Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed May 24, 2017 02:29:23 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed May 24, 2017 02:29:23 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by ritzraj
Page#    462 Blog Entries  next>>
  
Rail News
0 Followers
1855 views
WR/Western  -  IR Press Release 
Dec 15 2016 (18:34)   SAYAJI NAGARI EXPRESS IS ALL SET TO DEPART FROM DADAR TERMINUS (W. Rly) W.E.F. 2nd APRIL, 2017

Jayashree   36363 news posts
Entry# 2092462   News Entry# 288719         Tags   Past Edits
click here
Western Railway has decided to shift the terminal for departure of Train No.19115/19116 Sayaji Nagari Express from Dadar Terminus (WR) station instead of Bandra Terminus, with effect from 2nd April, 2017. Accordingly, the booking for Train no. 19115/19116 for the trips from 01.04.2017 o­nwards will be opened w.e.f 16.12.2016. Similarly, the booking of Train no. 22955/22956 Kutch Express was also stopped alongwith Sayaji Nagari Express which will also be opened w.e.f. 16.12.2016. Train No.19115 which departs from Bandra Terminus at 14.50 hrs will departs from Dadar at 15.00 hrs w.e.f. 2.04.2017. Train No.19116 will terminate at Dadar at 13.45 hrs instead of Bandra Terminus w.e.f. 2.04.2017.

1 posts are hidden.

  
2537 views
Dec 30 2016 (17:48)
ritzraj   588 blog posts
Re# 2092462-2            Tags   Past Edits
Suryanagari exp or Ranakpur express should also depart from dadar instead of bdts.

  
1362 views
Mar 11 2017 (21:09)
Guest: 47f6c75a   show all posts
Re# 2092462-3            Tags   Past Edits
abhi khali ej aur terminal platform toh sayaji chahlu kiya hai woh kaafi hai sabar rakhiye aur philhaal keliye sayaji ko jaane dijiye wahaan pe
par mein bohot zyada khush iss chizz se...

2 posts are hidden.

  
526 views
May 13 2017 (18:32)
Please Inaugural Run BDTS PNBE Humsafar Exp   159 blog posts
Re# 2092462-6            Tags   Past Edits
Ab Surat Mumbai Tejas Express Shuru Hogi Dadar Se

5 posts are hidden.
  
★★★  General Travel
4 Followers
40209 views
Mar 11 2016 (16:50)   JP/Jaipur Junction (6 PFs)

