Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Mar 27, 2017 12:29:35 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Mar 27, 2017 12:29:35 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by 2017Year of hopes for JBP~
Page#    1435 Blog Entries  next>>
  
★★  Info Update
0 Followers
1373 views
Mar 24 2017 (09:29)   SOY/Sukrimangela (2 PFs)

2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Entry# 2208786            Tags   Past Edits
#jbpnews
#SOYGHANSORENEWBGCRS
#SOYGHANSORENEWLINESTARTAPRIL1
#JBPNIRGBGUPDATES
जबलपुर ब्राॅडगेज में परिवर्तित जबलपुर से घंसौर के बीच एक अप्रैल से ट्रेन दौड़ने लगेगी। ट्रेन चलाने के िलए सुरक्षा आयुक्त सुशील चंद्रा ने गुरुवार को
...
more...
100 किलोमीटर की रफ्तार से स्पेशल ट्रेन दौड़ाकर नए ट्रैक की सुरक्षा जांच की। उन्होेंने सुकरी से लेकर घंसौर तक के 35 किलोमीटर के ट्रैक पर न केवल तेज गति बल्कि धीमी गति से भी स्पेशल ट्रेन के जरिये परीक्षण किया। इस दौरान वे सुकरी से सबसे पहले शिकारा स्टेशन जाकर रुके और फिर बिनैकी और घंसौर स्टेशन पहुंचे। सीआरएस श्री चंद्रा के साथ नागपुर के डीआरएम अमित अग्रवाल के अलावा पमरे के अधिकारी भी थे। उन्होंने स्टेशनों पर कमियों को नजरअंदाज न करने की बात कही। उनका कहना था कि जल्द से जल्द निर्माण की कमियों को दूर किया जाए, ताकि इस मार्ग पर नियमित रूप से ट्रेनों का परिचालन हो सके। जबलपुर से सुकरी तक के 45 किलोमीटर तक पिछले साल 18 अगस्त को पैसेंजर ट्रेन का परिचालन शुरू हुअा था और उसके बाद से ही यह कहा जा रहा था कि सुकरी से घंसौर तक के मार्ग की जल्द ही सुरक्षा जांच की जाएगी। निर्माण कार्य में देरी के कारण यह कार्य अब जाकर संभव हो पाया है।पी-1
विशेष संवाददाता | जबलपुर
ब्राॅडगेज में परिवर्तित जबलपुर से घंसौर के बीच एक अप्रैल से ट्रेन दौड़ने लगेगी। ट्रेन चलाने के िलए सुरक्षा आयुक्त सुशील चंद्रा ने गुरुवार को 100 किलोमीटर की रफ्तार से स्पेशल ट्रेन दौड़ाकर नए ट्रैक की सुरक्षा जांच की। उन्होेंने सुकरी से लेकर घंसौर तक के 35 किलोमीटर के ट्रैक पर न केवल तेज गति बल्कि धीमी गति से भी स्पेशल ट्रेन के जरिये परीक्षण किया। इस दौरान वे सुकरी से सबसे पहले शिकारा स्टेशन जाकर रुके और फिर बिनैकी और घंसौर स्टेशन पहुंचे।
सीआरएस श्री चंद्रा के साथ नागपुर के डीआरएम अमित अग्रवाल के अलावा पमरे के अधिकारी भी थे। उन्होंने स्टेशनों पर कमियों को नजरअंदाज न करने की बात कही। उनका कहना था कि जल्द से जल्द निर्माण की कमियों को दूर किया जाए, ताकि इस मार्ग पर नियमित रूप से ट्रेनों का परिचालन हो सके। जबलपुर से सुकरी तक के 45 किलोमीटर तक पिछले साल 18 अगस्त को पैसेंजर ट्रेन का परिचालन शुरू हुअा था और उसके बाद से ही यह कहा जा रहा था कि सुकरी से घंसौर तक के मार्ग की जल्द ही सुरक्षा जांच की जाएगी। निर्माण कार्य में देरी के कारण यह कार्य अब जाकर संभव हो पाया है।पी-1
विशेष संवाददाता | जबलपुर
ब्राॅडगेज में परिवर्तित जबलपुर से घंसौर के बीच एक अप्रैल से ट्रेन दौड़ने लगेगी। ट्रेन चलाने के िलए सुरक्षा आयुक्त सुशील चंद्रा ने गुरुवार को 100 किलोमीटर की रफ्तार से स्पेशल ट्रेन दौड़ाकर नए ट्रैक की सुरक्षा जांच की। उन्होेंने सुकरी से लेकर घंसौर तक के 35 किलोमीटर के ट्रैक पर न केवल तेज गति बल्कि धीमी गति से भी स्पेशल ट्रेन के जरिये परीक्षण किया। इस दौरान वे सुकरी से सबसे पहले शिकारा स्टेशन जाकर रुके और फिर बिनैकी और घंसौर स्टेशन पहुंचे।
सीआरएस श्री चंद्रा के साथ नागपुर के डीआरएम अमित अग्रवाल के अलावा पमरे के अधिकारी भी थे। उन्होंने स्टेशनों पर कमियों को नजरअंदाज न करने की बात कही। उनका कहना था कि जल्द से जल्द निर्माण की कमियों को दूर किया जाए, ताकि इस मार्ग पर नियमित रूप से ट्रेनों का परिचालन हो सके। जबलपुर से सुकरी तक के 45 किलोमीटर तक पिछले साल 18 अगस्त को पैसेंजर ट्रेन का परिचालन शुरू हुअा था और उसके बाद से ही यह कहा जा रहा था कि सुकरी से घंसौर तक के मार्ग की जल्द ही सुरक्षा जांच की जाएगी। निर्माण कार्य में देरी के कारण यह कार्य अब जाकर संभव हो पाया है।पी-1
1 अप्रैल से जबलपुर-घंसौर के बीच दौड़ेगी ट्रेन

