Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Jan 23, 2017 08:06:59 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Jan 23, 2017 08:06:59 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by pslkumar
Page#    242 Blog Entries  next>>
  
★  General Travel
1 Followers
4349 views
Dec 26 2016 (22:37)   22707/Visakhapatnam - Tirupati AC Double Decker Express

Venkat వెంకట్   1632 blog posts
Entry# 2106156            Tags   Past Edits
BZA - TEL 1 hr 45 min ? Its normally 35-40 min, clear wastage of 1 hrs. VSKP-OGL/NLR passengers might have taken this as a better over night with less time.
ANy ways still a better option, but for a CC train long route is cruel that to in night.

212 posts are hidden.

  
193 views
Dec 27 2016 (15:14)
pslkumar   322 blog posts
Re# 2106156-213            Tags   Past Edits
I think its better to avoid diverting any train via ngnt until doubling is completed btn tel-gnt. also better to run dd as day train instead o/n.

  
200 views
Dec 27 2016 (15:15)
Koilakuntla in IR~   7725 blog posts   7 correct pred (63% accurate)
Re# 2106156-214            Tags   Past Edits
Good its beter to avaoid train via New guntur....
also please request SCR to start a new trains from Guntur - Tpty/SBC which is requested by Gnt div
As SCr has a plan to run BZA-VSKP Uday so planned to run DD which dont coincide with Uday timings and crowd

  
185 views
Dec 27 2016 (15:17)
Venkat వెంకట్   1632 blog posts
Re# 2106156-215            Tags   Past Edits
yes thats true.

  
188 views
Dec 27 2016 (15:18)
SLA   967 blog posts
Re# 2106156-216            Tags   Past Edits
Restoration of TSR - VJA line would be a good option too... If done, some trains, which don't have a stop at TEL can be diverted via NGNT.

102 posts are hidden.
  
General Travel
0 Followers
1394 views
Dec 12 2016 (15:56)   17023/Tungabhadra Express

Naveen Golla   265 blog posts
Entry# 2088731            Tags   Past Edits
We request for extending tungabadra express train till to dharvad. Also for rake sharing they can use janasadharan spl train which swr has introduced running inbetween dharvad to bellary as this train can rename as tungabadra and can extend upto secunderabad.this will not disturb existing train timings which currently running but this will give connectivity.for kurnool and bellary in daytime.
So please vote for it looking for best as this will hit rock star train inthis route.

1 posts are hidden.

  
971 views
Dec 17 2016 (14:01)
pslkumar   322 blog posts
Re# 2088731-2            Tags   Past Edits
it'll be good to see the train passing through tb dam @hospet if it extended and train can run with both second sitting & sleeper class coaches (krishna exp model). Also its better to revive old vijaya nagar exp used to run btn gtl-vasco on mg track.

  
841 views
Dec 18 2016 (17:33)
Naveen Golla   265 blog posts
Re# 2088731-3            Tags   Past Edits
Vijayanagara expess?

  
752 views
Dec 18 2016 (22:34)
pslkumar   322 blog posts
Re# 2088731-4            Tags   Past Edits
yes

  
Dec 22 2016 (08:58)
Naveen Golla   265 blog posts
Re# 2088731-5            Tags   Past Edits
Earlier i have seen this vijayanagar express which the first train was intrduced after guage conversion between gtl and hubli.this train used to start at 9 30 am in gtl to hubli,later dont know the reason why it got terminated.
But if scr and swr with sr if they think then it can be introduced starting from pudicherry to kolhapur as oneslip and another slip should be goa.
If this works then this will be blockbuster train.
  
★  General Travel
1 Followers
2811 views
Dec 15 2016 (14:41)   GTL/Guntakal Junction (6 PFs)

karim1237890   48 blog posts
Entry# 2091643            Tags   Past Edits
Hi friends..Check Guntakal to kalluru via khadarpet double line importance which is attached to wall in Gtl junction

  
1171 views
Dec 17 2016 (15:49)
pslkumar   322 blog posts
Re# 2091643-1            Tags   Past Edits
agreed, i think 3 years period is very long time for 41 km.