Next Target 300 LHB trains^~   81658 blog posts   5226 correct pred (78% accurate)
Entry# 1763951            Tags   Past Edits
NWR Projects progress Blog
.
Sikar - Churu gauge conversion
Sikar Fatehpur CRS on 25-26March
.
Delhi
...
more...
Rewari, Alwar - Jaipur - Ajmer Electrification
593 crore, 353 routekm 780 trackkm by L&T --- Target Dec 2019
Rewari - Phulera electrification
target date of test charging with 2.2kv is march 2017
.
Jaipur Swm Electrification
163 crore sanctioned
.
Ajmer - Marwar - Rani - Palanpur electrification -- Target Feb 2018
/blog/post/1763953
Target for 2016-17 100km 2.2kv
.
Ajmer - Udaipur Electrification 294km Target Dec 2018 - Cost 315 crore
click here
Target for 2016-17 80km 2.2kv
Got 90 crore in 2016-17 and 80 crore in 2017-18
.
Jaipur Sikar gauge conversion - 107km - Target March 2018
32% earthwork complete, 37% ballast supply complete.
.
Ajmer Palanpur 358km doubling excl Moribera- Swarupganj (48km)
--> (a)Marwar Guriya Doubling 47km
Marwar - Sojat Road 21km commissioned on 12 Feb
Sojat Guriya 26km - CRS inspection completed on 7 March
.
-->(b)Bangurgram - Guriya doubling 47km ----- Tender for civil works floated (174 crore ) - Target Dec 2018
3% earthwork complete.
.
-->(c) Ajmer bangurgram doubling 47km ---- Target December 2018
Earthwork started in October 2016. completed – 40,000 cum out of total 4,50,000 cum. 21 minor bridge completed out of 63
.
-->(d) Marwar Rani 52km doubling 335 crore - started in Jan 2016
25% progress - 76% earthwork completed, 33 minor bride of 36 completed, 18% ballast supply complete
.
-->(e) Mori Bera - Jawai Bandh - Falna - Khimel - Rani 40km
Executed by #RVNL . Track welding started. Target is March 2017
.
-->(f) Karjoda palanpur 9km target is feb 2017
.
-->(g) Swarupganj - Bhimana - Abu Rd - Sarotra Rd - Karjoda 72km
executed by #rvnl
SwarupGanj - Bhimana 9km CRS completed on 11 March 2017
.
Dausa - deedwana - gangapur city new line ( 70% complete )
(a)Dausa - deedwana completed
(b) Deedwana gangapur city
earthwork complete, major bridge complete, tunnel is getting constructed.
work stopped in july 2015.
.
Phulera Degana doubling ( 673 crore )
Detailed Estimate of Rs. 673.17 cr. sanctioned by Railway Board vide No. 2015/WI/NWR/DL/DPR 2015-16/18 dt. 28.01.2016.
EPC tender planning is in progress
Target Jan 2019
.
Alwar Bandikui Doubling ( Total cost 280 crore )
target October 2018
40% minorbridge, 66% earthwork, 42% ballast supply completed.
.
Ajmer Sawai Madhopur ( Nasirabad - Chauth ka Barwara ) new line ( 873 crore ) - 165km
Fls work started wef 28.3.2016
.
Mavli Barisadri Gauge conversion ( 82km) - Work started in Nov 2016
11% earthwork complete.
.
Marwar Mavli Gauge conversion - 1600 crore - 152km - Waiting for #CCEA approval
.
Pushkar Merta new line - ( 323 crore ) - Waiting for #CCEA approval
.
Ajmer-Kota (Nasirabad-Jalindri) (145 km) - ( 822 crore ) Waiting for #CCEA approval
.
Himmatnagar - Udaipur gauge conversion 208km
68% earthwork completed 49% minor bridges completed, 69% major bridges completed, 47% concreting completed
.
ratlam dungarpur new line 189km
22 %earthwork completed , 8 out of 414 minor bridges completed.
.
Thaiyat Hamira - Sanu New Line 59km
41% earthwork, 22% concreting, 22% minor bridge, 1% ballast supply completed.
Target April 2018
.
Phulera Ateli section of WDFC - Target Date March 2018 ....

81 posts - Aug 2016

2 posts - Tue Nov 15, 2016

  
2391 views
Nov 16 2016 (09:23)
saini100mohit   108 blog posts
Re# 1763951-84            Tags   Past Edits
Koi image hai electrification se related toh post kijiye

31 posts are hidden.

  
3282 views
Mar 17 2017 (18:06)
ritzraj   588 blog posts
Re# 1763951-117            Tags   Past Edits
Tried attaching video through app but "choose files" link not working. Can anyone suggest how to do it on mobile app

4 posts are hidden.

  
1462 views
May 05 2017 (16:19)
ritzraj   588 blog posts
Re# 1763951-125            Tags   Past Edits
no update about fulera- degana- raikabagh doubling,
also no update about marwar jn-mavli GC

  
1430 views
May 05 2017 (16:30)
Next Target 300 LHB trains^~   81658 blog posts   5226 correct pred (78% accurate)
Re# 1763951-126            Tags   Past Edits
Phulera Degana document work in progress...
RFQ accepted. RFP finalization in process
It may start soon
.
Marwar Mavli waiting for ccea.

  
1432 views
May 05 2017 (16:36)
Next Target 300 LHB trains^~   81658 blog posts   5226 correct pred (78% accurate)
Re# 1763951-127            Tags   Past Edits
Phulera Degana complete jaldi Hoga kyuki EPC project Hai aur RVNL nahi kerega .
RVNL kerta to 10 saal leta...
Iski Monitoring NWR kerega so it will not take as much time as ahemdabad Ajmer doubling
  
General Travel
0 Followers
2180 views
Mar 20 2017 (20:32)   09011/Mumbai Bandra Terminus - Bikaner Special Fare Special

Next Target 300 LHB trains^~   81658 blog posts   5226 correct pred (78% accurate)
Entry# 2204389            Tags   Past Edits
slot of humsafar.

  
1853 views
Mar 22 2017 (19:06)
ritzraj   588 blog posts
Re# 2204389-1            Tags   Past Edits
really bad slot for pax of jodhpur arriving at 4 am.
however bkn-bdts is in the slot of bgkt-bdts from jodhpur. this slot is also not good.
they could have taken the slot of ju-bct lhb special which arrived at bvt at around 6:15 am in the morning.
I think this will be a flop, until and unless there is big a holiday rush.

