Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Apr 29, 2017 07:25:58 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Apr 29, 2017 07:25:58 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by vipinpandit
Page#    406 Blog Entries  next>>
  
General Travel
0 Followers
3548 views
Mar 29 2017 (13:42)   09653/Indore - Ajmer Inaugural Special | RTM/Ratlam Junction (7 PFs)

vipinpandit   595 blog posts   1 correct pred (100% accurate)
Entry# 2214918            Tags   Past Edits
#indorenews
Indore - Ajmer Inaugural Special (via Fatehabad-Badnagar-Ratlam). The first regular passenger service on Q-Track near Ratlam.
इंदौर-अजमेर उद्घाटन विशेष (बरास्ता फ़तेहाबाद-बड़नगर-रतलाम). रतलाम के निकट बने क्यू-ट्रैक पर चलने वाली पहली नियमित सवारी गाड़ी...

  
3290 views
Mar 29 2017 (14:35)
Pramodbhandari96~   375 blog posts   1 correct pred (100% accurate)
Re# 2214918-1            Tags   Past Edits
यदि इस ट्रेन का समय बदला जाता है तो रतलाम से 8.15 am को चलने वाली हल्दी घाटी पेसेंजर को निरस्त किये जाने की आशंका हो गई हैं.

  
2733 views
Mar 31 2017 (12:58)
vipinpandit   595 blog posts   1 correct pred (100% accurate)
Re# 2214918-2            Tags   Past Edits
हां लेकिन जिस तरह सुबह 4 बजे चलने वाली इंदौर-रीवा अपने समय को लेकर फेल हो रही थी और बाद में समय बदलने के बाद अब उसे अच्छा प्रतिसाद मिलने लगा है, उसी तरह ये भी सुबह 4.30 बजे के समय के कारण शुरुआत में ही फेल होने लगी है। और इसका भी समय बदलने की मांग उठ रही है क्योंकि दूरदराज में रहने वालों को आधी रात अपने घर से निकलकर सुबह स्टेशन पहुंचना पड़ता है

  
2148 views
Apr 06 2017 (13:17)
Pramodbhandari96~   375 blog posts   1 correct pred (100% accurate)
Re# 2214918-3            Tags   Past Edits
ye baat to start se hi pata thi ki 19653/54 ko Indore tak extend kiya gaya to Indore se departure time 4.30 am
& Mhow se 4.00 am ka ho possible hoga,
is ke bajay Indore Jaipur link exp. ko via fatehabad ho k Ratlam se link/ delink kiya ja sakta hai.
2009 se ab tak sirf Ratlam se organise ho ne wali trainss
...
more...
ko hi cancelled kiya gaya hai,
Ratlam jn. se new trains start nahi ki gayi hai.
in future Ratlam- Agra passenger,Ratlam neemuch demu
Ratlam- Bhilwara demu ko bhi cancelled kiya ja sakta hai.
  
General Travel
0 Followers
5993 views
Feb 28 2017 (16:25)   INDB/Indore Junction BG (6 PFs)

vipinpandit   595 blog posts   1 correct pred (100% accurate)
Entry# 2181213            Tags   Past Edits
#indorenews
Speed trial between Tihi-Rau (single line) and Rau-Indore (second line). After almost a year, the second line between Rau and Indore is ready and CRS Inspection Train ran @110 for the speed trial. With this there will be two lines avaialble from Indore to Rau Jn. and then 2 single lines towards Mhow and Tihi (Pithampur) respectively. In Tihi, ConCor has constructed a new container depot which will have goods and container trains from Tihi to Ratlam.
Enjoy the video..

  
4568 views
Mar 02 2017 (10:43)
Narendra yadav   156 blog posts
Re# 2181213-1            Tags   Past Edits
Great.
please update it on map.
#admin #moderator

1 posts are hidden.

  
4043 views
Mar 09 2017 (12:25)
Shubham Jain*^~   949 blog posts   1601 correct pred (78% accurate)
Re# 2181213-3            Tags   Past Edits
Vipinji Rau Mhow bhi double line kar rahe hai na...

