Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Feb 20, 2017 03:17:27 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Feb 20, 2017 03:17:27 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Prakhar*^~
Page#    2138 Blog Entries  next>>
  
General Travel
0 Followers
156 views
Today (00:01)   12452/Shram Shakti Express | NDLS/New Delhi (16 PFs)

Prakhar*^~   4166 blog posts   412 correct pred (82% accurate)
Entry# 2171184            Tags   Past Edits
RSA'd 12452 Shram Shakti Friday departure.
.
Aaj 12451 mei poore train RSA dibbe thae.

  
120 views
Today (00:45)
IR no more Safe^~   18650 blog posts   93804 correct pred (74% accurate)
Re# 2171184-1            Tags   Past Edits
ye coach board to NCR ka hi hai.
half red half green.
par puri rake NR ki hai ?

2 posts are hidden.
  
Info Update
0 Followers
1101 views
Feb 17 2017 (10:18)   12402/Magadh Express (PT)

Magadh Express NDLS IPR~   5642 blog posts   637 correct pred (71% accurate)
Entry# 2167733            Tags   Past Edits
Magadh rake sharing with Shram Shakti?
Rake sharing toh nahi, mujhe lag raha - H1 coach sharing hoga, as CC of both the trains are quite different :)

16 posts are hidden.

  
142 views
Today (00:05)
Prakhar*^~   4166 blog posts   412 correct pred (82% accurate)
Re# 2167733-17            Tags   Past Edits
Destination board typical NR type hai. Just departed from CNB.

  
116 views
Today (00:20)
Prakhar*^~   4166 blog posts   412 correct pred (82% accurate)
Re# 2167733-18            Tags   Past Edits
It wud b more preferred if 12401/02 ka 12428/27 se RSA karte.
12401/02 ka terminal change karna padta bas.
CC bhi matching tha.
  
General Travel
0 Followers
319 views
Yesterday (09:11)   12402/Magadh Express (PT)

Magadh Express NDLS IPR~   5642 blog posts   637 correct pred (71% accurate)
Entry# 2170057            Tags   Past Edits
My Guess - Magadh 12401 / 12402 rake sharing with Shram Shakti 12451 / 12452 done for -
1. Magadh will be an NCR / CNB base train.
2. NDLS won't do primary maintenance of 12401.
3. 12401 will run on priority in NCR / ALD, as NDLS need to do secondary maintenance and depart 12452 from NDLS at right time.
4.
...
more...
This RSA will save 1 rake and with 4 rakes, these 2 trains will run on time.
5. This won't require any time table change for both the trains.
6. Magadhs' 75% run is on NCR, so this will automatically set the precedence for Magagh to run good in NCR :)

1 posts are hidden.

  
93 views
Today (00:16)
Prakhar*^~   4166 blog posts   412 correct pred (82% accurate)
Re# 2170057-2            Tags   Past Edits
Winters mei watt lag jayegi
  
Info Update
0 Followers
1819 views
Feb 03 2017 (15:47)   ALD/Allahabad Junction (10 PFs)

Divyanshu Gupta in City of Nawabs called Lucknow^~   30166 blog posts   22601 correct pred (75% accurate)
Entry# 2150184            Tags   Past Edits
NCR #PINK BOOK 2017-2018
1. Naini-Chheoki - 3rd down line with addl platform (2 km)
2. Bhaupur-Panki - 4th line connecting down loop of Baupur to shunting neck of Panki (11 km)
3. Allahabad Division - Construction of Kanpur Fly-over

5 posts are hidden.

  
546 views
Feb 03 2017 (23:44)
Prakhar*^~   4166 blog posts   412 correct pred (82% accurate)
Re# 2150184-7            Tags   Past Edits
What exactly they mean by kanpur flyover ?

  
1155 views
Feb 04 2017 (00:05)
😍12423 Dibrugarh Rajdhani 12424😍^~   2430 blog posts   13311 correct pred (76% accurate)
Re# 2150184-8            Tags   Past Edits
Maybe that COD one...

