Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Apr 30, 2017 15:01:17 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Apr 30, 2017 15:01:17 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by CNB
Page#    424 Blog Entries  next>>
  
Predictions: 22
confirm: 20
rac: 0
wl: 2
Journey: Sat Jan 23, 2016 @ 23:45
Class: Sleeper - SL   |   Tot Seats: Avbl 362   |   Charting: < 20:00
Travel: CNB/Kanpur Central   to   NDLS/New Delhi   |   440 km / 440 km
12451/Shram Shakti Express (PT)
Entry# 1719372

Posted by: CNB   542 blog posts   4127 correct pred (73% accurate)
PNR: 241-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Jan 23 2016 (18:49)
Passenger 1: Waitlist# 22 (Booking Status: W/L 51,CK)
Passenger 2: Waitlist# 23 (Booking Status: W/L 52,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jan 23 2016 (20:11)
Passenger 1: S9,11 [UB]/Coach Position:19 (Booking Status: W/L 51,CK)
Passenger 2: S9,13 [MB]/Coach Position:19 (Booking Status: W/L 52,CK)
Chart PREPARED

Full PNR Status History (3 statuses)
Status as of: Jan 23 2016 (20:11)
Passenger 1: S9,11 [UB]/Coach Position:19 (Booking Status: W/L 51,CK)
Passenger 2: S9,13 [MB]/Coach Position:19 (Booking Status: W/L 52,CK)
Chart PREPARED

Status as of: Jan 23 2016 (19:06)
Passenger 1: Waitlist# 20 (Booking Status: W/L 51,CK)
Passenger 2: Waitlist# 21 (Booking Status: W/L 52,CK)
Chart NOT Prepared

Status as of: Jan 23 2016 (18:49)
Passenger 1: Waitlist# 22 (Booking Status: W/L 51,CK)
Passenger 2: Waitlist# 23 (Booking Status: W/L 52,CK)
Chart NOT Prepared


  
1988 views
Jan 23 2016 (18:59)
穆罕默德·德恩   926 blog posts   73263 correct pred (87% accurate)
Re# 1719372-1            Tags   Past Edits
pt 61 avl
  
Info Update
0 Followers
1113 views
Jun 28 2015 (13:34)  
 

CNB   542 blog posts   4127 correct pred (73% accurate)
Entry# 1526801            Tags   Past Edits
The Indian Railway Catering and Tourism Corporation will install five high-capacity servers, imported from Singapore, to speed up its e-ticketing operations.
The initiative to import five new servers from Singapore comes close on the heels of introduction of two new high-speed servers by IRCTC to Passenger Reservation System (PRS) earlier this month, which have doubled the peak-time efficiency for booking tatkal tickets at the railways’ ticketing website.
With five more servers, the number of concurrent users is expected to go up from the existing 180,000 to 300,000 while the existing capacity to book
...
more...
around 15,000 tickets per minute will go up considerably.
“Five new HP Itanium servers, to be installed shortly in the Passenger Reservation System (PRS), would considerably speed up the booking of e-tickets and streamline the Next Generation E-Ticketing System (NGET),” IRCTC Chairman and Managing Director AK Manocha today said.
“There are already five servers in the PRS and with the addition of five new servers from Singapore, their number would go up to ten,” he said.
The operationalisation of five new high-speed servers is expected to substantially enhance the website’s performance.
Also, the entire procedure of e-ticketing will get a face-lift with improvement in efficiency of the website, log-in time and payment gateway.
IRCTC is also planning to increase its network bandwidth from the existing 1.4 GB to 1.7 GB in order to enhance the performance of e-ticketing operations.
  