  
1866 views
Mar 22 2017 (19:13)
Next Target 300 LHB trains^~   81658 blog posts   5226 correct pred (78% accurate)
Re# 2204389-2            Tags   Past Edits
4am is fine
Morning slot is fully congested especially Luni Marwar single line no slot.

  
1667 views
Mar 23 2017 (21:08)
ritzraj   588 blog posts
Re# 2204389-3            Tags   Past Edits
all the train from bdts are departing in afternoon before 3 pm for ju and bkn. Ideally they should have given a new evening-late eveinig slot to this special fare train from bdts

  
1121 views
Apr 13 2017 (19:03)
Next Target 300 LHB trains^~   81658 blog posts   5226 correct pred (78% accurate)
Re# 2204389-4            Tags   Past Edits
this train is running with lhb.... thanks to wr for providing lhb.

  
891 views
Apr 18 2017 (02:25)
Udit Mehta~   956 blog posts   113 correct pred (58% accurate)
Re# 2204389-5            Tags   Past Edits
Ranakpur se toh aacha hi hai sab . Tt , run , maintaining and all
  
General Travel
0 Followers
2386 views
Mar 18 2017 (20:47)   54811/Bhopal - Jodhpur Passenger | BPL/Bhopal Junction (6 PFs)

Next Target 300 LHB trains^~   81658 blog posts   5226 correct pred (78% accurate)
Entry# 2202223            Tags   Past Edits
Now Express
#TAAG2017

1 posts are hidden.

  
1943 views
Mar 22 2017 (19:32)
ritzraj   588 blog posts
Re# 2202223-2            Tags   Past Edits
i think overall, it is a good decision. what is avg speed now between ju and bhopal?

  
1876 views
Mar 22 2017 (20:56)
12988 अजमेर सियालदह सुपरफास्ट एक्सप्रेस^~   4710 blog posts   298 correct pred (52% accurate)
Re# 2202223-3            Tags   Past Edits
Abhi to is train ka Avg Speed: 35 km/hr hai.

  
893 views
Apr 15 2017 (11:01)
Next Target 300 LHB trains^~   81658 blog posts   5226 correct pred (78% accurate)
Re# 2202223-4            Tags   Past Edits
One sad news is that now it will lose the crown of being the longest passenger train in India.
  
General Travel
0 Followers
1470 views
Mar 26 2017 (11:13)   12479/Suryanagari SF Express (PT)

ritzraj   588 blog posts
Entry# 2211188            Tags   Past Edits
Today running late by half an hour just like last Sunday. Halted at virar for 10 min just like last Sunday. Big coincidence

  
1463 views
Mar 26 2017 (11:14)
Next Target 300 LHB trains^~   81658 blog posts   5226 correct pred (78% accurate)
Re# 2211188-1            Tags   Past Edits
Ntes to fake update bhi Deta Hai Mumbai area m
  
General Travel
0 Followers
2320 views
Mar 17 2017 (17:34)   12480/Suryanagari SF Express (PT)

ritzraj   588 blog posts
Entry# 2200850            Tags   Past Edits
Travelling today to jodhpur. Stopped at vedcha station for 15 minutes to give way to one rajdhani, don't know which one. Still reached surat 3 min before time. No need to stop a sf train which has no halt between bvi and St. Instead it should be speed up by 15 min

1 posts - Fri Mar 17, 2017

  
2016 views
Mar 17 2017 (17:44)
ritzraj   588 blog posts
Re# 2200850-2            Tags   Past Edits
Okay. I think this could be avoided if this train is speed up by 20 min at st

  
1924 views
Mar 18 2017 (09:37)
NEW DAWN IR   45 blog posts
Re# 2200850-3            Tags   Past Edits
Duronto reaches Vadodara at 18:40 so anyways it will overtake Suryanagri...

  
1715 views
Mar 23 2017 (21:15)
ritzraj   588 blog posts
Re# 2200850-4            Tags   Past Edits
I have one suggestion. all those trains where premium tatkal quota is there should be converted to LHB and given importance equivalent to duronto/shatabdi. Hence no duronto/shatabdi should overtake such trains until and unless there is additional stoppage in between. Till the time this is done, premium tatkal quota should be abolished from such trains

  
1560 views
Mar 23 2017 (22:26)
ranjitg370   2423 blog posts   1141 correct pred (74% accurate)
Re# 2200850-5            Tags   Past Edits
Suryanagari SF express is best in punctuality always reach on time

