Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Feb 26, 2017 02:29:10 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Feb 26, 2017 02:29:10 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by ssastronaut
Page#    252 Blog Entries  next>>
  
★  Info Update
0 Followers
1987 views
Feb 13 2017 (17:16)   12715/Sachkhand Express (PT) | AWB/Aurangabad (5 PFs)

ssastronaut   366 blog posts   4 correct pred (44% accurate)
Entry# 2162943            Tags   Past Edits
1 compliments
Nice one!!
12Feb2017, Divya Marathi, Aurangabad Edition
#AurangabadNews
Aurangabad- Chalisgaon new BG line gets boost from the central government.
Central govt. today cleared one of the biggest hurdle in Aurangabad-Dhule NH52 4-lane project and Aurangabad-Chalisgaon new BG line. In a meeting held in the presence of union minister Nitin gadakari with Transport Ministry officials, NHAI officials, and Indian Railway officials, committee agreed
...
more...
to increase the width and length of the Autram Ghat tunnel near Kannad on Aurangabad-Dhule NH. Niting Gadakari also ordered to start the procedure for construction of dual purpose tunnel.
New dimensions of the tunnels are..
1. Length: 8.5 km
2. Width: 7meters.
3. height: 4.5 meters at entry, 9.5 meters inside
4. Two separate tunnels for UP and DOWN lanes which will include road as well as railway line (either line will be double in the tunnel section or provision will be made for second line so that no need to dig another tunnel for doubling work in future)
5. Total width of the combined system: 28 meters.
This line will provide direct connectivity between Aurangabad/Marathwda and Indore/Ujjain, Ajmer/Jaipur, Ahemadabad.

3 posts - Mon Feb 13, 2017

1 posts - Tue Feb 14, 2017

2 posts - Fri Feb 17, 2017

1 posts - Mon Feb 20, 2017

  
530 views
Feb 20 2017 (19:18)
vishal~   645 blog posts
Re# 2162943-8            Tags   Past Edits
New rail line is chalisgaon- aurangabad-paithan-gevrai-beed- osmanabad-tuljapur-solapur as exactly parallel to NH-211

  
501 views
Feb 20 2017 (19:23)
vishal~   645 blog posts
Re# 2162943-9            Tags   Past Edits
This rail line boost marathwada tourism

  
510 views
Feb 20 2017 (19:26)
vishal~   645 blog posts
Re# 2162943-10            Tags   Past Edits
Also some rail line needed for maratathwada that is aurangabad- shani shingnapur- nagar-shirur- pune
Jalna-washim yavatmal
Jalna- khamgaon

  
440 views
Feb 20 2017 (22:23)
ssastronaut   366 blog posts   4 correct pred (44% accurate)
Re# 2162943-11            Tags   Past Edits
Hope it comes as you said :)

  
173 views
Feb 24 2017 (10:48)
Fortyville   86 blog posts
Re# 2162943-12            Tags   Past Edits
Chalisgaon~Dhule line is already there only Aurangabad~Chalisgaon(87KMS) & Dhule~Nardana (35 Kms which comes & sanctioned under Dhule~Indore line) are pending.
All members please demand(all possible media i.e.Facebook,Twitter,whatsapp,e-mails to conern departement)for starting first phase of Dhule-Indore with Dhule-Nardana section. It will connect Central ,Western, Delhi ~Mumbai Dedicated Freight Corridor & South Central Railway by shortest route!
  