  
765 views
Mar 24 2017 (09:37)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2208786-1            Tags   Past Edits
at last most waited CRS of SOY-Ghansore new BG line has been done and from 1 april trains can run on SOY-Ghansore new BG line and existing JBP-SOY passenger will be extended till ghansore also from april 1 and CRS spl has run on the new section with a speed of 100kms/hr and CRS also inspected the b/w stations of SOY-Ghansore section also

  
769 views
Mar 24 2017 (10:16)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2208786-2            Tags   Past Edits
same news naidunia version

  
696 views
Mar 24 2017 (12:35)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2208786-3            Tags   Past Edits
KTE diesel engine used for CRS Spl as u can see in the pics and the section had been given green signal by CRS to operate rail services and from April 1 train services will start on SOY-Ghansore section also

  
435 views
Mar 25 2017 (02:19)
Foamer~   1443 blog posts
Re# 2208786-4            Tags   Past Edits
Good News!!! Can you please share any info on the Balaghat-Nainpur section.... When it would be completed?

7 posts are hidden.

  
62 views
Today (11:12)
Mad about trains   682 blog posts   169 correct pred (74% accurate)
Re# 2208786-13            Tags   Past Edits
Kal ke bhaskar me ek tender nikla hai for appointing ticket seller at passenger halt between ghansore and sukri. The important thing is last date for applying is 26 April. My point is ki jab tak wo in 2 passenger halt pe ticket seller nahi rakhenge, how can passengers train will be extended till ghansore on first April. Is it any type of April fooling by railway?

1 posts are hidden.
  
★★  General Travel
0 Followers
617 views
Mar 24 2017 (05:48)   CHTS/Cochin Depot (2 PFs)

thejusjj   23 blog posts
Entry# 2208594            Tags   Past Edits
When a train came calling at Cochin Harbour Terminus[CHTS]. The tracks came to CHTS. Snaps by Rtv @Robinjourno

  
441 views
Mar 24 2017 (09:15)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2208594-1            Tags   Past Edits
so SR started the renovation of Cochin Harbour station hmm so as part of that new line is being laid in the platform??

  
170 views
Mar 25 2017 (16:47)
thejusjj   23 blog posts
Re# 2208594-2            Tags   Past Edits
yes, they have started the renovation
  
★  General Travel
0 Followers
767 views
Mar 24 2017 (05:44)   CHTS/Cochin Depot (2 PFs)

thejusjj   23 blog posts
Entry# 2208593            Tags   Past Edits
Cochin Harbour Terminus is being renovated. April 1 is the target date. Some of the pics [taken on 21 March 2017] posted by "rkpai13" in Kerala Railways Skyscrapercity thread. Credits to "rkpai13"

  
389 views
Mar 24 2017 (09:22)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2208593-1            Tags   Past Edits
so any plan of electrification of lines till cochin Harbour as this station will start after renovation??

