Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Feb 20, 2017 16:36:55 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Feb 20, 2017 16:36:55 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Muzzammil Cool
Page#    40 Blog Entries  next>>
  
General Travel
0 Followers
1174 views
Feb 10 2017 (14:56)   BAY/Ballari Junction (Bellary) (4 PFs)

Muzzammil Cool   44 blog posts   29 correct pred (82% accurate)
Entry# 2158857            Tags   Past Edits
#admin Plz update BAY Track As Construction- Electrification of double diesel Line under station info work already started btw GTL-HPT

5 posts - Sat Feb 11, 2017

1 posts - Mon Feb 13, 2017

  
376 views
Feb 18 2017 (11:44)
Muzzammil Cool   44 blog posts   29 correct pred (82% accurate)
Re# 2158857-8            Tags   Past Edits
#admin #moderator anyone listening? Plz update the track info on the station info page for BAY to conc-electrification of double line

  
310 views
Feb 18 2017 (11:53)
IR no more Safe^~   18732 blog posts   93829 correct pred (74% accurate)
Re# 2158857-9            Tags   Past Edits
Unless all tracks are electrified it can't be updated. One section is still DIESEL so. Its correct.

  
241 views
Feb 18 2017 (22:33)
Muzzammil Cool   44 blog posts   29 correct pred (82% accurate)
Re# 2158857-10            Tags   Past Edits
Sir GTL-HPT SECTION is double diesel line not single diesel line. And construction work is under way for its electrification as its updated in the atlas too... so requesting you to change the track to Construction- Electrification of double diesel line. As shown in the pic its single diesel line on station info tab

  
175 views
Feb 18 2017 (23:26)
IR no more Safe^~   18732 blog posts   93829 correct pred (74% accurate)
Re# 2158857-11            Tags   Past Edits
I will try to correct.

  
112 views
Yesterday (10:21)
Muzzammil Cool   44 blog posts   29 correct pred (82% accurate)
Re# 2158857-12            Tags   Past Edits
Thanq sir... hope u correct whole of GTL- HPT section as double diesel line
  
General Travel
0 Followers
2362 views
Jan 19 2017 (14:01)   DMM/Dharmavaram Junction (5 PFs)

Muzzammil Cool   44 blog posts   29 correct pred (82% accurate)
Entry# 2132386            Tags   Past Edits
What is the status of doubling btw YNK-DMM-GY/GTL??

  
2129 views
Jan 19 2017 (14:03)
Koilakuntla in IR~   7772 blog posts   7 correct pred (63% accurate)
Re# 2132386-1            Tags   Past Edits
will take another 5 years to complete fully

  
1709 views
Jan 23 2017 (10:29)
kcsandeep421   17 blog posts
Re# 2132386-2            Tags   Past Edits
land leveling and construction of minor bridges almost complete between ynk and hindupur except 2 to 3 major briges as on 1/1/2017

  
1277 views
Jan 31 2017 (12:14)
Muzzammil Cool   44 blog posts   29 correct pred (82% accurate)
Re# 2132386-3            Tags   Past Edits
any news of doubling status btw DMM & GTL/GY?

  
870 views
Feb 07 2017 (07:53)
Vishnu Datta Jacke~   113 blog posts
Re# 2132386-4            Tags   Past Edits
Not starter at all , presntly GTL-Kallur jn on process , dur tht line is more importnace given as a Trunk route CSTM-SBC line !! ,

  
409 views
Feb 13 2017 (13:33)
vijaysrini27   4 blog posts
Re# 2132386-5            Tags   Past Edits
There has been some positive response in between Yelahanka and Doddaballapur. The land is ready. However, tracks are yet to be laid.
This stretch is likely to take around 2 years, I suppose.
  
Rail News
0 Followers
531 views
New/Special TrainsNWR/North Western  -  
Feb 13 2017 (09:30)   Belagavi gets one Humsafar train Tiruchirapalli to Sriganganagar

Muzzammil Cool   9 news posts
Entry# 2162429   News Entry# 293763         Tags   Past Edits
Indian Railways is all set to introduce three more Humsafar trains for Karnataka shortly. These are GPS based, AC 3-tiered trains with special facilities for disabled.
Out of these three one will be Tiruchirapalli to Sriganganagar (Rajasthan) via Belagavi.
humsafar train belagavi bgmThe trains will have an LED display board and coaches will have sensors to detect smoke and fire. The coaches are disabled-friendly with Braille display. Bio-toilets, vending machines that can give tea, coffee and soup and newly designed dustbins are other features of the Humsafar train.
Tentative
...
more...
train number 14715/Sri Ganganagar – Tiruchchirappalli HumSafar Express is likely to arrive at 17:08 on Wednesday and proceed to Tiruchchirappalli.
14716/Tiruchchirapalli – Sriganganagar HumSafar Express is likely to arrive at 22:10 on Friday and proceed to Sriganganagar.
Date of introduction will be notified later.