Predictions: 0
confirm: 0
rac: 0
wl: 0
Journey: Tue Jun 02, 2015 @ 06:00
Class: Sleeper - SL   |   Tot Seats: Avbl 178   |   Charting: < 19:30
Travel: CNB/Kanpur Central   to   GKP/Gorakhpur Junction   |   349 km / 881 km
15108/Mathura - Chhapra Express (PT)
Entry# 1493313

Posted by: CNB   542 blog posts   4127 correct pred (73% accurate)
PNR: 230-xxxxxxx    |   Similar PNRs
Posted Status as of: May 31 2015 (10:12)
Passenger 1: Confirmed (Booking Status: SE1,3,CK)
Passenger 2: Confirmed (Booking Status: SE1,5,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 05 2015 (10:37)
Passenger 1: SE1,3 [UB] (Booking Status: SE1,3,CK)
Passenger 2: SE1,5 [MB] (Booking Status: SE1,5,CK)
Chart PREPARED

  
2330 views
Jun 01 2015 (20:43)
Adil   876 blog posts   15892 correct pred (86% accurate)
Re# 1493313-1            Tags   Past Edits
  
Predictions: 68
confirm: 53
rac: 15
wl: 0
Journey: Mon May 25, 2015 @ 11:10
Class: Sleeper - SL   |   Tot Seats: Avbl 309   |   Charting: < 07:15
Travel: LTT/Lokmanya Tilak Terminus   to   GKP/Gorakhpur Junction   |   1684 km / 1684 km
12542/Mumbai LTT - Gorakhpur Sant Kabir Dham SF Express (PT)
Entry# 1407679

Posted by: CNB   542 blog posts   4127 correct pred (73% accurate)
PNR: 823-xxxxxxx    |   Similar PNRs
Posted Status as of: Mar 26 2015 (08:06)
Passenger 1: RAC 27 (Booking Status: RAC 27,GNWL)
Passenger 2: RAC 28 (Booking Status: RAC 28,GNWL)
Passenger 3: RAC 29 (Booking Status: RAC 29,GNWL)
Passenger 4: RAC 30 (Booking Status: RAC 30,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 25 2015 (08:10)
Passenger 1: S7,32 [SU]/Coach Position:11 (Booking Status: RAC 27,GNWL)
Passenger 2: RS8 31/Coach Position:12 (Booking Status: RAC 28,GNWL)
Passenger 3: RS8 31/Coach Position:12 (Booking Status: RAC 29,GNWL)
Passenger 4: RS8 39/Coach Position:12 (Booking Status: RAC 30,GNWL)
Chart PREPARED

  
2643 views
May 25 2015 (01:19)
KMonIRI*^~   3761 blog posts   63519 correct pred (74% accurate)
Re# 1407679-1            Tags   Past Edits
Only 14 cancel

1 posts are hidden.
  
Predictions: 53
confirm: 53
rac: 0
wl: 0
Journey: Wed May 20, 2015 @ 11:10
Class: Sleeper - SL   |   Tot Seats: Avbl 301   |   Charting: < 07:15
Travel: LTT/Lokmanya Tilak Terminus   to   BST/Basti   |   1621 km / 1684 km
12542/Mumbai LTT - Gorakhpur Sant Kabir Dham SF Express (PT)
Entry# 1402765

Posted by: CNB   542 blog posts   4127 correct pred (73% accurate)
PNR: 845-xxxxxxx    |   Similar PNRs
Posted Status as of: Mar 21 2015 (08:01)
Passenger 1: Confirmed (Booking Status: S2,62,PQ)
Passenger 2: Confirmed (Booking Status: S2,64,PQ)
Passenger 3: RAC 1 (Booking Status: RAC 1,GNWL)
Passenger 4: RAC 2 (Booking Status: RAC 2,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 20 2015 (14:09)
Passenger 1: S2,62 [UB]/Coach Position:4 (Booking Status: S2,62,PQ)
Passenger 2: S2,64 [SU]/Coach Position:4 (Booking Status: S2,64,PQ)
Passenger 3: S7,70 [UB]/Coach Position:9 (Booking Status: RAC 1,GNWL)
Passenger 4: S7,72 [SU]/Coach Position:9 (Booking Status: RAC 2,GNWL)
Chart PREPARED

  
2314 views
May 06 2015 (17:20)
S VeRmA*^~   6190 blog posts   123921 correct pred (90% accurate)
Re# 1402765-1            Tags   Past Edits
Latest Status as of: Today (8:36AM)  Refresh Status
Passenger 1: Confirmed (Booking Status: S2,62,PQ)
Passenger 2: Confirmed (Booking Status: S2,64,PQ)
Passenger 3: Confirmed (Booking Status: RAC 1,GNWL)
Passenger 4: Confirmed (Booking Status: RAC 2,GNWL)
Chart
...
more...
NOT Prepared
  
