Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Feb 23, 2017 06:15:06 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Feb 23, 2017 06:15:06 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by rakeshanand99
Page#    1 Blog Entries  
  
Rail Fanning
1 Followers
855 views
Jul 23 2012 (01:24)  
 

rakeshanand99   1 blog posts
Entry# 486861            Tags   Past Edits
New Route for SC-NDLS Rajdhani
The existing train is a weekly train and has poor patronage due to the existing SBC-NDLS Rajdhani (Daily) with better time table. Now a duronto has also been started with the same travel time but has non-ac Sl coaches as well and is bi-weekly.
After the gauge completion of Akola-Indore section, this rajdhani can be re-routed as follows:-
SC
...
more...
- Nizamabad - Nanded - Akola - Indore - Ujjain - Kota - NDLS.
The route length will be about 1650-1700 km and at an avg speed of 70 kmph it will take 24 hrs .
Present rajdhani takes 21.5 hrs.
This will provide a rajdhani for the interior regions- telangana , marathawada and malwa. Patronage will be good as there will be travellers from nanded, akola and indore. Also there is no rajdhani from indore to delhi. It could be run as a tri- weekly.

  
448 views
Jul 23 2012 (19:25)
Shubham Jain*^~   947 blog posts   1601 correct pred (78% accurate)
Re# 486861-1            Tags   Past Edits
Ise kehte hai pehle post mai hi kuch tooofani karna...
Agreed. Excellent suggestion...

  
375 views
Jul 23 2012 (19:28)
Koush12461^~   78715 blog posts   5089 correct pred (78% accurate)
Re# 486861-2            Tags   Past Edits
but it is longer route , present route is perfect

  
420 views
Jul 23 2012 (19:30)
Lakshay   2372 blog posts   22111 correct pred (77% accurate)
Re# 486861-3            Tags   Past Edits
Excellent Route, will have gr8 demand..!!

  
413 views
Jul 23 2012 (19:33)
Aravind Kuttikrishnan*^   2243 blog posts   3425 correct pred (67% accurate)
Re# 486861-4            Tags   Past Edits
Great news. But the SC-NDLS travellers will be left disappointed as this will take 2.5hrs more.

6 posts are hidden.
Page#    1 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Mar 5
Trains with ARP 15 Dep on: Fri Mar 10
Trains with ARP 30 Dep on: Sat Mar 25
Trains with ARP 120 Dep on: Fri Jun 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site