  
3377 views
Mar 15 2017 (15:49)
vipinpandit   595 blog posts   1 correct pred (100% accurate)
Re# 2181213-4            Tags   Past Edits
Nahi.. Filhaal to aisi koi planning nahi hai... Mhow-Khandwa chalu hone ke baad shayad zarurat padne par doubling ho sakti hai... Abhi to sirf DEMU aur 1-2 passengers hi Mhow se chalengi.. Haan Rau-Indore ke bich zarur 2 lines ho gayi hain...

  
1792 views
Mar 29 2017 (18:49)
Narendra yadav   156 blog posts
Re# 2181213-5            Tags   Past Edits
is Both line is electrified between indore and Rau.

  
1525 views
Mar 31 2017 (12:56)
vipinpandit   595 blog posts   1 correct pred (100% accurate)
Re# 2181213-6            Tags   Past Edits
Yes Indore to Rau double line and Rau to INdore single line is fully electrified now.. Trials are underway and a CRS inspection is scheduled for 31st March
  
General Travel
0 Followers
10825 views
Oct 21 2016 (10:06)   INDB/Indore Junction BG (6 PFs)

vipinpandit   595 blog posts   1 correct pred (100% accurate)
Entry# 2031150            Tags   Past Edits
#indorenews
Gr8 news for Indore-Malwa region as railway has decided to start running goods train between Tihi (Pithampur) and Indore from tomorrow 22 October. Since a mega Investor Summit will be held in Indore on 22 and 23 Oct organized by MP Govt. railway has decided to run a inaugural special container train on this new track. Some cabinet minister from central govt would be inaugurating this special container rake. This new line will move towards Dhar-Alirajpur-Dahod as part of the much awaited and highly delayed Indore-Dahod rail line project.

  
Oct 23 2016 (07:51)
vipinpandit   595 blog posts   1 correct pred (100% accurate)
Re# 2031150-1            Tags   Past Edits
First container train with 90 containers came from Tihi to Indore and went to Mumbai on 22nd October.

  
3857 views
Jan 21 2017 (21:24)
Anurag Solanki   35 blog posts
Re# 2031150-2            Tags   Past Edits
Very good for pithampur

  
3535 views
Jan 24 2017 (21:22)
Anurag Solanki   35 blog posts
Re# 2031150-3            Tags   Past Edits
No need of tunnel in pithampur it is waste of time nd waste of currency we easily cut vertical shaft do as a national highway rau khalgat highway

  
3560 views
Jan 24 2017 (21:24)
Anurag Solanki   35 blog posts
Re# 2031150-4            Tags   Past Edits
Early startup new line we are waiting this project nd early work start in pithampur

  
3350 views
Jan 26 2017 (13:01)
Anurag Solanki   35 blog posts
Re# 2031150-5            Tags   Past Edits
No train start in current status why nd no work done in Second phase pithampur
  
General Travel
0 Followers
3741 views
Dec 21 2016 (10:17)   52973/Mhow - Sanawad MG Passenger

vipinpandit   595 blog posts   1 correct pred (100% accurate)
Entry# 2098267            Tags   Past Edits
Khandwa-Akola also closing along with Sanawad-Khandwa from 1st January 2017
  
General Travel
0 Followers
10765 views
Aug 11 2016 (05:47)   12961/Avantika SF Express (PT) | INDB/Indore Junction BG (6 PFs)
 

vipinpandit   595 blog posts   1 correct pred (100% accurate)
Entry# 1958192            Tags   Past Edits
#indorenews
Avantika Express to get LHB rake soon.

  
10405 views
Aug 11 2016 (06:22)
Saif Ali^~   7389 blog posts   134 correct pred (77% accurate)
Re# 1958192-1            Tags   Past Edits
Phir to Mumbai Vadodara Express ko Bhi LHB Milega Kyunki Avantika ke saath RSA Hai Mumbai Vadodara Express

  
10469 views
Aug 11 2016 (10:01)
🚂अलविदा खंडवा मिटरगेज🙋🙋~   628 blog posts
Re# 1958192-2            Tags   Past Edits
Lok Sabha Speakar SUMITRA Tai ji ke focus se jald hi Mhow-Khandwa-Akola G.C. Hone ki ummeed hain
  
