Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Jun 26, 2017 16:32:30 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Jun 26, 2017 16:32:30 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 1448073-0
Details Edit
Large Station Board;
Entry# 1898599-0
Details Edit
Large Station Board;
Entry# 1909706-0
Details Edit
Large Station Board;
Entry# 2076040-0

KUR/Khurda Road Junction (7 PFs)
ଖୋର୍ଦ୍ଧା ରୋଡ଼ ଜଙ୍କସନ     खोरधा रोड जंक्शन
[Jatani,Khorda Road]

Track: Triple Electric-Line

Station Road, Jatani, Dist - Khordha 752050
State: Odisha

Elevation: 25 m above sea level
Zone: ECoR/East Coast   Division: Khurda Road
No Recent News for KUR/Khurda Road Junction
Nearby Stations in the News
Type of Station: Junction
Number of Platforms: 7
Number of Halting Trains: 237
Number of Originating Trains: 6
Number of Terminating Trains: 6
Rating: 3.8/5 (152 votes)
cleanliness - good (19)
porters/escalators - good (19)
food - good (19)
transportation - good (19)
lodging - good (19)
railfanning - good (19)
sightseeing - good (19)
safety - good (19)

Nearby Stations

HPGM/Haripur Gram 3 km     ARGL/Argul P.H. 5 km     RTN/Retang 7 km     MWQ/Motari Halt 8 km     KPXR/Kaipadar Road 9 km     KASR/Kanas Road 12 km     SRKT/Sarkantra 12 km     LGTR/Lingaraj Temple Road 14 km     KURT/Khurda Town 14 km     DLMH/Dhaulimuhan 14 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 163 blog entries  next>>
  
General Travel
1 Followers
181 views
Today (07:40)   NYG/Nayagarh

MIK   215 blog posts   23 correct pred (47% accurate)
Entry# 2332954            Tags   Past Edits
Odhisa CM demands
1)A train to howrah side from Nayagarh town
2)A train to Vizag side from Nayagarh Town
3)Daily train from Khurda/Bhubanewar to Mumbai via angul (train name - Buxi Jagabandhu)

  
63 views
Today (14:35)
MIK   215 blog posts   23 correct pred (47% accurate)
Re# 2332954-1            Tags   Past Edits
Which garibrath runs b/n bbs -hwh

  
44 views
Today (14:39)
Afraaz suhail 🚂🚄🚅~   4257 blog posts   573 correct pred (87% accurate)
Re# 2332954-2            Tags   Past Edits
Puri hwh

  
31 views
Today (14:44)
MIK   215 blog posts   23 correct pred (47% accurate)
Re# 2332954-3            Tags   Past Edits
If one puri train diverted then it will open doors of other trains too for bam side
  
General Travel
0 Followers
118 views
Jun 24 2017 (09:46)   KUR/Khurda Road Junction (7 PFs) | VSKP/WAP-7/30501

asrajesh.9   8 blog posts
Entry# 2331132            Tags   Past Edits
VSKP based WAP-7, shunting @Khurda Road
  
★★  General Travel
Feb 10 2016 (10:16)   VSKP/Visakhapatnam Junction (8 PFs)
 

Mangalagiri   340 blog posts
Entry# 1734723            Tags   Past Edits
Time has come for VSKP to say Good bye to ECoR ..
Announcement on Vizag zone after Union Budget, says Sujana
: Chief Minister N. Chandrababu Naidu has requested the Railway Ministry to take an expeditious decision on the creation of Visakhapatnam railway zone.
The Chief Minister, accompanied by Union Minister Y.S. Chowdary and P. Ashok Gajapati Raju, called on Railway Minister Suresh Prabhu
...
more...
in New Delhi on Tuesday. Mr. Naidu submitted representation seeking speedy completion of pending works in the State, including connectivity between Amaravati and major cities in the south through high-speed trains.
He wanted the Railway Ministry to make sufficient budgetary allocations for the completion of the Kakinada-Pithapuram, Nadikudi-Srikalahasti and Guntukal-Srikalahasti lines besides requesting the Centre to hand over maintenance of the old bridge at Rajahmundry to the State Government. The State emphasised the need for ensuring that the allocations were made in the upcoming railway budget.
Mr. Chowdary said the Centre had given in-principle clearance for the railway zone in Visakhapatnam and the zone would be announced after the Union Cabinet formally gives its nod.
Development package
Creation of the special railway zone was part of the special development package assured to the State post bifurcation.
The State had also sought the Ministry to take up works on feeder line connecting the new capital Amaravati with Guntur and Vijayawada. The Ministry was requested to consider the proposal for laying third line between Visakhapatnam and Chennai besides examining the proposals for development of infrastructure at important railway stations through joint ventures.
The Railway Minister, he said, positively responded to the representation and promised that surveys would be undertaken on the proposals submitted by the State Government as well as the MPs from the State.
Thrust areas
Sufficient budgetary allocations for completion of Kakinada-Pithapuram, Nadikudi-Srikalahasti, Guntukal-Srikalahasti lines
Commencement of works on feeder line connecting the new capital Amaravati with Guntur and Vijayawada
Third line sought between Visakhapatnam and Chennai
click here