  
1550 views
Mar 23 2017 (22:30)
ranjitg370   2423 blog posts   1141 correct pred (74% accurate)
Re# 2200850-6            Tags   Past Edits
Mostly all WR trains is best in punctuality. Suryanagari SF is NWR trains it run most in WR route
  
Rail News
0 Followers
1504 views
NWR/North Western  -  
Mar 18 2017 (12:55)   भोपाल पैसेंजर में किराया जोधपुर से बढ़ेगा, स्पीड सवाई माधोपुर से

riz339~   124 news posts
Entry# 2201783   News Entry# 296734         Tags   Past Edits
भोपाल पैसेंजर में किराया जोधपुर से बढ़ेगा, स्पीड सवाई माधोपुर से
bhaskar news | Mar 18,2017 05:07 IST
प्रतीकात्मक तस्वीर
जोधपुर. जोधपुर से भोपाल जाने वाली पैसेंजर ट्रेन 12 जुलाई से एक्सप्रेस हो जाएगी। रेलवे इस ट्रेन के नंबर भी बदलेगा। किराया भी एक्सप्रेस ट्रेन का लगेगा, लेकिन जोधपुर से सवाई माधोपुर तक पैसेंजर ट्रेन की तरह ही चलेगी। ऐसे में यात्रियों को अब
...
more...
सवाई माधोपुर तक पहले वाले समय तक सफर करने के बावजूद ज्यादा किराया देना होगा।

रेलवे प्रशासन का कहना है कि उनका यह फैसला यात्रियों के हित में लिया गया है। जोधपुर से चलने वाली भोपाल पैसेंजर ट्रेन संख्या 54811 अब नए नंबर 14813 से सुबह 8:05 बजे रवाना होकर अगले दिन सुबह 9:10 बजे भोपाल पहुंचेगी। वापसी में भोपाल से आने वाली ट्रेन का नंबर 54812 की जगह 14814 हो जाएगा और यह वहां से शाम 5:25 बजे चलकर अगले दिन रात 8:20 बजे जोधपुर आएगी।

रेलवे प्रवक्ता ने बताया कि जोधपुर से सवाई माधोपुर के बीच ट्रेन के समय और ठहराव में कोई बदलाव नहीं होगा। सवाई माधोपुर भोपाल के बीच आठ ठहराव कम किए गए हैं। ऐसे में अब यह ट्रेन जोधपुर से भोपाल के बीच 26.45 घंटे की जगह 25.05 घंटे में सफर तय करेगी। वापसी में 1.15 घंटे का सफर कम होगा। ट्रेन के जोधपुर से सवाई माधोपुर के बीच पैसेंजर की तरह ही चलने के बावजूद यात्रियों को एक्सप्रेस का किराया देना होगा। स्लीपर क्लास में 40 से 90 और सैकंड सीटिंग में 25 से 65 रुपए किराया बढ़ जाएगा। जोधपुर से भोपाल के सफर में 1:40 मिनट का सफर कम होगा लेकिन स्लीपर क्लास का टिकट 155 सैकंड सीटिंग का 105 रुपए महंगा हो जाएगा।

स्टेशन स्लीपर सेकंड क्लास
पहले अब पहले अब
मेड़तारोड100 140 40 65
डेगाना 100 140 50 80
मकराना 100 140 60 90
जयपुर 140 210 25 75
सवाई माधोपुर 170 260 95 160

7 posts are hidden.

  
575 views
Mar 22 2017 (19:45)
ritzraj   588 blog posts
Re# 2201783-8            Tags   Past Edits
avg. speed is pathetic for an express train. IR needs to redefine the avg. speeds if it wants to grow and become truly passenger friendly

  
1633 views
Mar 23 2017 (13:47)
a2z~   805 blog posts
Re# 2201783-9            Tags   Past Edits
This train is a passenger train and shall be a passenger train even after the so called upgradation. Not only the avg speed, the number of stops confirms this statement. For an express train atleast 20km per stop should be avg distance and avg. speed should be 45kmph+ (except for hilly/tough BG terrains and MG/ NG trains.
This move is probably intended to increase revenue or indirectly increase fare.
  