General Travel
0 Followers
657 views
Feb 17 2017 (22:47)   17614/Hazur Sahib Nanded - Panvel Express (Via Latur) | NED/Hazur Sahib Nanded (4 PFs)

koolwadi   165 blog posts   12 correct pred (80% accurate)
Entry# 2168688            Tags   Past Edits
Worst Experience at Nanded Railway Station!!
Today, I got a worst experience at Nanded Railway Station. One of my relative is going to Pune, so I went to Station to drop him. He used to catch 17613/14 NED-PNVL Express. Now a days, this train is used to start late, due to platform congestion at Nanded. This train came at 6:30 PM on Platform No 3 and to my surprise hardly 2-3 coaches came on platform and rest rake was out of platform. Old people finds very difficult to board the train due to Railway Negligence. When I asked Railway Guard about this matter, he simply laughs, and said "Wo Bade Kutte Paisa Leke Dhanda Karte Hai, Mere Haath Main Kya Hai!!".
...
more...
After, plenty of efforts, this train gets good slot, now, SCR is purposefully not maintaining this train. Even after extension to Panvel, this train still have 3 sleeper coach. Uploading you some pics of this train for your reference..

  
591 views
Feb 17 2017 (23:28)
ssastronaut   366 blog posts   4 correct pred (44% accurate)
Re# 2168688-1            Tags   Past Edits
This is very bad and annoying news. please post this on twitter as well as in public grievance cell without mention of the guard. We must fight!

1 posts are hidden.
  
★★★  Site Suggestion
0 Followers
2249 views
Feb 17 2017 (01:14)  

Ashu^~   443 blog posts   255 correct pred (72% accurate)
Entry# 2167432            Tags   Past Edits
2 compliments
Presentation looks nice😍 Excellent suggestion!!
#suggestions #moderator I wish IRI could provide information regarding the platform orientation of major Railway station/Junctions like the one I have uploaded. The picture is of the orientation of platforms of Manmad Jn. I would like comments on it by the members.

12 posts are hidden.

  
470 views
Feb 17 2017 (11:39)
ssastronaut   366 blog posts   4 correct pred (44% accurate)
Re# 2167432-13            Tags   Past Edits
PF 4 line is also connected to NED and DD line. Plz correct.

2 posts are hidden.

  
500 views
Feb 17 2017 (11:54)
Ashu^~   443 blog posts   255 correct pred (72% accurate)
Re# 2167432-16            Tags   Past Edits
You are absolutely right sir!!!
But suggestion is for Platform orientation, Not track orientation.

9 posts are hidden.
  
Info Update
0 Followers
457 views
Feb 14 2017 (11:45)   AWB/Aurangabad (5 PFs)

ssastronaut   366 blog posts   4 correct pred (44% accurate)
Entry# 2163900            Tags   Past Edits
14th FEb2017, Sakaal, Aurangabad Edition.
#AurangabadNews
Aurangbad stn. to be redeveloped under the IR's scheme of station redevelopment in 1st phase of 400 stations. Work include..
1. 2nd phase of new Aurangabad stn building with improved facilities under the model station project
2.
...
more...
extension of existing pf's 4-5 upto 570meters with covers
3. A new pit line in station yard (I personally do not believe on SCR, let's see!)
  
General Travel
0 Followers
441 views
Feb 09 2017 (18:11)  

kishor kawate   168 blog posts
Entry# 2157472            Tags   Past Edits
Train No. 18509/18510 Visakhapatnam-H.S.Nanded-Visakhapatnam Express:
Train No. 18509 Visakhapatnam-H.S.Nanded Express will be renumbered as 12753 (new number) with effect from 27th May, 2017.
Train No. 18510 H.S.Nanded-Visakhapatnam Express will be renumbered as 12754 (new number) with effect from 28th May, 2017.

  
221 views
Feb 09 2017 (18:14)
ssastronaut   366 blog posts   4 correct pred (44% accurate)
Re# 2157472-1            Tags   Past Edits
means train will be maintained by SCR from 27th May. Another unnecessary burden on Nanded. Proved that SCR treats NED as servant.

  
231 views
Feb 09 2017 (18:14)
Venkat వెంకట్   2280 blog posts
Re# 2157472-2            Tags   Past Edits
SCR treats NED better than many Divisions of it.