  
1159 views
Feb 04 2017 (00:10)
Abhishek Jaiswal   44637 blog posts   18337 correct pred (69% accurate)
Re# 2150184-9            Tags   Past Edits
Govindpuri to GMC. (Bhimsen-CNB line)

  
1026 views
Feb 04 2017 (12:48)
Prakhar*^~   4166 blog posts   412 correct pred (82% accurate)
Re# 2150184-10            Tags   Past Edits
Sounds realisatic.

2 posts are hidden.
  
Rail News
0 Followers
632 views
New Facilities/TechnologyNCR/North Central  -  
Jan 17 2017 (00:21)   पुराना प्लेटफार्म तोड़ बिछाना होगा नया ट्रैक

Prakhar*^~   220 news posts
Entry# 2131801   News Entry# 291388         Tags   Past Edits
जागरण संवाददाता, कानपुर : गोविंदपुरी स्टेशन को टर्मिनल बनाने के लिए सबसे पहले पुराने प्लेटफार्म को तोड़कर नया रेलवे ट्रैक बिछाना होगा। नया ट्रैक बिछेगा तो सिग्नल आदि को हटाने के साथ कई अन्य काम भी करने होंगे। जब युद्धस्तर पर काम होगा तभी सीआरबी की घोषणा के मुताबिक जून माह तक गोविंदपुरी स्टेशन टर्मिनल बनने लायक हो सकेगा।
.
रेलवे बोर्ड के अध्यक्ष (सीआरबी) एके मित्तल जून तक गोविंदपुरी स्टेशन को टर्मिनल बनाने का लक्ष्य निर्धारित कर गए हैं। इसके लिए कड़ी मशक्कत करनी होगी। गोविंदपुरी अभी कामर्शियल स्टेशन है, आपरेटिंग स्टाफ
...
more...
यहां नहीं बैठता है। केवल टिकट वितरण और रिजर्वेशन का ही काम होता है। स्टेशन मास्टर से लेकर अन्य स्टाफ की तैनाती करनी होगी।
.
..तो गोविंदपुरी से चलेगी श्रमशक्ति
रेलवे सूत्र बताते हैं कि टर्मिनल बनने पर गोविंदपुरी से ही श्रमशक्ति को चलाने का मसौदा तैयार कर लिया गया है। इसके अलावा कुछ और ट्रेनें दी जा सकती हैं। लगभग आधा दर्जन ट्रेनों के ठहराव वाले गोविंदपुरी स्टेशन पर अभी ट्रेनों का चयन नहीं किया गया है पर श्रमशक्ति तय है।
.
यह है व्यवस्था
पुराना प्लेटफार्म है छोटा : पुराना प्लेटफार्म पांच-छह बोगियों वाला ही है। इस पर 22-24 बोगी की ट्रेन खड़ी नहीं हो सकती। इससे सटा एक प्लेटफार्म बनकर तैयार है जो 26 बोगी ट्रेन के लिए उपयुक्त है।
बिल्डिंग है तैयार : गोविंदपुरी स्टेशन पर बिल्डिंग बनकर तैयार है। रेलवे कर्मी बताते हैं कि इसके बनने तक छह साल में पांच-छह ठेकेदार छोड़कर भाग चुके हैं। समय के साथ लागत बढ़ गई थी।
प्रतीक्षालय में टिकट वितरण : बिल्डिंग में स्थित महिला प्रतीक्षालय में टिकट वितरण व कैश का काम होता है। यहां चीफ बुकिंग सुपरवाइजर हरीप्रकाश बैठते हैं। कैश का काम होने की वजह से इसमें ग्रिल लगवा दी गई है। वहीं पुरुष प्रतीक्षालय में टिकट वितरण होता है।

  
612 views
Jan 18 2017 (21:40)
Arushsharma991   120 blog posts
Re# 2131801-1            Tags   Past Edits
Finally CNB ka load Krne k liye kch to steps liye IR ne...

