Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Feb 23, 2017 10:23:31 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Feb 23, 2017 10:23:31 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by █▓▒░ ÂðÐî©ťËd ░▒▓█*^
Page#    688 Blog Entries  next>>
  
Predictions: 0
confirm: 0
rac: 0
wl: 0
Journey: Fri Jan 13, 2017 @ 18:45
Class: Sleeper - SL   |   Tot Seats: Avbl >280
Travel: BKSC/Bokaro Steel City   to   DURG/Durg Junction   |   745 km / 1923 km
17008/Darbhanga - Secunderabad Express (PT)
Entry# 2126076

PNR: 666-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Jan 13 2017 (21:05)
Passenger 1: S5,63 [SL] (Bo oking Status: S5,63,PT)
Total Fare:  780
Chart PREPARED
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jan 13 2017 (21:12)
Passenger 1: S5,63 [SL] (Booking Status: S5,63,PT)
Total Fare:  780
Chart PREPARED

  
652 views
Jan 13 2017 (21:14)
█▓▒░ ÂðÐî©ťËd ░▒▓█*^   764 blog posts   98344 correct pred (86% accurate)
Re# 2126076-1            Tags   Past Edits
Running 4 hours late
  
Predictions: 3
confirm: 2
rac: 1
wl: 0
Journey: Mon May 11, 2015 @ 17:00
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 21
Travel: NGP/Nagpur Junction   to   GD/Gonda Junction   |   1098 km / 3249 km
12512/Trivandrum-Gorakhpur Raptisagar SF Express (PT)
Entry# 1460625

Posted by: mdurishubh~   34 blog posts   4300 correct pred (79% accurate)
PNR: 430-xxxxxxx    |   Similar PNRs
Posted Status as of: May 08 2015 (20:57)
Passenger 1: Waitlist# 5 (Booking Status: W/L 88,GNWL)
Passenger 2: Waitlist# 6 (Booking Status: W/L 89,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 11 2015 (20:59)
Passenger 1: RB1 47 (Booking Status: W/L 88,GNWL)
Passenger 2: RB1 47 (Booking Status: W/L 89,GNWL)
Chart PREPARED

  
1443 views
May 10 2015 (06:39)
█▓▒░ ÂðÐî©ťËd ░▒▓█*^   764 blog posts   98344 correct pred (86% accurate)
Re# 1460625-1            Tags   Past Edits
Latest Status as of: Today (6:38AM) Refresh Status
Passenger 1: RB1 47 (Booking Status: W/L 88,GNWL)
Passenger 2: RB1 47 (Booking Status: W/L 89,GNWL)
Chart PREPARED
  
Predictions: 6
confirm: 5
rac: 1
wl: 0
Journey: Tue Apr 28, 2015 @ 08:05
Class: AC 2-tier - 2A   |   Tot Seats: Avbl 2
Travel: GWL/Gwalior Junction   to   GZB/Ghaziabad Junction   |   329 km / 2367 km
18477/Kalinga Utkal Express (PT)
Entry# 1437399

PNR: 624-xxxxxxx    |   Similar PNRs
Posted Status as of: Apr 21 2015 (19:59)
Passenger 1: Waitlist# 6 (Booking Status: W/L 6,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 26 2015 (22:42)
Passenger 1: A1,11 [SL]/Coach Position:6 (Booking Status: W/L 6,RLGN)
Chart NOT Prepared

  
1192 views
Apr 26 2015 (21:15)
█▓▒░ ÂðÐî©ťËd ░▒▓█*^   764 blog posts   98344 correct pred (86% accurate)
Re# 1437399-1            Tags   Past Edits
Latest Status as of: Today (9:15PM) Refresh Status Status Refreshed.
Passenger 1: A1,11 [SL]/Coach Position:6 (Booking Status: W/L 6,RLGN)
Chart NOT Prepared
  
Predictions: 8
confirm: 2
rac: 0
wl: 6
Journey: Mon Apr 27, 2015 @ 11:00
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 16
Travel: VSKP/Visakhapatnam Junction   to   YPR/Yesvantpur Junction   |   1079 km / 1960 km
12863/Howrah - Yesvantpur SF Express (PT)
Entry# 1437624

PNR: 674-xxxxxxx    |   Similar PNRs
Posted Status as of: Apr 22 2015 (01:18)
Passenger 1: Waitlist# 24 (Booking Status: W/L 32,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 27 2015 (17:56)
Passenger 1: Waitlist# 9 (Booking Status: W/L 32,RLGN)
Chart PREPARED