Predictions: 70
confirm: 70
rac: 0
wl: 0
Journey: Thu May 07, 2015 @ 06:08
Class: Sleeper - SL   |   Tot Seats: Avbl 454
Travel: KYN/Kalyan Junction   to   BSB/Varanasi Junction   |   1443 km / 1477 km
12165/Mumbai LTT - Varanasi (Ratnagiri) SF Express (PT)
Entry# 1389612

Posted by: CNB   542 blog posts   4127 correct pred (73% accurate)
PNR: 845-xxxxxxx    |   Similar PNRs
Posted Status as of: Mar 08 2015 (08:03)
Passenger 1: RAC 17 (Booking Status: RAC 17,GNWL)
Passenger 2: RAC 18 (Booking Status: RAC 18,GNWL)
Passenger 3: RAC 19 (Booking Status: RAC 19,GNWL)
Passenger 4: RAC 20 (Booking Status: RAC 20,GNWL)
Passenger 5: RAC 21 (Booking Status: RAC 21,GNWL)
Passenger 6: RAC 22 (Booking Status: RAC 22,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 06 2015 (22:43)
Passenger 1: S11,69 [MB] (Booking Status: RAC 17,GNWL)
Passenger 2: S11,70 [UB] (Booking Status: RAC 18,GNWL)
Passenger 3: S12,68 [LB] (Booking Status: RAC 19,GNWL)
Passenger 4: S12,26 [MB] (Booking Status: RAC 20,GNWL)
Passenger 5: S2,61 [MB] (Booking Status: RAC 21,GNWL)
Passenger 6: S2,62 [UB] (Booking Status: RAC 22,GNWL)
Chart PREPARED

  
3293 views
Mar 09 2015 (23:25)
Ateek   1131 blog posts   4397 correct pred (71% accurate)
Re# 1389612-1            Tags   Past Edits
6 cancellations. A ray of hope is seen here

1 posts are hidden.

  
2864 views
May 05 2015 (19:52)
Ateek   1131 blog posts   4397 correct pred (71% accurate)
Re# 1389612-3            Tags   Past Edits
On doors of confirmation
Latest Status as of: Today (7:51PM) Refresh Status Status Refreshed.
Passenger 1: Confirmed (Booking Status: RAC 17,GNWL)
Passenger 2: Confirmed (Booking Status: RAC 18,GNWL)
Passenger 3: RAC 1 (Booking Status: RAC
...
more...
19,GNWL)
Passenger 4: RAC 2 (Booking Status: RAC 20,GNWL)
Passenger 5: RAC 3 (Booking Status: RAC 21,GNWL)
Passenger 6: RAC 4 (Booking Status: RAC 22,GNWL)
  
Predictions: 54
confirm: 38
rac: 0
wl: 16
Journey: Sat Apr 18, 2015 @ 12:15
Class: Sleeper - SL   |   Tot Seats: Avbl 100   |   Charting: < 08:15
Travel: LTT/Lokmanya Tilak Terminus   to   ALD/Allahabad Junction   |   1343 km / 1875 km
11061/Pawan Express (PT)
Entry# 1371643

Posted by: CNB   542 blog posts   4127 correct pred (73% accurate)
PNR: 813-xxxxxxx    |   Similar PNRs
Posted Status as of: Feb 17 2015 (08:10)
Passenger 1: Waitlist# 1 (Booking Status: W/L 1,PQWL)
Passenger 2: Waitlist# 2 (Booking Status: W/L 2,PQWL)
Passenger 3: Waitlist# 3 (Booking Status: W/L 3,PQWL)
Passenger 4: Waitlist# 4 (Booking Status: W/L 4,PQWL)
Passenger 5: Waitlist# 5 (Booking Status: W/L 5,PQWL)
Passenger 6: Waitlist# 6 (Booking Status: W/L 6,PQWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 18 2015 (11:22)
Passenger 1: Can/Mod (Booking Status: W/L 1,PQWL)
Passenger 2: Can/Mod (Booking Status: W/L 2,PQWL)
Passenger 3: Can/Mod (Booking Status: W/L 3,PQWL)
Passenger 4: Can/Mod (Booking Status: W/L 4,PQWL)
Passenger 5: Can/Mod (Booking Status: W/L 5,PQWL)
Passenger 6: Can/Mod (Booking Status: W/L 6,PQWL)
Chart PREPARED

1 posts - Tue Feb 17, 2015

2 posts are hidden.

