Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Apr 27, 2017 03:28:09 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Apr 27, 2017 03:28:09 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Naveen Golla
Page#    165 Blog Entries  next>>
  
General Travel
0 Followers
595 views
Apr 25 2017 (09:13)   TPTY/Tirupati Main (5 PFs)

Naveen Golla   280 blog posts
Entry# 2249539            Tags   Past Edits
better this we can increase tpty to vasco train with the coach sizes upto 24 as 12 coaches to vasco as existing and new 12 coaches new train to nanded via raichur,secunderabad,nzm etc
in return the train will start immediate return to tpty which will combine both in gtl for tpty ie vasco to tpty and nanded to tpty
this will work and this will increase more patronage in this route and finally with full fledge 24 coaches to tpty.
guys
...
more...
wht do say for this.

6 posts - Tue Apr 25, 2017

  
273 views
Apr 25 2017 (21:23)
GOA SK TO VSG~   6224 blog posts   613 correct pred (67% accurate)
Re# 2249539-7            Tags   Past Edits
Yes i know that but 12 TPTY and 10 existing HYB VSG is 22 which is above 20 coach limit.

  
256 views
Apr 25 2017 (22:15)
Naveen Golla   280 blog posts
Re# 2249539-8            Tags   Past Edits
you are wrong i am talking only abt tpty to vasco train i know we have split and attachment in gtl which will go to vasco as single train.
in addition to this i am trying to add new train from tpty to nanded via raichur as single train is not posible but using tpty to vasco train as it runs only with 10 coaches as i am going add new additional coaches with total 14 and this will runas single traib upto gtl with total 24 coaches there we will split this train as separate train to run nanded.as existing hyd to vasco it will attach in gtl for tpty to vasco as currently happening this will not disturbed.in return
...
more...
when vasco reaches to gtl during that time this nanded to tpty will also reach sametime to gtl and now vasco to tpty and nanded to tpty will be combined as one train which will go tpty and existing vasco to hyd that will come to hyd as usual.
hope this will clarify more.

  
202 views
Apr 25 2017 (22:54)
Naveen Golla   280 blog posts
Re# 2249539-9            Tags   Past Edits
guys if u like this proposal blog please give the rating as still i see zero percent rating for my profile.

  
185 views
Apr 25 2017 (23:01)
ధూమ శకటం~   232 blog posts   3 correct pred (60% accurate)
Re# 2249539-10            Tags   Past Edits
Sorry Annai rating ivvanandhuku....Moderator disagree option theseysaru

  
126 views
Yesterday (17:20)
GOA SK TO VSG~   6224 blog posts   613 correct pred (67% accurate)
Re# 2249539-11            Tags   Past Edits
You said 12 coaches to VSG in Original post.
  
General Travel
0 Followers
494 views
Apr 25 2017 (08:52)   17429/Rayalaseema Express

Naveen Golla   280 blog posts
Entry# 2249515            Tags   Past Edits
its great to here atlast rayalaseema getting eloco.
after getting will they increase coaches to 24?also its better to
extend this train upto chennai and make it as superfast.
this would be my proposal.

  
363 views
Apr 25 2017 (09:55)
Venkat వెంకట్   2764 blog posts
Re# 2249515-1            Tags   Past Edits
LPI - RU its having 55 kmph avg speed. I think speed increase not that easy now. 24 coachers can be made.
Its for Rayalaseema people to come hyd, extending it to chennai wont solve purpose.

  
257 views
Apr 25 2017 (22:34)
Naveen Golla   280 blog posts
Re# 2249515-2            Tags   Past Edits
why cant its posiible to extend and convert to sperfast.
upto renigunta it wil serve for passengers who they want drop to tpty they can getdown at renigunta as rayalaseema paxs they dont have other option train to go to chennai especially raichur,mantralayam,adoni and guntakal passenger's.
do you how much trouble they are facing for giing to chennai.in evening last train is mail after that they have wait till next day for convenience.
my
...
more...
suggestion it should get extend or we need new train whichever is feasible.

  
276 views
Apr 25 2017 (22:37)
Boxer Bhai   38750 blog posts   12687 correct pred (61% accurate)
Re# 2249515-3            Tags   Past Edits
Sr zone must agree first
Y u want dedicated hyd tpty extension to mas ?

  
252 views
Apr 25 2017 (22:45)
Naveen Golla   280 blog posts
Re# 2249515-4            Tags   Past Edits
if scr wish then sr will accept the request i guess.