  
1193 views
Apr 26 2015 (20:39)
█▓▒░ ÂðÐî©ťËd ░▒▓█*^   764 blog posts   98344 correct pred (86% accurate)
Re# 1437624-1            Tags   Past Edits
Latest Status as of: Today (8:38PM) Refresh Status
Passenger 1: Waitlist# 9 (Booking Status: W/L 32,RLGN)
Chart PREPARED
  
Predictions: 9
confirm: 7
rac: 2
wl: 0
Journey: Mon Apr 27, 2015 @ 11:05
Class: AC 3-tier - 3A   |   Tot Seats: Avbl >36
Travel: GZB/Ghaziabad Junction   to   JSG/Jharsuguda Junction   |   1359 km / 2367 km
18478/Kalinga Utkal Express (PT)
Entry# 1431539

PNR: 240-xxxxxxx    |   Similar PNRs
Posted Status as of: Apr 17 2015 (07:23)
Passenger 1: Waitlist# 17 (Booking Status: W/L 27,GNWL)
Passenger 2: Waitlist# 18 (Booking Status: W/L 28,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 26 2015 (20:46)
Passenger 1: Waitlist# 3 (Booking Status: W/L 27,GNWL)
Passenger 2: Waitlist# 4 (Booking Status: W/L 28,GNWL)
Chart PREPARED

  
1202 views
Apr 26 2015 (20:37)
█▓▒░ ÂðÐî©ťËd ░▒▓█*^   764 blog posts   98344 correct pred (86% accurate)
Re# 1431539-1            Tags   Past Edits
Latest Status as of: Today (8:37PM) Refresh Status
Passenger 1: Waitlist# 3 (Booking Status: W/L 27,GNWL)
Passenger 2: Waitlist# 4 (Booking Status: W/L 28,GNWL)
Chart PREPARED
  
Predictions: 6
confirm: 5
rac: 0
wl: 1
Journey: Mon Apr 27, 2015 @ 14:05
Class: AC 2-tier - 2A   |   Tot Seats: Avbl 8
Travel: KIR/Katihar Junction   to   BZA/Vijayawada Junction   |   1653 km / 2732 km
15228/Muzaffarpur - Yesvantpur Weekly Express (PT)
Entry# 1431076

PNR: 653-xxxxxxx    |   Similar PNRs
Posted Status as of: Apr 16 2015 (18:11)
Passenger 1: Waitlist# 3 (Booking Status: W/L 7,GNWL)
Passenger 2: Waitlist# 4 (Booking Status: W/L 8,GNWL)
Passenger 3: Waitlist# 5 (Booking Status: W/L 9,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 26 2015 (20:32)
Passenger 1: RA1 43 (Booking Status: W/L 7,GNWL)
Passenger 2: RA1 43 (Booking Status: W/L 8,GNWL)
Passenger 3: RA1 45 (Booking Status: W/L 9,GNWL)
Chart PREPARED

  
1245 views
Apr 26 2015 (20:34)
█▓▒░ ÂðÐî©ťËd ░▒▓█*^   764 blog posts   98344 correct pred (86% accurate)
Re# 1431076-1            Tags   Past Edits
Latest Status as of: Today (8:32PM) Refresh Status
Passenger 1: RA1 43 (Booking Status: W/L 7,GNWL)
Passenger 2: RA1 43 (Booking Status: W/L 8,GNWL)
Passenger 3: RA1 45 (Booking Status: W/L 9,GNWL)
Chart PREPARED
  
Predictions: 9
confirm: 9
rac: 0
wl: 0
Journey: Mon Apr 27, 2015 @ 14:04
Class: 2nd Sitting - 2S   |   Tot Seats: Avbl >57
Travel: KHED/Khed   to   DIVA/Diva Junction   |   201 km / 466 km
50106/Sindhudurg Passenger
Entry# 1442672

PNR: 852-xxxxxxx    |   Similar PNRs
Posted Status as of: Apr 26 2015 (00:27)
Passenger 1: Waitlist# 7 (Booking Status: W/L 17,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 27 2015 (00:46)
Passenger 1: Waitlist# 1 (Booking Status: W/L 17,GNWL)
Chart PREPARED

  
2190 views
Apr 26 2015 (20:34)
█▓▒░ ÂðÐî©ťËd ░▒▓█*^   764 blog posts   98344 correct pred (86% accurate)
Re# 1442672-1            Tags   Past Edits
Latest Status as of: Today (8:32PM) Refresh Status Status Refreshed.
Passenger 1: Waitlist# 1 (Booking Status: W/L 17,GNWL)
Chart PREPARED
  
Predictions: 10
confirm: 5
rac: 0
wl: 5
Journey: Mon Apr 27, 2015 @ 14:00
Class: 2nd Sitting - 2S   |   Tot Seats: Avbl 24
Travel: JL/Jalgaon Junction   to   ST/Surat   |   311 km / 563 km
59026/Amravati - Surat Fast Passenger
Entry# 1406041