  
257 views
Mar 25 2017 (10:20)
Srinivas S Pai~   16 blog posts   5 correct pred (54% accurate)
Re# 2208593-2            Tags   Past Edits
Nope..Navy has denied permission for Electrification.Hence no hopes of express trains starting from CHTS.Only DEMU services may operate from CHTS

6 posts are hidden.
  
★★  General Travel
0 Followers
977 views
Mar 23 2017 (18:16)   PPI/Pipariya (3 PFs) | ET/WAP-4/22629

ये क्या हो रहा है इंडियन रेलवे में~   329 blog posts   280 correct pred (79% accurate)
Entry# 2208140            Tags   Past Edits
हरी झंडी के इंतजार में सजा खड़ा रहा बिजली इंजन
click here

5 posts are hidden.

  
477 views
Mar 24 2017 (10:12)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2208140-6            Tags   Past Edits
no CRS found many glitches after inspecting newly electrified ET-PPI section and have given orders to ofcls to correct all problems found and then start elocos on ET-PPI section after 10april so there is no need to conduct CRS again

  
479 views
Mar 24 2017 (10:14)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2208140-7            Tags   Past Edits
ha wahi to maine bhi pada tha bhaskr me ki CRS ne elocos chalane ko hari jhandi de di but jb tak IR ofcly ye baat release nai krta tab tak kuch nai keh sakte

  
409 views
Mar 24 2017 (11:52)
ये क्या हो रहा है इंडियन रेलवे में~   329 blog posts   280 correct pred (79% accurate)
Re# 2208140-8            Tags   Past Edits
acha aisa hua hai

1 posts are hidden.
  
★  General Travel
0 Followers
760 views
Mar 23 2017 (20:29)  

Waiting for elocos in ET JBP section😌~   41 blog posts
Entry# 2208343            Tags   Past Edits
Updates on Katni-Jabalpur electrification.
The work is going on with full pace between jabalpur to sihora.
The hole work is done till jabalpur outer and soon to be reached jabalpur station but after sihora till katni the work is very slow, in some places not even hole work is done.
Pic - Gosalpur station #ETALDELECTRIFICATION #JBPNEWS

1 posts are hidden.

  
501 views
Mar 24 2017 (10:24)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2208343-2            Tags   Past Edits
so hope JBP-Sihora will get electrified soon and i think JBP station will be electrified at last only due to the block which has to be taken by contractor to complete work in JBP yard and in main station area and palatforms and good to see some pace comes in the JBP-KTE section for electrification and i think likewise ET-PPI JBP-Sihora work will complete before Sihora-KTE/KTES

2 posts are hidden.
  
General Travel
0 Followers
482 views
Mar 23 2017 (12:14)  

rohit04u   33 blog posts
Entry# 2207603            Tags   Past Edits
Fantastic news update itarsi pipariya railway electrification crs inspection 22 march 2017 bhai somebody please update on nu pipariya railway electrification also kitna complete hua or kitna left now agar ye or katni jbp bhi complete ho gaya toh phir sab e loco katni pe hi change honge kachhpura jbp pe bhi kaam shuru ho gaya hai from mml i didn't expected this kind of pace of the work feel this katni itarsi would get completed by December 2017 pakka but katni satna ne poora kaam bigaad diya otherwise full itarsi allahabad balle balle ho jati

  
334 views
Mar 23 2017 (12:21)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2207603-1            Tags   Past Edits
ha kal CRS of ET-PPI new electric section ka ho gaya or CRS ne usse hari jhandi bhi dikha di hai so ab jald ET-PPI me eloco chalne shuru ho jaynge or yeh news aaj k dainik bhaskar me aayi hai

  
352 views
Mar 23 2017 (12:45)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2207603-2            Tags   Past Edits
aaj CRS SOY-Ghansore new BG section ka bhi inspection kar rahe hai so lagta hai ki iss section ko bhi bina koi shart hari jhandi dikha di jaygi CRS k dwara or JBP -SOY passenger ko ghansore tak bi extend kr dia jayga so kareeb kareeb ET-JBP-KTE sectio electrification or jbp-NIR-BTC BG project bhi iss saal dec tak pura hona chahiye

2 posts are hidden.
  
★  General Travel
0 Followers
1538 views
Feb 10 2017 (17:49)   12182/Dayodaya Express | KTE/Katni Junction (6 PFs) | ET/WAP-4/22821

RFShanku~   611 blog posts   223 correct pred (70% accurate)
Entry# 2159105            Tags   Past Edits
ET WAP-4 22821 Arrived at KTE.
Pic Is Taken From 22182 NZM-JBP SF.