  
314 views
Feb 09 2017 (18:37)
12752   729 blog posts   4 correct pred (80% accurate)
Re# 2157472-3            Tags   Past Edits
only train numbers were given from SCR 127** series ....not the maintenance....maintenance will still be done at VSKP and SBP respectively...

  
256 views
Feb 09 2017 (18:38)
IR no more Safe^~   18895 blog posts   93957 correct pred (75% accurate)
Re# 2157472-4            Tags   Past Edits
ECoR train only. 125XX series will now be shared by ECoR also. ECoR series has finished.

3 posts are hidden.
  
★  General Travel
0 Followers
1269 views
Feb 08 2017 (10:25)   17057/Devagiri Express (PT) | PAU/Purna Junction (4 PFs)

عمران جاوید   3487 blog posts   881 correct pred (62% accurate)
Entry# 2155716            Tags   Past Edits
doubling works between parbani and pau
today morning from17057

  
1026 views
Feb 08 2017 (12:39)
ssastronaut   366 blog posts   4 correct pred (44% accurate)
Re# 2155716-1            Tags   Past Edits
Can you give update about bridge work on Purna river outside PAU stn?

  
985 views
Feb 08 2017 (14:08)
عمران جاوید   3487 blog posts   881 correct pred (62% accurate)
Re# 2155716-2            Tags   Past Edits
no i didnt

  
886 views
Feb 08 2017 (15:14)
Ganesh   222 blog posts
Re# 2155716-3            Tags   Past Edits
Purna bridge is still in it's primary stage,only piles work is going on since last 5 months.Hope it will be speeded up after allocation of ₹ 71 Crores from this budget.

  
819 views
Feb 08 2017 (22:46)
عمران جاوید   3487 blog posts   881 correct pred (62% accurate)
Re# 2155716-4            Tags   Past Edits

1 posts are hidden.
  
General Travel
0 Followers
1168 views
Feb 05 2017 (09:55)   17623/Hazur Sahib Nanded - Bikaner Weekly Express

vishal~   645 blog posts
Entry# 2152104            Tags   Past Edits
17623/Hazur Sahib Nanded - Bikaner Weekly Express extended upto shriganga nagar

2 posts are hidden.

  
494 views
Feb 05 2017 (15:28)
ssastronaut   366 blog posts   4 correct pred (44% accurate)
Re# 2152104-3            Tags   Past Edits
No guarantee that new train will go via Aurangabad...SCR do not care about Aurangabad...bt if goes..good!

  
546 views
Feb 05 2017 (18:35)
vishal~   645 blog posts
Re# 2152104-4            Tags   Past Edits
Sir ye train aurangabad ki demand se chalane vale hai secundarabad ki demand se nahi

  
481 views
Feb 05 2017 (23:20)
ssastronaut   366 blog posts   4 correct pred (44% accurate)
Re# 2152104-5            Tags   Past Edits
You may be true Vishalji, but last time introduced NED-BKN was supposed to run via AWB, because AWB only demanded it. Even this train was added in all India railway time table via AWB only with the note "#Date of introduction to be notified later". But, so bad luck with AWB that politicians of Vidarbha snatched the train to run via AK and AWB lost!!

  
612 views
Feb 06 2017 (09:24)
vishal~   645 blog posts
Re# 2152104-6            Tags   Past Edits
Aurangabad ki hi thi pr politics ki vajah se wo train via akola chali thi. Iski vajah se ye nayi train shuru kRane ja rahe hai

4 posts are hidden.
  