  
777 views
Dec 21 2016 (19:20)
Vishnu Datta Jacke   107 blog posts
Re# 2091643-2            Tags   Past Edits
both works !! eletrfication included

7 posts are hidden.
TRIP HAS ENDED.
Blog  Time-Table

73 posts are hidden. Click to open.

  
732 views
Dec 17 2016 (23:35)
pslkumar   322 blog posts
Re# 2091156-74            Tags   Past Edits
i'd same experience, looks like some thing is stopping this train to run on-time btn ru-bza with unofficial stops at bpp,apl,ndo and allowing other trains to cross this train. so people have doubts and some are going back to travels to save their weekend time. Refer my post /blog/post/2071956 on the same.

11 posts are hidden. Click to open.
  
Rail News
0 Followers
361 views
Commentary/Human InterestSCR/South Central  -  
Dec 14 2016 (15:50)   Develop dumping yardsite into park: CPI(M); line from Kurnool to the State capital

rdb*^   124962 news posts
Entry# 2091872   News Entry# 288617         Tags   Past Edits
KURNOOL: CPI(M) leaders on Tuesday sought construction of a mega park on the lines of NTR gardens on the 28-acre stretch of dumping yard site at Joharapuram in Kurnool.
“There is hardly any noteworthy park in Kurnool town where people can spend with their family members and most smaller parks have disappeared due to encroachment,” CPI(M) leader T. Ramesh Kumar said during the party’s ‘Poruyatra’ at Joharapuram.
The dumping yard site would also be encroached upon by vested interests if it was not developed into a mega park, he feared. The party had
...
more...
obstructed moves of the ruling party to allot the site for housing to municipal corporators in the past, Mr. Ramesh Kumar recalled.
Party city secretary D. Ghouse Desai and leaders Radhakrishna and Anji Babu urged the State government to fulfil the promises made by Chief Minister N. Chandrababu Naidu during his Independence Day address in Kurnool in 2014. The promise to establish industries to generate employment to youth remained unfulfilled, they alleged.
They sought construction of an additional summer storage tank and build flyovers in Kurnool to meet the needs of the growing population. The party leaders wanted a railway line from Kurnool to the State capital Amaravati.
Party leaders Ramudu, Nagaraju, Narasimhulu, Ramakrishna, Venkateswarlu, Rangaswamy, Abdul Desai, Rajaka Sangham leader Gurusekhar, Praja Natya Mandali leaders Nagaswamy, Maddileti, Bazari and Balaiah took part in the ‘poruyatra’.

  
467 views
Dec 15 2016 (17:44)
pslkumar   322 blog posts
Re# 2091872-1            Tags   Past Edits
not only Kurnool, there are no noteworthy parks in other major towns as well. govt need to develop parks on par with tirumala, b'lore..etc
  
Rail News
0 Followers
1839 views
New/Special TrainsSWR/South Western  -  
Dec 03 2016 (08:29)   Yesvantpur - Vizag train has to run daily