  
1916 views
Feb 19 2015 (22:32)
Ateek   1131 blog posts   4397 correct pred (71% accurate)
Re# 1371643-7            Tags   Past Edits
2 days gone, not a single movement ??

  
1910 views
Feb 20 2015 (00:21)
CNB   542 blog posts   4127 correct pred (73% accurate)
Re# 1371643-8            Tags   Past Edits
according to me it will down in last journey week

  
3202 views
Feb 20 2015 (00:48)
DURGASAI   238 blog posts   1201 correct pred (63% accurate)
Re# 1371643-9            Tags   Past Edits
I think this is all tickets are confirmed

  
2820 views
Apr 16 2015 (12:22)
Ateek   1131 blog posts   4397 correct pred (71% accurate)
Re# 1371643-10            Tags   Past Edits
will remain in WL only. 58 days passed and not a sinle movement. And now no expectation of cancellation of cnf tkts as 48hrs limit is reached.

  
2824 views
Apr 16 2015 (12:26)
ANKUR SARKAR~   51 blog posts   379 correct pred (67% accurate)
Re# 1371643-11            Tags   Past Edits
you do not selected auto upgradation option

2 posts are hidden.
  
Predictions: 0
confirm: 0
rac: 0
wl: 0
Journey: Thu Apr 23, 2015 @ 22:45
Class: Sleeper - SL   |   Tot Seats: Avbl 478   |   Charting: < 18:45
Travel: LTT/Lokmanya Tilak Terminus   to   GKP/Gorakhpur Junction   |   1677 km / 1677 km
11015/Kushinagar Express (PT)
Entry# 1405595

PNR: 813-xxxxxxx    |   Similar PNRs
Posted Status as of: Mar 24 2015 (08:23)
Passenger 1: Released (Booking Status: S3,41,GN)
Passenger 2: Released (Booking Status: S3,42,GN)
Passenger 3: Released (Booking Status: S3,43,GN)
Passenger 4: Released (Booking Status: S3,44,GN)
Passenger 5: Released (Booking Status: S3,45,GN)
Passenger 6: Released (Booking Status: S3,46,GN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 23 2015 (20:58)
Passenger 1: Released (Booking Status: S3,41,GN)
Passenger 2: Released (Booking Status: S3,42,GN)
Passenger 3: Released (Booking Status: S3,43,GN)
Passenger 4: Released (Booking Status: S3,44,GN)
Passenger 5: Released (Booking Status: S3,45,GN)
Passenger 6: Released (Booking Status: S3,46,GN)
Chart PREPARED

  
1634 views
Mar 24 2015 (08:27)
CNB   542 blog posts   4127 correct pred (73% accurate)
Re# 1405595-1            Tags   Past Edits
yeh kya hua kyu hua kaise hua ? :O

  
1681 views
Mar 24 2015 (08:37)
Ateek   1131 blog posts   4397 correct pred (71% accurate)
Re# 1405595-2            Tags   Past Edits
time se bahut pehle maroge to kya hoga. 11 sec 719/291 waiting aaegi to kuch to hona hai

1 posts are hidden.