  
1826 views
Feb 13 2017 (09:53)
Boxer Bhai~   38136 blog posts   12664 correct pred (61% accurate)
Re# 2162429-1            Tags   Past Edits
Sgnr tpj,adi mas,bdt pnbe hs ???

2 posts are hidden.

  
1726 views
Feb 13 2017 (10:46)
No one is beyond huminity nither region nor religi~   4976 blog posts   92 correct pred (63% accurate)
Re# 2162429-4            Tags   Past Edits
Pnbe wali kab se???

5 posts are hidden.
  
Info Update
0 Followers
592 views
Feb 07 2017 (13:22)   BAY/Ballari Junction (Bellary) (4 PFs)

Ballari Express~   1234 blog posts   6 correct pred (50% accurate)
Entry# 2154577            Tags   Past Edits
#pls update BAY-JRU section is Track: Construction - Single-Line Electrification
link :- click here

1 posts are hidden.

  
447 views
Feb 07 2017 (20:48)
Muzzammil Cool   44 blog posts   29 correct pred (82% accurate)
Re# 2154577-2            Tags   Past Edits
#admin Plz update BAY Track As Construction- Electrification of double diesel Line under station info
  
General Travel
0 Followers
439 views
Feb 02 2017 (23:08)   BAY/Ballari Junction (Bellary) (4 PFs)

Muzzammil Cool   44 blog posts   29 correct pred (82% accurate)
Entry# 2149525            Tags   Past Edits
#admin Plz update BAY Track As Construction- Electrification of double diesel Line under station info
  
General Travel
0 Followers
485 views
Jan 31 2017 (12:34)   BAY/Ballari Junction (Bellary) (4 PFs)

Muzzammil Cool   44 blog posts   29 correct pred (82% accurate)
Entry# 2146655            Tags   Past Edits
#admin Plz update BAY Track As Construction- Electrification of double diesel Line under station info
  
Rail News
0 Followers
2393 views
Rail BudgetSWR/South Western  -  
Jan 27 2017 (09:11)   Bangalore Railway Division comes out with a wishlist for Centre

karbang   44 news posts
Entry# 2141873   News Entry# 292362         Tags   Past Edits
BENGALURU: With less than a week to go for the first Railway budget in 92 years to be merged with the General Budget, the Bangalore Railway Division has sent across its wishlist to the Centre for inclusion in the Pink Book (the official register of the Indian Railways).
Chief among the demands are a train connecting Hubballi with Mysuru via Bengaluru, three doubling projects and increased allocation for passenger amenities.
Speaking to Express on the doubling projects, Ashok Gupta, Chief Administrative Officer, Constructions, South Western Railway, said, “The doubling of the
...
more...
existing line between Yeshwantpur and Baiyappanahalli via Hebbal will help us run more trains along this busy stretch. The 22-km line will require funding of Rs 170 crore.”
Another doubling line between Baiyappanahalli and Hosur that will cost Rs 375 crore has also been requested.
“This will be a 48-km line and will immensely help passengers commuting between the two cities regularly,” Gupta added. A 41-km second line between Penukonda and Dharmavaram via Nagasundaram that will cost Rs 294 crore has also been sought, he said.
Sanjiv Agarwal, Divisional Railway Manager, Bengaluru Railway Division, said, “To decongest the packed Chamundi Express that leaves from Krantiveera Sangolli Rayanna (KSR) station in the evenings, we have requested a day train that would connect Hubballi to Mysuru via Bengaluru. It is expected to be sanctioned.”
When asked if any more new trains were sought, the DRM said, “It is not possible to run more trains as we have already reached a saturation point. Hence, we have not requested for more.”
The Division has also sought funding to upgrade Platform 5 and 6 of the Banaswadi station and carry on yard-related work. “The platforms are very small and this is posing a problem to trains coming from Kolar. We need Rs 11 crore for it but even if Rs 3 toRs 4 crore is released, we can begin work on it,” he said.
Agarwal also said that Bengaluru was hoping to get more funding to improve passenger amenities across its Division. “We received very less for it in the previous budget and could not carry out many improvements,” he added.
The South Western Railway Zone (Bengaluru, Hubballi and Mysuru Railway Divisions) as a whole received only Rs 33 crore for passenger amenities in the 2016-17 Railway Budget whereas, it had received nearly Rs 90 crore in the 2015-16 budget, pointed out a top railway official. “We are hoping for Rs 100 crore for the SWR Zone for passenger amenities alone so that Bengaluru gets at least Rs 30 to Rs 40 crore allocated out of it,” he said.
Asked about what tops the amenity, the official said KSR, Cantonment, Yeshwantpur and Krishnajapuram stations require digital passenger information boards.

8 posts are hidden.

  
831 views
Jan 27 2017 (18:07)
Muzzammil Cool   44 blog posts   29 correct pred (82% accurate)
Re# 2141873-9            Tags   Past Edits
Tat was due to mainly odd timings and less speed the train turned out to be a white elephant! It should hav reached chennai early morning n left chennai late evening.

8 posts are hidden.
  