WAP7   11 news posts
Entry# 2078894   News Entry# 287514         Tags   Past Edits
ఈనాడు-అమరావతి:బెంగళూరు(యశ్వంత్‌పూర్‌)- విశాఖపట్నం మధ్య రెండు నెలల కిందట ప్రవేశపెట్టిన వీక్లీ ఎక్స్‌ప్రెస్‌ను రోజువారీ రైలుగా మార్చాలని కేంద్ర పట్టణాభివృద్ధి శాఖ మంత్రి ఎం.వెంకయ్యనాయుడు కోరారు. ఈ మేరకు రైల్వే మంత్రి సురేష్‌ప్రభుకు లేఖ రాశారు. దీనిపై రైల్వేబోర్డు, నైరుతి (సౌత్‌వెస్ట్రర్న్‌ జోన్‌) రైల్వే అధికారులు వెనువెంటనే స్పందించారు. బెంగళూరు నుంచి విశాఖపట్నం వరకు నడుపుతున్న వీక్లీ (స్పెషల్‌) ఎక్స్‌ప్రెస్‌ రైలుకు ప్రయాణికుల రద్దీ ఎక్కువగా ఉందని, దీని రెగ్యులర్‌ కోసం రైల్వే బోర్డుకు సిఫారసు చేయాలని కర్ణాటకలోని హుబ్బళ్లి కేంద్రంగా ఉన్న నైరుతి రైల్వేజోన్‌ నిర్ణయించింది. ఈ మేరకు బోర్డుకు సోమవారం నివేదించినట్లు విశ్వసనీయంగా తెలిసింది. ఈ ప్రత్యేక రైలు విషయంలో మొదటినుంచి ఆటంకాలు కల్పిస్తున్న ఈస్ట్‌కోస్ట్‌ రైల్వేజోన్‌.. విశాఖ నుంచి తిరుగు ప్రయాణంలో డైనమిక్‌ ఛార్జీలతో ప్రయాణికులపై భారం మోపుతోంది. విశాఖ నుంచి బెంగళూరుకు నిత్యం నాలుగు విమానాలు ఉండటం, ఇదే సమయంలో రైలు ప్రయాణికుల సమస్యలను గుర్తించిన వెంకయ్య బెంగళూరు-విశాఖ ప్రత్యేక రైలుపై స్పందించి ప్రతిరోజూ నడపాలని సురేష్‌ప్రభుకు లేఖ రాశారు.

6 posts are hidden.

  
929 views
Dec 03 2016 (14:10)
pslkumar   322 blog posts
Re# 2078894-7            Tags   Past Edits
Good News!

6 posts are hidden.
  
General Travel
0 Followers
2478 views
Nov 26 2016 (13:53)   06579/Yesvantpur - Visakhapatnam Tatkal Fare Special

pslkumar   322 blog posts
Entry# 2071956            Tags   Past Edits
Today me and many passengers had horrible experience with this train. Grievance submitted for the same @W/SC/BZA/000171046.

10 posts - Sat Nov 26, 2016

11 posts are hidden.

  
534 views
Nov 28 2016 (11:00)
Srikanth~   1521 blog posts   527 correct pred (71% accurate)
Re# 2071956-12            Tags   Past Edits
There is an issue at BPP. Even YPR - HWH has been stopped at TEL for 45 mins due to some reason even though it OT your train.

  
Nov 28 2016 (17:13)
pslkumar   322 blog posts
Re# 2071956-13            Tags   Past Edits
Thanks for the info. Anyhow, return journey in 82664 was peaceful and train reached on time @kjm.

  
1056 views
Nov 28 2016 (17:19)
Venkat వెంకట్   1632 blog posts
Re# 2071956-14            Tags   Past Edits
what time it reached TEL from YPR ?

  
1074 views
Nov 28 2016 (17:19)
Boxer Bhai   37280 blog posts   12620 correct pred (61% accurate)
Re# 2071956-15            Tags   Past Edits
Oh reached on time at kjm good ont

2 posts are hidden.

  
878 views
Dec 01 2016 (23:19)
pslkumar   322 blog posts
Re# 2071956-18            Tags   Past Edits
Here is the response from SCR for the complaint W/SC/BZA/000171046
click here
  
Rail News
0 Followers
1664 views
New/Special Trains
Dec 01 2016 (17:02)   విశాఖ-విజయవాడల మధ్య రెండంతస్తుల రైలు