  
233 views
Apr 25 2017 (22:56)
Boxer Bhai   38750 blog posts   12687 correct pred (61% accurate)
Re# 2249515-5            Tags   Past Edits
Haha sr will accept dreaming too much
  
General Travel
0 Followers
626 views
Apr 10 2017 (20:28)   GTL/Guntakal Junction (6 PFs)

Naveen Golla   280 blog posts
Entry# 2230094            Tags   Past Edits
Friends just want to check guntakal to kallur via khaderpet as electrification color is green is that single route is electrified?
Normally color green indicates status complted so can any knows abut this route status of electrification please?

  
492 views
Apr 11 2017 (17:56)
Naveen Golla   280 blog posts
Re# 2230094-1            Tags   Past Edits
Any update please

  
138 views
Apr 25 2017 (22:20)
Naveen Golla   280 blog posts
Re# 2230094-2            Tags   Past Edits
hi vasudatta any updates on this route
  
General Travel
0 Followers
172 views
Apr 25 2017 (09:06)   17419/Tirupati - Vasco-Da-Gama Express

Naveen Golla   280 blog posts
Entry# 2249531            Tags   Past Edits
better this we can increase the coach sizes upto 24 as 12 coaches to vasco as existing and new 12 coaches new train to nanded via raichur,secunderabad,nzm etc
in return the train will start immediate return to tpty which will combine both in gtl for tpty ie vasco to tpty and nanded to tpty
this will work and this will increase more patronage in this route and finally with full fledge 24 coaches to tpty.
guys
...
more...
wht do say for this.
  
★  General Travel
1 Followers
3176 views
Apr 01 2017 (08:28)   NDL/Nandyal Junction (3 PFs)

✿ఛుక్ 🚃 ఛుక్ 🚃 రైలు✿~   3990 blog posts   149 correct pred (71% accurate)
Entry# 2217963            Tags   Past Edits
electric engine trial run completed between guntakal - dhone....yesterday guntakal elec chief engineer inspected the route....so they may run upto guntur if total line is completed the inspection.

10 posts are hidden.

  
279 views
Apr 10 2017 (20:31)
Naveen Golla   280 blog posts
Re# 2217963-11            Tags   Past Edits
So whts the next plan and which will be the first eloco train on this route? Wht abt gy to dhone is this also complted?

1 posts are hidden.

  
248 views
Apr 10 2017 (20:33)
MI~   792 blog posts   58 correct pred (75% accurate)
Re# 2217963-13            Tags   Past Edits
May b for amaravathi express

  
344 views
Apr 10 2017 (20:35)
Naveen Golla   280 blog posts
Re# 2217963-14            Tags   Past Edits
R u joking hw come amarvathi can be just gtl to dhone with eloco?
My guess sbc to guntur pssngr train

  
429 views
Apr 10 2017 (20:43)
MI~   792 blog posts   58 correct pred (75% accurate)
Re# 2217963-15            Tags   Past Edits
Sry I thought in my conversation ☺

3 posts are hidden.

  
932 views
Apr 11 2017 (07:00)
✿ఛుక్ 🚃 ఛుక్ 🚃 రైలు✿~   3990 blog posts   149 correct pred (71% accurate)
Re# 2217963-19            Tags   Past Edits
may be they will complete from gooty - pendekallu also

6 posts are hidden.
  
General Travel
0 Followers
828 views
Dec 30 2016 (13:15)   GTL/Guntakal Junction (6 PFs)

Naveen Golla   280 blog posts
Entry# 2110342            Tags   Past Edits
Now its time for most waiting trains humsafar
1 jammutawi to tirupati
2 chennai to ahmedhabad
Till now it was good repsonse from scr , swr helping by central for much development progress in this route.
1
...
more...
introduction of new train for tirupati hyderbad and vasco
2 extension of tpty to guntkal upto kalydurg
3 doubling work between kallur and guntkal
4 ohp work btween hyd to guntkal expecting almost complte
5 ohp work between guntur to guntkal expecting almost complete
Overall its looks good apart from train timing between vasco to hyderbad this needs to be updated as my suggestion.
2016 year given much progress to guntkal division hope this will continue in upcoming further developments
Good bye to 2016 and welcome to 2017
  
★  General Travel
1 Followers
4586 views
Dec 15 2016 (14:41)   GTL/Guntakal Junction (6 PFs)

karim1237890   53 blog posts
Entry# 2091643            Tags   Past Edits
Hi friends..Check Guntakal to kalluru via khadarpet double line importance which is attached to wall in Gtl junction

2 posts are hidden.