General Travel
0 Followers
1115 views
Jan 29 2017 (16:54)   AWB/Aurangabad (5 PFs)

ssastronaut   366 blog posts   4 correct pred (44% accurate)
Entry# 2144773            Tags   Past Edits
28-01-2017 Sakaal, Lokamat, Divya Marathi ; Aurangabad editions
#AurangabadNews
GM SCR completes the formality of visiting Aurangabad stn. Came for Shirdi Darshan and completed the picnic. Again hollow promises. No assurance on actions. Just admitted that NED is neglected by SCR.
Assured for new NED-CSTM and NED-Pune train. Will develop Nagarsol stn with Escalators and other facilities (As if Aurangabad stn does not
...
more...
exist. No mention of Aurangabad stn development, new trains). Mukundawadi stn development will be completed by March. Indirectly denied for merging of NED division with CR.
PARBHANI-MIRKHEL (15Km) double line will be operational from March2017. Denied to give any assurance due to elections in Maharashtra (?!!) (What GM of SCR has to do with elections in Maharashtra?!! just an another excuse!)
Inaugurated new Holiday Home at Aurangabad Stn for Guards, Loco Pilots and crews.

  
1024 views
Jan 29 2017 (20:22)
koolwadi   165 blog posts   12 correct pred (80% accurate)
Re# 2144773-1            Tags   Past Edits
This is not a new thing to us. As usual new GM has promised new trains of Pune and Mumbai. After few days, they will say CR won't allow us to give slot. If we ask CR officials, then they will point out to Railway Board. Years after years, we have same demands. No GM, DRM, MP's, Railway Minister are able to fulfill our demands till now. God knows, is Division ke acche din kab aayenge?
  
★  General Travel
1 Followers
6073 views
Jan 22 2017 (07:58)   17617/Tapovan Express | AWB/Aurangabad (5 PFs)

🚂अलविदा खंडवा मिटरगेज🙋🙋~   563 blog posts
Entry# 2135504            Tags   Past Edits

  
912 views
Jan 22 2017 (15:18)
ssastronaut   366 blog posts   4 correct pred (44% accurate)
Re# 2135504-1            Tags   Past Edits
This is very important demand..should be heard as soon as possible..!

2 posts are hidden.

  
907 views
Jan 24 2017 (12:03)
ssastronaut   366 blog posts   4 correct pred (44% accurate)
Re# 2135504-4            Tags   Past Edits
Yes SCR is better in terms of infrastructure and facilities...but only in Telangana and AP. SCR is completely neglecting NED division. SCR treat NED division as servant of TL/AP. Trains are run as per the demand and convenience of these two states only. poor connectivity with rest of the country. poor funds allocation. The main and largest source of income for NED division is Aurangabad, which is completed neglected. But SCR behaves as if Aurangabad does not exists. SCR purposefully delaying the work of pit-line at Aurangabad, doubling of tracks etc. in the division. SCR is diseased with Acute Shirdi Obsession Syndrom (ASOS). Even though CR is not good as SCR, still it will be better to merge NED in CR.

20 posts are hidden.

  
394 views
Jan 27 2017 (13:09)
Foamer~   1265 blog posts
Re# 2135504-25            Tags   Past Edits
SCR treats Karnataka part too shabbily. RC, YG are big stations but absolutely nothing in terms of trains for them. Also in AP, the Rayalseema part is neglected too.

8 posts are hidden.
  
General Travel
0 Followers
1360 views
Jan 23 2017 (22:27)   00609/Pune - Aurangabad Special | PUNE/Pune Junction (6 PFs)

Boxer Bhai   38174 blog posts   12668 correct pred (61% accurate)
Entry# 2137749            Tags   Past Edits
00608/00609 snsi pune awb spl
Gs + Sl

1 posts are hidden.

  
1112 views
Jan 24 2017 (17:30)
ssastronaut   366 blog posts   4 correct pred (44% accurate)
Re# 2137749-2            Tags   Past Edits
Whats the use of Pune-AWb Spl...? AWB-PUNE is 240KM by 4-lane road and well connected. It takes just 4-5 hours frm AWB to PUNE... strange!
Page#    252 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Mar 8
Trains with ARP 15 Dep on: Mon Mar 13
Trains with ARP 30 Dep on: Tue Mar 28
Trains with ARP 120 Dep on: Mon Jun 26

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site