1 posts are hidden.

  
806 views
Jan 19 2017 (06:44)
Prakhar*^~   4166 blog posts   412 correct pred (82% accurate)
Re# 2131801-3            Tags   Past Edits
Bht purana proposal. Kaam bht slow hai.
.
Lets see kab tak hota.
.
Haan scope and promising future hai
  
Rail News
0 Followers
452 views
New Facilities/Technology
Jan 17 2017 (00:20)   बिठूर रेल लाइन पर अंडरपास बनना शुरू

Prakhar*^~   220 news posts
Entry# 2129886   News Entry# 291387         Tags   Past Edits
बिठूर रेल लाइन पर अंडरपास बनना शुरू
.
बिठूर : रेलवे के नक्शे पर आने को बेताब बिठूर के लिए मंधना से रेलवे लाइन बिछाने का काम तेजी से चल रहा है। एक ओर जहां आमान परिवर्तन का काम चालू है, वहीं रविवार को इस रूट पर मोहम्मदपुर स्टेशन के निकट अंडरपास बनाए जाने का काम शुरू हो गया है। जिससे ग्रामीणों में खुशी है। बिठूर रेलवे लाइन पर साढ़े आठ किमी. ट्रैक बिछाने का काम चल रहा है। अ‌र्द्धनिर्मित मोहम्मदपुर स्टेशन से सटे मैनावती मार्ग के पास रविवार से सात सौ मीटर
...
more...
अंडरपास बनाने का काम शुरू कर दिया गया। ग्रामीणों का कहना है कि जल्द ही वह लोग रेल सेवा का लाभ ले सकेंगे। स्टेशन बनने के बाद ट्रेनें रुकेंगी और अंडरपास से आवागमन आसान हो जाएगा।

  
1355 views
Jan 17 2017 (09:08)
AkashNER~   258 blog posts   66 correct pred (66% accurate)
Re# 2129886-1            Tags   Past Edits
That is some great news. Good to know that GC held it's pace over the time period and soon the rail connectivity would be there upto Brahmavart.
  
★★  Rail Fanning
0 Followers
1935 views
Jan 14 2017 (20:35)   15484/Sikkim Mahananda Express | ALJN/Aligarh Junction (7 PFs) | CNB/WAP-4/22299

Railfan Saini Ji   23 blog posts
Entry# 2127260            Tags   Past Edits
1 compliments
Nice bro...
Need some rest .... !!!! 15484 Sikkim Mahananda Exp. With 22299 numbered CNB WAP4 locomotive waiting for signal on PF no. 2 of Aligarh Junction

1 posts are hidden.

  
1453 views
Jan 15 2017 (14:46)
Prakhar*^~   4166 blog posts   412 correct pred (82% accurate)
Re# 2127260-2            Tags   Past Edits
kar dia show. update nhi tha. :-)

1 posts are hidden.

  
1208 views
Jan 16 2017 (18:06)
saifmalikbf143~   264 blog posts
Re# 2127260-4            Tags   Past Edits
Ye toh dobara gyab ho gaya halt aljn ka

1 posts are hidden.
  
Rail News
0 Followers
545 views
Commentary/Human InterestNER/North Eastern  -  
Feb 24 2016 (14:17)   ट्रैक हटेगा या बनेंगे ओवरब्रिज

Prakhar*^~   220 news posts
Entry# 2122272   News Entry# 258597         Tags   Past Edits
ट्रैक हटेगा या बनेंगे ओवरब्रिज
कानपुर, जागरण संवाददाता: अनवरगंज- मंधना के बीच रेल क्रासिंगों पर जाम की समस्या से निजात मिलने की उम्मीद जगी है। चाहे ट्रैक हटे या फिर ओवरब्रिज बनें जाम से तो मुक्ति मिल ही जाएगी। इस समस्या के समाधान के लिए अब मुख्यमंत्री ने जहां ट्रैक हटाने का प्रस्ताव भेजा है। अगर उनका प्रस्ताव मंजूर होता है तो क्रासिंग ही खत्म हो जाएगी और अगर प्रस्ताव मंजूर नहीं होता है तो ओवरब्रिजों का निर्माण तय है। मंधना से ... और पढ़ें »

  
690 views
Jan 10 2017 (12:53)
Arushsharma991   120 blog posts
Re# 2122272-1            Tags   Past Edits
Finally is route ka kya decide hua?? Overbridge ke news to ayi thi

1 posts are hidden.
  