  
1026 views
Dec 22 2016 (08:45)
Naveen Golla   280 blog posts
Re# 2091643-3            Tags   Past Edits
Hi can someone share the pics of work in progress between khaderpet to venkatampalli ,venkatampalli to gulpalyam and penna river bridge progress

  
959 views
Dec 22 2016 (08:47)
Naveen Golla   280 blog posts
Re# 2091643-4            Tags   Past Edits
Also overallstatus. Till now work completed of both.

  
2558 views
Dec 22 2016 (18:32)
Vishnu Datta Jacke~   105 blog posts
Re# 2091643-5            Tags   Past Edits
almost land leveling works complteted from Kallur jn to Hanuman circle . bwt hanuman circle to guntakal few days back started works & new Platforms are going to builed at HANUMAN CIRCLE , VENKATAMAPLLI , KHADERPET . Penna bridge works of piller is nearing to complete :)
Soonly i will update with some Pic's .

4 posts are hidden.
  
General Travel
0 Followers
2519 views
Dec 12 2016 (15:56)   17023/Tungabhadra Express

Naveen Golla   280 blog posts
Entry# 2088731            Tags   Past Edits
We request for extending tungabadra express train till to dharvad. Also for rake sharing they can use janasadharan spl train which swr has introduced running inbetween dharvad to bellary as this train can rename as tungabadra and can extend upto secunderabad.this will not disturb existing train timings which currently running but this will give connectivity.for kurnool and bellary in daytime.
So please vote for it looking for best as this will hit rock star train inthis route.

  
1754 views
Dec 12 2016 (17:04)
SLA   1014 blog posts
Re# 2088731-1            Tags   Past Edits
Sir, extending of 17023/24 beyond KRNT is very very negligible.

  
1985 views
Dec 17 2016 (14:01)
pslkumar   327 blog posts
Re# 2088731-2            Tags   Past Edits
it'll be good to see the train passing through tb dam @hospet if it extended and train can run with both second sitting & sleeper class coaches (krishna exp model). Also its better to revive old vijaya nagar exp used to run btn gtl-vasco on mg track.

  
1877 views
Dec 18 2016 (17:33)
Naveen Golla   280 blog posts
Re# 2088731-3            Tags   Past Edits
Vijayanagara expess?

  
1794 views
Dec 18 2016 (22:34)
pslkumar   327 blog posts
Re# 2088731-4            Tags   Past Edits
yes

  
Dec 22 2016 (08:58)
Naveen Golla   280 blog posts
Re# 2088731-5            Tags   Past Edits
Earlier i have seen this vijayanagar express which the first train was intrduced after guage conversion between gtl and hubli.this train used to start at 9 30 am in gtl to hubli,later dont know the reason why it got terminated.
But if scr and swr with sr if they think then it can be introduced starting from pudicherry to kolhapur as oneslip and another slip should be goa.
If this works then this will be blockbuster train.
  
General Travel
0 Followers
1079 views
Dec 15 2016 (09:06)   GTL/Guntakal Junction (6 PFs)

Naveen Golla   280 blog posts
Entry# 2091334            Tags   Past Edits
Its great to say the first scheduled departure of train from guntakal is great rayalaseema express.
  
General Travel
0 Followers
1016 views
Dec 12 2016 (19:13)   SC/Secunderabad Junction (10 PFs)

Naveen Golla   280 blog posts
Entry# 2088933            Tags   Past Edits
We request for extending tungabadra express train till to dharvad. Also for rake sharing they can use janaanshan spl train which swr has introduced running inbetween dharvad to bellary as this train can rename as tungabadra and can extend upto secunderabad.this will not disturb existing train timings which currently running but this will give connectivity.for kurnool and bellary in daytime.
So please vote for it looking for best as this will hit rock star train inthis route.

  
948 views
Dec 12 2016 (19:14)
Boxer Bhai   38750 blog posts   12687 correct pred (61% accurate)
Re# 2088933-1            Tags   Past Edits
Stop spammig posting same topic every time since afternoon

  
822 views
Dec 14 2016 (16:44)
Naveen Golla   280 blog posts
Re# 2088933-2            Tags   Past Edits
Neku untha scene ledu amma so anni musukoni untay baguntundi

  
806 views
Dec 14 2016 (17:28)
Boxer Bhai   38750 blog posts   12687 correct pred (61% accurate)
Re# 2088933-3            Tags   Past Edits
Use words wisely
Page#    165 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun May 7
Trains with ARP 15 Dep on: Fri May 12
Trains with ARP 30 Dep on: Sat May 27
Trains with ARP 120 Dep on: Fri Aug 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site