Rail News
0 Followers
281 views
Commentary/Human InterestSWR/South Western  -  
Jan 11 2017 (08:47)   MP seeks Rs. 65 crore for Mysuru Railway Division

rdb*^   125930 news posts
Entry# 2123553   News Entry# 290968         Tags   Past Edits
A review meeting to take stock of the requirements of the Mysuru Railway Division held on Tuesday underlined the need for Rs. 65 crore to establish new facilities and to develop a second railway terminal in the city to cope with the increase in rail traffic.
The meeting was held at the South Western Railway headquarters at Hubballi. Mysuru MP Pratap Simha apprised officials of the long-pending demands of passengers and the general public of the South Karnataka region. He said a new railway station is imperative as the existing station has reached its carrying capacity. The proposal has received administrative nod but its progress will hinge on timely release of funds.
The
...
more...
MP directed officials to expedite the implementation of the Multi-Model Logistic Park at Kadakola being taken up by the Container Corporation of India, which is expected to cost around Rs. 100 crore. He stressed the need for early completion of the new railway line between Mysuru and Kushalnagar and sought adequate provisions for it in this year’s General Budget. According to a release, early completion of the Logistic Park will give a boost to local industrial development.
Mr. Simha added that besides apprising officials of the requirements of the Mysuru division, there were general discussions pertaining to the ongoing works. Officials were urged to complete the electrification of the Mysuru-Bengaluru section, which is in progress as this is important to introduce additional trains and reduce the commuting time.
He also directed railway officials to introduce lifts and escalators at platforms 2, 3, 4 and 5 at the Mysuru station, as has already been done on platforms 1 and 6.
Early introduction of a new service between Mysuru and Hubballi via Bengaluru, which too has received administrative approval, completion of a road under-bridge at high-density traffic areas across the division, introduction of PoS swiping machines to facilitate cashless transaction at all stations, adoption of bio-toilets, etc. were the other issues discussed at the meeting.

  
836 views
Jan 11 2017 (15:26)
Muzzammil Cool   44 blog posts   29 correct pred (82% accurate)
Re# 2123553-1            Tags   Past Edits
The meeting was also attended by MP's of belagavi, bagalkot, ballari, haveri... what is the news wrt these regions from this meeting?
  
Rail News
0 Followers
957 views
IR AffairsSWR/South Western  -  
Dec 28 2016 (13:51)   NEW TRAIN FROM BELLARY TO KALYANADURG VIA RAYADURG FROM 30/12/2016

RAVI from RDG   3 news posts
Entry# 2108186   News Entry# 289840         Tags   Past Edits
NEW TRAIN WILL START FROM 30/12/2016, FROM BELLARY(BAY) TO KALYANADURG(KYND) VIA rAYADURG(RDG). At 10AM.

  
1578 views
Dec 28 2016 (15:00)
Muzzammil Cool   44 blog posts   29 correct pred (82% accurate)
Re# 2108186-1            Tags   Past Edits
Wen ll the details come out n what is the source for this news?

  
1560 views
Dec 28 2016 (15:05)
Ballari Express~   1234 blog posts   6 correct pred (50% accurate)
Re# 2108186-2            Tags   Past Edits
today new paper Eendau Telugu ATP edition link click here

1 posts are hidden.

  
1085 views
Dec 28 2016 (18:56)
RAVI from RDG   32 blog posts   42 correct pred (69% accurate)
Re# 2108186-4            Tags   Past Edits
Today Andhra Jyothi paper (28/12/2016)and yesterday (27/12/2016)Eenadu papers (district edition Rayadurg constituency section)

3 posts are hidden.
  
General Travel
0 Followers
4900 views
Sep 11 2016 (21:21)   16592/Hampi Express
 

BMTIR*^~   21261 blog posts   7421 correct pred (63% accurate)
Entry# 1988550            Tags   Past Edits
Please note the following timings from 14.09.2016
16592 Hampi
SBC 21:55 22:05-Most Likely PF-8 after the Weekly trains to Rajasthan depart
MWM 22:13 22:14
YPR 22:20 22:23
16591
...
more...
Hampi
YPR 05:40 05:45-
MWM 05:55 05:56
SBC 06:10 06:30-Most likely PF-8 after Jan shatabdi departure

2 posts are hidden.

  
3862 views
Sep 24 2016 (15:14)
Muzzammil Cool   44 blog posts   29 correct pred (82% accurate)
Re# 1988550-3            Tags   Past Edits
this YPR route is definitely shorter, bt is isnt proving to be faster at all. Literally the train crawls from SBC to YNK. Its taking more than an 1hr to cover 18Kms! Should be redirected through BNC both for punctuality and benefit of the PAX.
Coach composition for 16592 train isnt correct here #admin plz update it as per 16591... its correct for tat train here. A1 is between HA1 & B3.

1 posts are hidden.
Page#    40 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 2
Trains with ARP 15 Dep on: Tue Mar 7
Trains with ARP 30 Dep on: Wed Mar 22
Trains with ARP 120 Dep on: Tue Jun 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site