Rail News
0 Followers
1754 views
New Facilities/TechnologyNR/Northern  -  
Dec 30 2016 (10:02)   5 new platforms to ease rail movement in city - Times of India

AkashNER~   7 news posts
Entry# 2110200   News Entry# 290045         Tags   Past Edits
To rid passengers of delayed arrival and departure to and from the city, five new platforms are being built, two at Charbagh railway station and three at Transportnagar. Charbagh has only nine platforms against the present-day requirement of 16 to operate more than 300 trains daily. Besides, short length of platforms makes them unfit to accommodate a 24-coach train.
A passenger station with a home and an island (with two faces) platform would be built at Transportnagar under the doubling and electrification of Utrethia-Alamnagar line while two island platforms will be constructed at Charbagh under the yard remodelling project.
"Transportnagar
...
more...
will be developed as a passenger station and some trains operating from Charbagh will be routed through the section to reduce congestion and make operation of trains via Charbagh faster," said A K Lahoti, divisional railway manager (DRM), Northern Railway, Lucknow.

6 posts are hidden.

  
3025 views
Dec 31 2016 (14:06)
Prakhar*^~   4166 blog posts   412 correct pred (82% accurate)
Re# 2110200-8            Tags   Past Edits
Transport Nagar lies on UTR - Alamnagar bypass line
.
So all trains running from ndls/MB side towards sln / rbl have the scope.
.
Fd / gkp / cnb bound trains have no scope.

4 posts are hidden.
  
Rail News
0 Followers
657 views
New Facilities/TechnologyNCR/North Central  -  
Dec 26 2016 (21:59)   बढ़ सकती है पांच प्लेटफार्मो की लंबाई

Prakhar*^~   220 news posts
Entry# 2106335   News Entry# 289693         Tags   Past Edits
बढ़ सकती है पांच प्लेटफार्मो की लंबाई
.
कानपुर : सेंट्रल स्टेशन के पांच प्लेटफार्मों की लंबाई जल्द बढ़ाई जा सकती है। रेलवे बोर्ड ने इसकी मंजूरी दे दी है। इस दिशा में काम करने की प्रक्रिया शुरू कर दी गई है। रेलवे सूत्र बताते हैं कि प्लेटफार्म संख्या एक से चार व दस की लंबाई कम है। जिसके कारण लंबी रेक की ट्रेनों की कुछ बोगियां प्लेटफार्म से पीछे रह जाती हैं। इस दिशा में चार-पांच माह पूर्व बोर्ड के अपर सदस्य एके गुप्ता निरीक्षण भी कर चुके हैं, जिसके बाद उन्होंने
...
more...
इस बाबत प्रस्ताव भी दिया था। जिसे मंजूर कर लिया गया है। सूत्रों का कहना है कि हाल ही प्लेटफार्म संख्या दस पर काम कराया गया है लेकिन प्लेटफार्म की लंबाई कम है।

  
1468 views
Dec 27 2016 (07:23)
Kishor*^~   4562 blog posts   123 correct pred (62% accurate)
Re# 2106335-1            Tags   Past Edits
Increase of Height is needed to up to door level. This will save accidental slip and death . When will all IR station platform see this
Page#    2138 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 2
Trains with ARP 15 Dep on: Tue Mar 7
Trains with ARP 30 Dep on: Wed Mar 22
Trains with ARP 120 Dep on: Tue Jun 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site