  
1424 views
Apr 13 2015 (01:07)
Bring Back Golden Days of IRI*^~   31024 blog posts   68313 correct pred (81% accurate)
Re# 1405595-4            Tags   Past Edits
jab 5 Sec mein Book hoga to Railway bhi kuchh naa kuchh to karegi
  
Predictions: 23
confirm: 2
rac: 12
wl: 9
Journey: Tue Apr 21, 2015 @ 06:35
Class: Sleeper - SL   |   Tot Seats: Avbl 323
Travel: LTT/Lokmanya Tilak Terminus   to   BSB/Varanasi Junction   |   1477 km / 1708 km
15017/Kashi Express (PT)
Entry# 1374539

Posted by: PASCHIM RAILWAY*^~   5581 blog posts   5312 correct pred (71% accurate)
PNR: 873-xxxxxxx    |   Similar PNRs
Posted Status as of: Feb 20 2015 (08:05)
Passenger 1: Waitlist# 376 (Booking Status: W/L 561,GNWL)
Passenger 2: Waitlist# 377 (Booking Status: W/L 562,GNWL)
Passenger 3: Waitlist# 378 (Booking Status: W/L 563,GNWL)
Passenger 4: Waitlist# 379 (Booking Status: W/L 564,GNWL)
Passenger 5: Waitlist# 380 (Booking Status: W/L 565,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 21 2015 (17:16)
Passenger 1: Can/Mod (Booking Status: W/L 561,GNWL)
Passenger 2: Can/Mod (Booking Status: W/L 562,GNWL)
Passenger 3: Can/Mod (Booking Status: W/L 563,GNWL)
Passenger 4: Can/Mod (Booking Status: W/L 564,GNWL)
Passenger 5: Can/Mod (Booking Status: W/L 565,GNWL)
Chart PREPARED

1 posts are hidden.

  
1814 views
Mar 28 2015 (08:22)
CNB   542 blog posts   4127 correct pred (73% accurate)
Re# 1374539-2            Tags   Past Edits
hope so

  
1798 views
Mar 28 2015 (08:26)
PASCHIM RAILWAY*^~   5581 blog posts   5312 correct pred (71% accurate)
Re# 1374539-3            Tags   Past Edits
Bas RAC main aa jaaye....

  
1887 views
Mar 28 2015 (08:26)
CNB   542 blog posts   4127 correct pred (73% accurate)
Re# 1374539-4            Tags   Past Edits
rac to a jayegi

  
1658 views
Apr 10 2015 (19:52)
PASCHIM RAILWAY*^~   5581 blog posts   5312 correct pred (71% accurate)
Re# 1374539-5            Tags   Past Edits
Moving very slowly....I doubt weather RAC mai pahunchegi ya nahi...need some more predictions...what abt extra coaches are they attaches in this train...any notification from ner????

5 posts are hidden.
  
Predictions: 0
confirm: 0
rac: 0
wl: 0
Journey: Sat Apr 11, 2015 @ 22:40
Class: Sleeper - SL   |   Tot Seats: Avbl 64
Travel: BDTS/Bandra Terminus   to   GD/Gonda Junction   |   1693 km / 2155 km
19039/Avadh Express (PT)
Entry# 1424009

Posted by: CNB   542 blog posts   4127 correct pred (73% accurate)
PNR: 813-xxxxxxx    |   Similar PNRs
Posted Status as of: Apr 10 2015 (10:08)
Passenger 1: Confirmed (Booking Status: S15,50,PT)
Passenger 2: Confirmed (Booking Status: S15,49,PT)
Passenger 3: Confirmed (Booking Status: S15,52,PT)
Passenger 4: Confirmed (Booking Status: S15,51,PT)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 10 2015 (12:12)
Passenger 1: Confirmed (Booking Status: S15,50,PT)
Passenger 2: Confirmed (Booking Status: S15,49,PT)
Passenger 3: Confirmed (Booking Status: S15,52,PT)
Passenger 4: Confirmed (Booking Status: S15,51,PT)
Chart NOT Prepared

  
1632 views
Apr 10 2015 (10:18)
जय हो ™^~   11841 blog posts   114201 correct pred (75% accurate)
Re# 1424009-1            Tags   Past Edits

  
1510 views
Apr 10 2015 (10:21)
CNB   542 blog posts   4127 correct pred (73% accurate)
Re# 1424009-2            Tags   Past Edits
on base fare :)
Page#    424 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed May 10
Trains with ARP 15 Dep on: Mon May 15
Trains with ARP 30 Dep on: Tue May 30
Trains with ARP 120 Dep on: Mon Aug 28

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site