pslkumar   20 news posts
Entry# 2077197   News Entry# 287354         Tags   Past Edits
విశాఖ-విజయవాడల మధ్య రెండంతస్తుల రైలు
కొత్త బోగీలతో త్వరలో ప్రవేశపెడతాం: సురేష్‌ ప్రభు
అమరావతి: ఆంధ్రప్రదేశ్‌లోని రెండు ప్రధాన నగరాలు విశాఖపట్నం-విజయవాడల మధ్య త్వరలో రెండంతస్తుల (డబుల్‌ డెక్కర్‌) రైలు పట్టాలు ఎక్కనుంది. కొత్త బోగీలతో ఈ రైలును ప్రవేశపెడతామని రైల్వేశాఖ మంత్రి సురేష్‌ప్రభు తెలిపారు. భాజపా ఏపీ అధ్యక్షుడు, విశాఖపట్నం ఎంపీ కంభంపాటి హరిబాబు రైల్వేమంత్రిని బుధవారం దిల్లీలో కలిశారు. రాష్ట్రంలో రైల్వే ప్రాజెక్టులు, రైళ్లకు సంబంధించిన పలు అంశాలను సురేశ్‌ ప్రభు దృష్టికి హరిబాబు తీసుకెళ్లారు. చెన్నై-కోల్‌కతా ప్రధాన రైల్వేలైన్‌లో సామర్లకోట-విజయవాడ-ఒంగోలుకు ప్రత్యామ్నాయ రైలు మార్గం ప్రాధాన్యం, పోర్టుల అనుసంధానం గురించి వివరించారు. కోటిపల్లి-నర్సాపూర్‌ మీదుగా మచిలీపట్నం-నిజాంపట్నం-రేపల్లే-బాపట్ల దగ్గర ప్రధానలైన్‌లో కలిసేలా ప్రత్యామ్నాయ రైలు మార్గానికి సర్వేకోసం వచ్చే బడ్జెట్‌లో నిధులు మంజూరుచేయాలని కోరగా.. సురేష్‌ప్రభు సానుకూలంగా స్పందించినట్లు సమాచారం. అరకు ప్రాంతానికి అద్దాల
...
more...
రైలును మంజూరుచేశామని, ఐఆర్‌సీటీసీ ద్వారా త్వరలోనే ఆ రైలు ప్రయాణికులకు అందుబాటులోకి వస్తుందని సురేశ్‌ప్రభు తెలిపారు. రాష్ట్రంలో 16వ నెంబరు జాతీయ రహదారి, రాయలసీమ ప్రాంతం మీదుగా వెళ్లే జాతీయరహదారుల్లో రెండు ట్రామాకేర్‌ సెంటర్ల ఏర్పాటుకు ఎంపీ లాడ్స్‌ నుంచి నిధులు ఇస్తానని.. రాష్ట్రం నుంచి ప్రతిపాదనలు పంపాలని సురేష్‌ప్రభు సూచించారు.

  
1036 views
Dec 01 2016 (17:25)
Mangalagiri   322 blog posts
Re# 2077197-1            Tags   Past Edits
DD kaadu Zone Kavali

2 posts are hidden.

  
1839 views
Dec 01 2016 (17:54)
Venkat వెంకట్   1632 blog posts
Re# 2077197-4            Tags   Past Edits
so uday istha ani vuntaadu suresh ji

5 posts are hidden.

  
2031 views
Dec 01 2016 (18:32)
Djoko out~   1815 blog posts   683 correct pred (70% accurate)
Re# 2077197-10            Tags   Past Edits
Sir, can u please translate to English. Thanks.

  
1568 views
Dec 01 2016 (23:14)
pslkumar   322 blog posts
Re# 2077197-11            Tags   Past Edits
here is the link for English version of same news..
click here
  
Rail News
0 Followers
519 views
Commentary/Human InterestHM/Hyderabad Metro  -  
Dec 01 2016 (06:51)   Full support to Metro Rail for early completion: CM