General Travel
0 Followers
9646 views
Aug 09 2016 (16:46)   RTM/Ratlam Junction (7 PFs)
 

vipinpandit   595 blog posts   1 correct pred (100% accurate)
Entry# 1956596            Tags   Past Edits
#indorenews
Q-Track gets commissioned, as WR successfully runs an empty goods rake on it. Hopefully a couple of new trains / extended trains start plying via Q-track.
PS: Look at beautiful curved track and even beautiful yellow-blue goods loco with the tiny and empty rake...
click here
  
General Travel
0 Followers
8970 views
Aug 05 2016 (12:00)   RTM/Ratlam Junction (7 PFs)
 

vipinpandit   595 blog posts   1 correct pred (100% accurate)
Entry# 1952419            Tags   Past Edits
#indorenews
Ratlam Q-Track gets OK report from CRS. Goods train to start anytime now. Passenger trains yet to get approval from Railway Board. However, Ratlam divison has already sent request for extension of existing trains to Indore via Q-Track. Hopefully they'll soon start running.
  
General Travel
0 Followers
9881 views
Aug 04 2016 (08:57)   12415/Indore - Delhi Sarai Rohilla SF Intercity Express
 

सचिन शर्मा سچن شرما*^   5071 blog posts   93 correct pred (69% accurate)
Entry# 1951352            Tags   Past Edits
#indorenews: 12415 now with LHB.

1 posts are hidden.

  
9069 views
Aug 05 2016 (11:17)
vipinpandit   595 blog posts   1 correct pred (100% accurate)
Re# 1951352-2            Tags   Past Edits
It is an Overnight ICE. Hence no CC needed.
  
Rail News
0 Followers
8084 views
IR AffairsNWR/North Western  -  
Jul 31 2016 (19:40)   on this platform trains are locked in chains - www.bhaskar.com
 