Posted by: Basant Lohiya   30 blog posts   4 correct pred (80% accurate)
PNR: 813-xxxxxxx    |   Similar PNRs
Posted Status as of: Mar 24 2015 (15:28)
Passenger 1: Waitlist# 54 (Booking Status: W/L 56,GNWL)
Passenger 2: Waitlist# 55 (Booking Status: W/L 57,GNWL)
Passenger 3: Waitlist# 56 (Booking Status: W/L 58,GNWL)
Passenger 4: Waitlist# 57 (Booking Status: W/L 59,GNWL)
Passenger 5: Waitlist# 58 (Booking Status: W/L 60,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 29 2015 (11:32)
Passenger 1: Waitlist# 21 (Booking Status: W/L 56,GNWL)
Passenger 2: Waitlist# 22 (Booking Status: W/L 57,GNWL)
Passenger 3: Waitlist# 23 (Booking Status: W/L 58,GNWL)
Passenger 4: Waitlist# 24 (Booking Status: W/L 59,GNWL)
Passenger 5: Waitlist# 25 (Booking Status: W/L 60,GNWL)
Chart PREPARED

  
2106 views
Apr 26 2015 (20:33)
█▓▒░ ÂðÐî©ťËd ░▒▓█*^   764 blog posts   98344 correct pred (86% accurate)
Re# 1406041-1            Tags   Past Edits
Latest Status as of: Today (8:32PM) Refresh Status
Passenger 1: Waitlist# 21 (Booking Status: W/L 56,GNWL)
Passenger 2: Waitlist# 22 (Booking Status: W/L 57,GNWL)
Passenger 3: Waitlist# 23 (Booking Status: W/L 58,GNWL)
Passenger 4:
...
more...
Waitlist# 24 (Booking Status: W/L 59,GNWL)
Passenger 5: Waitlist# 25 (Booking Status: W/L 60,GNWL)
Chart PREPARED
  
Predictions: 6
confirm: 4
rac: 0
wl: 2
Journey: Mon Apr 27, 2015 @ 14:10
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 18
Travel: VSKP/Visakhapatnam Junction   to   MAS/Chennai Central   |   781 km / 1663 km
12839/Howrah - Chennai Mail (PT)
Entry# 1442916

Posted by: RESHMASIKKER   5 blog posts   467 correct pred (77% accurate)
PNR: 674-xxxxxxx    |   Similar PNRs
Posted Status as of: Apr 26 2015 (10:30)
Passenger 1: Waitlist# 30 (Booking Status: W/L 65,PQWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 26 2015 (20:36)
Passenger 1: B2,4 [LB] (Booking Status: W/L 65,PQWL)
Chart PREPARED

  
1659 views
Apr 26 2015 (20:31)
█▓▒░ ÂðÐî©ťËd ░▒▓█*^   764 blog posts   98344 correct pred (86% accurate)
Re# 1442916-1            Tags   Past Edits
Latest Status as of: Today (8:31PM) Refresh Status
Passenger 1: B2,4 [LB] (Booking Status: W/L 65,PQWL)
Chart PREPARED
  
Predictions: 17
confirm: 17
rac: 0
wl: 0
Journey: Mon Apr 27, 2015 @ 15:45
Class: Sleeper - SL   |   Tot Seats: Avbl 114
Travel: JP/Jaipur Junction   to   BSB/Varanasi Junction   |   890 km / 1201 km
14854/Marudhar Express (via Faizabad)
Entry# 1380863

Posted by: TOURISTSFRIEND11   2 blog posts   3224 correct pred (87% accurate)
PNR: 253-xxxxxxx    |   Similar PNRs
Posted Status as of: Feb 26 2015 (21:35)
Passenger 1: Waitlist# 1 (Booking Status: W/L 9,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 26 2015 (20:36)
Passenger 1: RS10 39 (Booking Status: W/L 9,GNWL)
Chart PREPARED

  
2540 views
Apr 26 2015 (20:29)
█▓▒░ ÂðÐî©ťËd ░▒▓█*^   764 blog posts   98344 correct pred (86% accurate)
Re# 1380863-1            Tags   Past Edits
Latest Status as of: Today (8:28PM) Refresh Status
Passenger 1: RS10 39 (Booking Status: W/L 9,GNWL)
Chart PREPARED
Page#    688 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Mar 5
Trains with ARP 15 Dep on: Fri Mar 10
Trains with ARP 30 Dep on: Sat Mar 25
Trains with ARP 120 Dep on: Fri Jun 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site