rdb*^   124962 news posts
Entry# 2077159   News Entry# 287304         Tags   Past Edits
KCR has a meeting with officials at his camp office
Chief Minister K. Chandrasekhar Rao on Wednesday promised complete support of the Government to the L&T Metro Rail Hyderabad (L&TMRH) in early completion of the project construction under way across three traffic corridors in the twin cities.
Discussion on the project
Mr. Rao had a detailed discussion on the progress of the project at
...
more...
his camp office in the presence of L&T Deputy MD, Metro Rail non-executive Chairman S.N. Subrahmanyam, L&TMRH MD Shivanand Nimbargi, Hyderabad Metro Rail MD N.V.S. Reddy and CM’s Principal Secretary S. Narsing Rao.
Metro Rail authorities informed him that the works on Corridor One --Miyapur to L.B. Nagar -- would be completed within a year, that is, November 2017, and work on all the three corridors (Corridor Two - Jubilee Bus Station to Falaknuma and Corridor Three - Nagole to Hi-Tec City/Raidurg) would be done by August 2018.
The scheduled completion of the project as per the Concession Agreement is July 2017 as the actual month when the work started was July 2012.
Trial runs are currently running in Stage one - Nagole to Mettuguda, an 8-km stretch on Corridor One and also for stage two - Miyapur to S.R. Nagar, a 12-km stretch.
About 17 stations are ready in stages one and two while work at three interchange stations - Ameerpet, MGBS & Parade Grounds as well as 30 stations was in progress. Altogether 75 per cent of the project was done, with viaduct foundations: 61.20 km; piers: 58.10 km; span erection: 49.0 km and track work: 36.25 km, Metro Rail officials said.
“L&T is committed to completing the project and I thank the CM and the Government for their continued support and cooperation in ensuring removal of roadblocks for the rapid progress of project.
We are in discussion with the Government to commission certain stages of the project soon,” said Mr. Subrahmanyam, in a press statement later.

  
757 views
Dec 01 2016 (16:59)
pslkumar   322 blog posts
Re# 2077159-1            Tags   Past Edits
why the delay in opening completed stretches Nagole to Mettuguda and Miyapur to S.R. Nagar to public?

  
718 views
Dec 01 2016 (17:12)
Venkat వెంకట్   1632 blog posts
Re# 2077159-2            Tags   Past Edits
seems some works still pending. Also 6 months required for CRS approval
  
Imaginary
0 Followers
1306 views
016
Nov 16 2016 (17:17)   IMG89106/♥♥Vijayawada - Kurnool express♥♥

DONT TRUST INDIAN RAILWAYS   104 img trains   29 popular
351 green flags   2 red flags   4 green per Train
Entry# 2062145            Tags   Past Edits
Kindly give your flags for this train

11 posts are hidden.

  
475 views
Nov 19 2016 (13:45)
pslkumar   322 blog posts
Re# 2062145-12            Tags   Past Edits
hope this train will be introduced soon and it is required. a new line btn ndl-krnt would avoid loco reversal.

  
457 views
Nov 22 2016 (16:47)
✿ఛుక్ 🚃 ఛుక్ 🚃 రైలు✿~   3893 blog posts   149 correct pred (70% accurate)
Re# 2062145-13            Tags   Past Edits
There is a proposal for Ndl - Krnt line but it takes time
Page#    242 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Feb 2
Trains with ARP 15 Dep on: Tue Feb 7
Trains with ARP 30 Dep on: Wed Feb 22
Trains with ARP 120 Dep on: Tue May 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2136570
    Today (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
  • Entry# 2126247
    Jan 13 (11:57PM)


    Here are some guidelines for members regarding the new Report button and the revamped FM system: 1. If you have ANY complaint about a blog or ANY other issues, please USE the Report button and file a Complaint. Most complaints are resolved by FMs within seconds/minutes. (Some require further discussion). FMs have...
  • Entry# 2125399
    Jan 13 (08:58AM)


    Often we have some TL Entries seemingly in WaitList forever. Usually, the reason for this is that TLMs have already looked at the TL Entry but are not confident enough to Confirm it or are looking for more inputs from the Member regarding the source, etc. And this delay eventually causes...
  • Entry# 2122843
    Jan 10 (10:15PM)


    This is to address persistent and lingering questions about FM Appointments: . 1. Being an FM is a service. It is NOT supposed to be some kind of "reward" or "medal" to "deserving" members. The ULTIMATE OBJECTIVE of the process is to promptly handle/look into Reports filed by members, which is expected to...
Scroll to Top
Scroll to Bottom


Go to Mobile site