Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Thu Jul 24, 2014 23:12:59 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video    Post a Train TipPost a Train Tip **new    Post a Station TipPost a Station Tip **new    Super Search
Topics:    Filters:

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Aug 3, 2014
Trains with ARP 30 Dep on: Sat Aug 23, 2014
Trains with ARP 60 Dep on: Mon Sep 22, 2014

  
  

Rail News

  • China to build railway lines up to India border  News Entry# 186667
    by: rdb**  Today (11:11PM)


    China is planning the construction of two railway lines in Tibet that will extend up to the border with India and are expected to be completed by 2020, State media reported on Thursday.
    The railway lines will run from the town...
  • Negligent driving resulted in accident, says Gowda  News Entry# 186666
    by: rdb**  Today (11:08PM)


    More than 20 students were killed when a train rammed a school bus at an unmanned level crossing in Medak district.
    Railway Minister D V Sadanada Gowda told Lok Sabha on Thursday that the accident took place due to negligent driving...
  • Advance Booking of Reserved Train Tickets  News Entry# 186665
    by: rdb**  Today (11:07PM)


    It is proposed to add another 5000 such machines across all Zonal Railways, out of which 2000 will be coin operated and 3000 smart card operated. The procurement these machines will start from this financial year.
    Smart card based ATVMs...
  • Advance Booking of Reserved Train Tickets  News Entry# 186664
    by: rdb**  Today (11:07PM)


    The advance reservation period for booking reserved accommodation is 60 days excluding the day of journey. In case of certain day time express trains, shorter time limits are prescribed.
    In case of Tatkal tickets, the booking opens at 1000 hours...
  • Modernisation of Railway Network  News Entry# 186663
    by: rdb**  Today (11:06PM)


    Modernisation of services and extension of Railways network is an ongoing process over Indian Railways. There is a constant endeavour of Ministry of Railways for capacity augmentation and upgradation of tracks and rolling stock, improvements in signalling systems, training and monitoring of loco pilots, induction of modern technologies, including provision...

New Trains

Site Announcements

  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
  • Entry# 932140
    Dec 12 2013 (01:34AM)


    Over the last month, several enhancements have been made to the IRI Atlas. Following are the salient points: . 1. Previously, the tracks were crude with many straight line segments. Only on clicking on the individual tracks, it would assume a finer form. Now, the tracks are refined even on the overview...
  • Entry# 914135
    Nov 22 2013 (09:32PM)


    -@all: There's been this recent concern raised by many about the so-called "race blogs", and how they are congesting the Forum. As per our long-standing policy, members are allowed to blog freely, so long as their posts are not offensive or of a repetitive spam nature. . Accordingly, the following changes are being...
  • Entry# 871813
    Oct 09 2013 (06:44AM)


    Some new features have been introduced: #siteannouncement . Blogs: 1. Multiple Train & Station tags can be added to each Blog Entry as well as each Blog Reply within the Blog Entry. The "Tags" link within each Blog Entry/Reply will show the list of Train/Station Tags. . 2. The Forum submenu within the Train &...
Blog Posts by Kumar Piyush
Page#    Showing 1 to 2 of 2 blog entries  
Travel Question
0 Followers
342 views
Mar 13 2014 (3:55PM)           
 

Kumar Piyush   2 blog posts   48 correct pred (65% accurate)  
Entry# 1023169               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
ASAP reply for a route
I am currently @ CTC and I need to move to NDLS...!!
please suggest me a train for 14-03-2014 with reservation ...
via Link trains also accepted ,,!! ctc,hwh to ndls,ambala cantt,panipat,bhiwani..
any train with a posibilty of SL or 3 tier

Mar 13 2014 (4:38PM)        

upcomming   41 blog posts   354 correct pred (73% accurate)  
Re# 1023169-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
22823 book in this train . in 3AC . its in RAC .

148 views
Mar 13 2014 (10:01PM)        

Kumar Piyush   2 blog posts   48 correct pred (65% accurate)  
Re# 1023169-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
ohh Rajdhani!!
Predictions: 21
confirm: 21
rac: 0
wl: 0
Journey: Wed Jun 13, 2012 @ 16:00
12819/Orissa Sampark Kranti Express
Entry# 427350
 
   Posted by: Kumar Piyush   2 blog posts   48 correct pred (65% accurate)
PNR: 650-xxxxxxx (E-Ticket)   |   AC 3-tier - 3A   |   Tot Seats: Avbl >114   |   Charting: < 12:40   |   Similar PNRs
CTC/Cuttack Junction   to   NDLS/New Delhi   |   1769 km / 1796 km
Original Status as of: May 16 2012 (11:46PM)
Passenger 1: Waitlist# 7 (Booking Status: W/L 11,GNWL)
Passenger 2: Waitlist# 8 (Booking Status: W/L 12,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.
I plan to log this trip thru my SmartPhone. All members are invited to follow me and enjoy this trip with me. Thanks.

Latest Status as of: Jun 13 2012 (3:35PM)
Passenger 1: B1,61/Coach Position:5 (Booking Status: W/L 11,GNWL)
Passenger 2: B1,62/Coach Position:5 (Booking Status: W/L 12,GNWL)
Chart PREPARED

811 views
May 17 2012 (12:51AM)        

Guest: 84a81c27   show all posts
Re# 427350-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
SSSSSSSSSS
Page#    2 blog entries  

Scroll to Top
Scroll to Bottom