   91 blog posts   51 correct pred (60% accurate)
Re# 46842-3            Tags   Past Edits
will confirm
Page#    3 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Jul 9
Trains with ARP 15 Dep on: Fri Jul 14
Trains with ARP 30 Dep on: Sat Jul 29
Trains with ARP 120 Dep on: Fri Oct 27

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.