Rail News
0 Followers
735 views
NWR/North Western  -  
Mar 18 2017 (13:01)   वागड़ की रेल के लिए बजट जारी करे वसुंधरा सरकार : भगोरा

riz339~   124 news posts
Entry# 2206895   News Entry# 296735         Tags   Past Edits
डूंगरपुर। पूर्वसांसद और कांग्रेस के राष्ट्रीय सचिव ताराचंद भगोरा ने भाजपा सरकार पर वागड़ के विकास को रोकने का आरोप लगाते हुए डूंगरपुर बांसवाड़ा रतलाम रेल परियोजना के लिए राशि आवंटित करने की मांग की है। भगोरा ने कहा कि वसुंधरा सरकार जल्द से जल्द रेल परियोजना का शुरू करें।
उन्होंने कहा कि राज्य में भाजपा सरकार आने के साथ ही यह रेल परियोजना रुक गई है। भूमि अवाप्ति के लिए करीब डेढ़ सौ करोड़ रुपए की आवश्यकता है लेकिन भाजपा सरकार यह राशि नहीं दे रही है। कांग्रेस राज में डूंगरपुर बांसवाड़ा रतलाम प्रोजेक्ट की शुरूआत हुई और राशि भी खर्च हुई। 0 से 17 किमी. तक का काम शुरू हुआ लेकिन भाजपा के राज में आने के बाद यह
...
more...
काम बंद हो गया। इस बजट से भी उम्मीद थी कि इस प्रोजेक्ट के लिए राशि मिलेगी लेकिन यहां के जनप्रतिनिधियों की अनदेखी के चलते डेढ़ सौ करोड़ रुपए की राशि नहीं मिल रही है।
भाजपा के विधायक और सांसद इस प्रोजेक्ट को शुरू कराने में कोई रूचि नहीं दिखा रहे हैं। खामियाजा वागड़ की जनता को भुगतना पड़ रहा है।

  
689 views
Mar 22 2017 (19:42)
ritzraj   588 blog posts
Re# 2206895-1            Tags   Past Edits
I think any state govt. should give highest priority to rail infra projects for the overall development of the state

1 posts are hidden.
  
Rail News
0 Followers
414 views
Commentary/Human InterestNWR/North Western  -  
Mar 21 2017 (20:54)   Security beefed up at Jodhpur railway station following IS letter

rdb*^   129287 news posts
Entry# 2206892   News Entry# 297076         Tags   Past Edits
Jodhpur: Security has been beefed up at Jodhpur railway station following a letter allegedly by IS threatening to blow up Dholpur railway station. An alert was issued in Jodhpur after which GRP sprang into action.Every nuke and corner of the station premises was searched minutely and all arriving trains were examined with sniffer dogs to find out any suspicious material.SP (GRP) Lalit Maheshwari said though there was no specific threat for Jodhpur railway station but an alert has been issued as a precautionary measure.He said GRP has been keeping a close eye on every movement on the railway station as well as keeping a check on all arriving and departing trains.Police have been checking passengers and luggage at the station using the dog squad. Besides, persons at the station with no specific purpose are being asked to leave after checking and baggers have been cleared from the station."We have also appealed...
more...
to passengers to report any suspicious object or movements in or around the station immediately so that timely action can be taken in order to ward off any threat," said Maheshwari.GRP personnel deployed other stations under Jodhpur Division have also been directed to be alert and step up surveillance for any suspicious activity.

  
538 views
Mar 22 2017 (19:38)
ritzraj   588 blog posts
Re# 2206892-1            Tags   Past Edits
travelled from jodhpur on last saturday evening from suryanagari, the scanner for bags was not working on the second entry gate. I doubt how the security is being beefed up.
  
General Travel
0 Followers
3187 views
Feb 13 2017 (20:27)   MJ/Marwar Junction (4 PFs)

Next Target 300 LHB trains^~   81658 blog posts   5226 correct pred (78% accurate)
Entry# 2163314            Tags   Past Edits
Will #NWR be able to complete Marwar - Abu Road doubling this year 2017-18 ?

3 posts are hidden.

  
558 views
Mar 17 2017 (18:52)
ritzraj   588 blog posts
Re# 2163314-5            Tags   Past Edits
No way, lot of work pen in MJ rani section

  
692 views
Mar 17 2017 (18:54)
Next Target 300 LHB trains^~   81658 blog posts   5226 correct pred (78% accurate)
Re# 2163314-6            Tags   Past Edits
Let's see....NWR told me that they will complete it this year.

4 posts are hidden.

  
1391 views
Mar 22 2017 (18:44)
ritzraj   588 blog posts
Re# 2163314-11            Tags   Past Edits
when they say march, it means june, as simple as that
Page#    462 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Jun 3
Trains with ARP 15 Dep on: Thu Jun 8
Trains with ARP 30 Dep on: Fri Jun 23
Trains with ARP 120 Dep on: Thu Sep 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site