For Better Managed Indian Railways~   948 news posts
Entry# 1948361   News Entry# 275504         Tags   Past Edits
बाड़मेर। राजस्थान में एक रेलवे स्टेशन ऐसा है, जहां ट्रेन को चेन से बांध कर रखा जाता है। जी नहीं...ऐसा ट्रेन के चोरी हो जाने के डर से नहीं किया जाता, बल्कि यहां ढलान होने के कारण ट्रेन अपने अाप न चल पड़े, इसलिए प्लेटफार्म पर आते ही ट्रेन को चेन से बांध दिया जाता है। बाड़मेर रेलवे स्टेशन से कई बार ढलान के कारण ट्रेन अपने आप दौड़ पड़ी हैं तो रेलवे को यही हल सूझा। हालांकि रेलवे ने ऐसी घटनाओं को रोकने के लिए नया ट्रैक भी बनाया है।
दरअसल बाड़मेर प्लेटफार्म पर कई बार ट्रेन के अपने आप दौड़ने की घटनाएं हो चुकी हैं।
-
...
more...
बाड़मेर से उत्तरलाई की तरफ रेलवे ट्रैक की ढलान होने के कारण प्लेटफॉर्म पर खड़ी ट्रेन चल पड़ती है।
- इस तरह की पिछले तीन साल में तीन बड़ी घटनाएं हुई हैं।
- इसके बाद अब रेलवे ने नया ट्रैक तैयार किया है ताकि ऐसे हादसे दोबारा न हों।
प्लेटफॉर्म पर जंजीरों में कैद हो जाती है ट्रेनें
- जिस ट्रेन को इस स्टेशन में हॉल्ट करना होता है, उसे सुरक्षित रखने के लिए ऐसा किया जाता है।
- ट्रेन के प्लेटफार्म पर आते ही पहले कर्मचारी उसमें स्टीयरिंग घुमा कर ब्रेक लॉक लगाते हैं।
- उसके बाद ट्रेन के डिब्बों को जंजीरों से बांध देते हैं।
- पूर्व में हुई घटनाओं के बाद करीब एक दर्जन कार्मिक और अधिकारियों की नौकरी चली गई तो उन्हें यही विकल्प सबसे मुफीद लगा।
- अब रेलवे कार्मिक कोई रिस्क नहीं लेना चाहते हैं ।
- इतना ही नहीं उसे चेन से बाँधने के बाद उसके पहिये के आगे लकड़ी का गुटका भी लगाते हैं।
अब नहीं होगा बड़ा हादसा, लेकिन स्थाई समाधान नहीं
- फिलहाल रेलवे ने नेहरू नगर रेलवे ओवरब्रिज के फाटक से 100 मीटर की दूरी तक एक नया ट्रैक तैयार किया है।
- यह ट्रैक इसलिए बनाया गया है कि जैसे ही कोई ट्रेन प्लेटफॉर्म से अपने आप रवाना होती है तो उसे तत्काल दूसरी लाइन की तरफ ट्रांसफर कर दिया जाएगा, जो 100 मीटर की दूरी पर जाकर अपने आप रुक जाएगी।
- हालांकि यह स्थाई समाधान नहीं हो पाया है, फिलहाल ट्रेनों को जंजीरों से मुक्ति नहीं मिलेगी, लेकिन बड़े हादसे को रोका जा सकता है।
अब तक ये तीन बड़ी घटनाएं
- वर्ष 2011 : रात में दौड़ गया इंजन : साल 2011 में रेलवे स्टेशन के ट्रैक पर खड़ा इंजन रात 11 बजे के करीब अपने आप ही दौड़ गया। जब रेलवे कार्मिकों को भी भनक लगी तो रोकने के प्रयास भी किए, लेकिन विफल रहे। उत्तरलाई से आगे जिप्सम हाल्ट के पास स्वतः ही रुका। गनीमत रही कि उस दौरान सामने से कोई ट्रेन नहीं आई, नहीं तो बड़ा हादसा हो सकता था।
- वर्ष 2013 : गुवाहटी के 13 डिब्बे दौड़े : 25 मार्च 2013 की रात 9 बजे रेलवे स्टेशन पर खड़ी गुवाहटी एक्सप्रेस के 13 कोच अपने आप दौड़ गए। कोच में सवारियां भी थीं। ट्रेन को 11 बजे रवाना होना था। इस दौरान सामने से ट्रेन भी आने वाली थी, जिसे उत्तरलाई पर ही रोका गया। गनीमत रही कि कोई हादसा नहीं हुआ।
- वर्ष 2015 : यशवंतपुरम का एक कोच दौड़ा : 25 फरवरी 2015 को शंटिंग के दौरान यशवंतपुरम एक्सप्रेस का एक एसी कोच स्वतः ही पटरियों पर दौड़ने लगा। इस दौरान रेलवे के तीन फाटक खुले थे, लेकिन लोगों की सुझबूझ से कोई हादसा नहीं हुआ। जबकि सामने से लोकल ट्रेन आ रही थी। रेलवे अधिकारियों ने भी सुझबूझ दिखाई और कोच को उत्तरलाई के पास यार्ड पर डायवर्ट कर रोका।

1 posts are hidden.

  
8634 views
Aug 01 2016 (13:33)
vipinpandit   595 blog posts   1 correct pred (100% accurate)
Re# 1948361-2            Tags   Past Edits
यही चीज़ हमारे इंदौर में भी होती है। पहले हुए कुछ हादसों से सबक लेकर इंदौर यार्ड से लेकर लक्ष्मीबाई नगर स्टेशन तक खड़ी रहने वाली ट्रेनों को गुटके और चेन से बांधकर रखा जाता है ताकि वे पीछे की ओर लुढ़क न जाएं..

1 posts are hidden.
  
Info Update
0 Followers
21666 views
Jul 14 2016 (00:33)   22911/Shipra Express | BPL/Bhopal Junction (6 PFs)
 

Vaibhav Agarwal*^   6115 blog posts   2568 correct pred (95% accurate)
Entry# 1928758            Tags   Past Edits
12 trains to go via Bairagarh - Nishatpura avoiding Bhopal from Nov'16

3 posts are hidden.

  
19091 views
Jul 29 2016 (10:29)
vipinpandit   595 blog posts   1 correct pred (100% accurate)
Re# 1928758-6            Tags   Past Edits
इंदौर - हाबड़ा?? हाबड़ा :) :)

4 posts are hidden.
Page#    406 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue May 9
Trains with ARP 15 Dep on: Sun May 14
Trains with ARP 30 Dep on: Mon May 29
Trains with ARP 120 Dep on: Sun Aug 27

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site