9 posts are hidden.

  
448 views
Mar 23 2017 (02:44)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2159105-10            Tags   Past Edits
This wap will run till its destinaton to destination in both ends soon n may b by this year end

  
398 views
Mar 23 2017 (05:51)
RFShanku~   611 blog posts   223 correct pred (70% accurate)
Re# 2159105-11            Tags   Past Edits
Hope so.
  
★  General Travel
0 Followers
1197 views
Mar 22 2017 (13:27)   PPI/Pipariya (3 PFs) | TKD/WAG-9

OHE over JBP~   1113 blog posts   64 correct pred (72% accurate)
Entry# 2206486            Tags   Past Edits
CORE officers conducted a trial on tuesday by running a e-loco from ET which reached PPI without any hassel. CRS inspection of ET-PPI is to be done today, expected to complete by 15:40 HRS in PPI. Electrification uptill JBP is to be completed by the end of this year.
#ETALDELECTRIFICATION

3 posts are hidden.

  
761 views
Mar 22 2017 (15:07)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2206486-4            Tags   Past Edits
ab to ET-JBP-KTE section k ache din aane shuru ho gaye jiska seedha example hai ye news or isike sath aaj ho rha ET-PPI electrification ka CRS or SOY-Ghansore new BG line ka CRS so bas ab intezar hai ki electrification JBP tak bhi pura ho jaaye sath hi sath KTE/KTES tak bhi taaki JBP se originate/terminate hone wali trains to end to end elocos se chale

  
696 views
Mar 22 2017 (15:11)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2206486-5            Tags   Past Edits

  
713 views
Mar 22 2017 (15:20)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2206486-6            Tags   Past Edits
ET-PPI section k railfans please CRS ki pics post kare

  
658 views
Mar 22 2017 (15:24)
arydolly001   378 blog posts
Re# 2206486-7            Tags   Past Edits
are koi bhi railfans ho ek photo upload kr do baba , badi merbani hogi

3 posts are hidden.
  
★  Info Update
0 Followers
1166 views
Mar 22 2017 (12:50)   ALD/Allahabad Junction (10 PFs)

Saurabh*^~   8707 blog posts   3230 correct pred (73% accurate)
Entry# 2206435            Tags   Past Edits
CRS inspection of Chheoki-Shankargarh section(37 Kms).
---------------
#Electrification

6 posts are hidden.

  
506 views
Mar 22 2017 (15:04)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2206435-7            Tags   Past Edits
aaj to IR me CRS ki baarish ho gai bahut se sections ka alag alag kaam k liye CRS ho rha hai or sunke acha laga ki km se km ALD end se bhi kaam complete ho rha hai or aaj ET-PPI ka CRS ho rha hoga so kalka wait hai jab real pics aaygi info. k sath or achi baat ye hai ki CRS jbp k do bade kaamo ko complete hone ki hari jhandi dene aa rahe hai ek hai ET-PPI electrification or dusra Sukrimangela-Ghansore new BG line on JBP-NIR section so dono hi inspection JBP /WCR k liye bahut imp. hai

5 posts are hidden.
  
★  Rail Fanning
0 Followers
862 views
Mar 17 2017 (16:19)   22909/Valsad - Puri SF Express | KTES/Katni South (2 PFs)

tsrijan~   50 blog posts   3 correct pred (60% accurate)
Entry# 2200758            Tags   Past Edits
BL-PURI Weekly SF curving out of KTES and going towards NKJ. The curve has a PSR of 15 kmph.

  
669 views
Mar 17 2017 (16:48)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2200758-1            Tags   Past Edits
no signs of electrifcation in KTES also??

  
669 views
Mar 17 2017 (16:48)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2200758-2            Tags   Past Edits
no signs of electrifcation in KTES also??

  
675 views
Mar 17 2017 (16:59)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2200758-3            Tags   Past Edits
no signs of electrifcation in KTES also??

1 posts are hidden.

  
404 views
Mar 22 2017 (07:23)
RFShanku~   611 blog posts   223 correct pred (70% accurate)
Re# 2200758-5            Tags   Past Edits
Electrication sirf MDRR tk hua hai
Page#    1435 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Apr 6
Trains with ARP 15 Dep on: Tue Apr 11
Trains with ARP 30 Dep on: Wed Apr 26
Trains with ARP 120 Dep on: Tue Jul 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site