22 posts - Wed Feb 10, 2016

66 posts - Thu Feb 11, 2016

  
67713 views
Feb 11 2016 (18:15)
LHB Coromandal A Dream^~   6666 blog posts   8486 correct pred (74% accurate)
Re# 1734723-106            Tags   Past Edits
Even if train got extended to BBS, still its going via VSKP city and catering to both cities.

  
68199 views
Feb 11 2016 (18:23)
LHB Coromandal A Dream^~   6666 blog posts   8486 correct pred (74% accurate)
Re# 1734723-107            Tags   Past Edits
#moderator
#system
#FM
Bashing is going on on full height against a specific Zone and State.
Kindly Lock this blog.

  
Feb 11 2016 (18:28)
South East Coast Railway SECoR™   501 blog posts   449 correct pred (59% accurate)
Re# 1734723-108            Tags   Past Edits
how come it is catering both the cities
quota for VSKP had been decreased by ECoR, infact BBS has more quota than VSKP, for its extended trains - isn't true?
new coaches allotted to WAT are replaced by old coaches within weeks of their inauguration - isn't true?
new trains proposed for VSKP are rejected by ECoR stating irrelevant reasons and the same
...
more...
trains are lobbied to start from BBS - isn't true
trains running from BBS are given proper/effecient TT, while that of VSKP are given TT full of slacks or less TAT - isn't true?

  
67567 views
Feb 11 2016 (18:28)
kalingaUtkal   224 blog posts
Re# 1734723-109            Tags   Past Edits
Yes, you are right.
Nothing has happen till now. But so many bashings are going on. First Rly. Ministry will discuss with Odisha Govt. as per the demands in this reagard, than any fruitful news may come for A.P peoples.

  
Feb 11 2016 (18:30)
system   939 blog posts
Re# 1734723-110            Tags   Past Edits
Auto-Archived due to Objections.
  
General Travel
0 Followers
5144 views
May 13 2017 (18:00)   HWH/Howrah Junction (23 PFs)

Ideologies Matters More~   514 blog posts
Entry# 2275778            Tags   Past Edits
Safest stations rated from APRIL 16 to APRIL 17
Tatanagar Jn.
Asansol Jn.
Bokaro Steel City
Purulia Jn.
Ranchi
...
more...

Hatia
Haldia
Bankura
Bishnupur
Rourkela Jn.
Balessore
Puri
Joychandi Pahar.
Bhubaneshwar
Digha
-
Safe Stations(a bit less rated than safest ones and upgrading to be amongst them):
Bardhaman Jn.
Dankuni
Raniganj
Durgapur
Suri
Rampurhat
-
Unsafe ones for the same period:
Dhanbad Jn.
Gomoh Jn.
Parasnath
Chandrapura Jn.
Barkakana
Khurda Road Jn.
Ramgarh.
.
Undee Controversy but still safe:
Gaya Jn.
Chakradharpur
Kharagpur Jn.
Jharsuguda Jn.
Kolkata Santragachi Jn.
Kolkata Shalimar.
Adra Jn.
Kolkata Howrah Jn.

3 posts - Sat May 13, 2017

11 posts - Sun May 14, 2017

11 posts are hidden.

  
4529 views
May 14 2017 (01:49)
debarathi mandal   4807 blog posts   11442 correct pred (88% accurate)
Re# 2275778-17            Tags   Past Edits
Oh.....pura list kab aiega?

  
4605 views
May 14 2017 (01:56)
Ideologies Matters More~   514 blog posts
Re# 2275778-20            Tags   Past Edits
Individually​ jaab sare zones submit kar denge data taab complete hoga.

  
4607 views
May 14 2017 (01:58)
debarathi mandal   4807 blog posts   11442 correct pred (88% accurate)
Re# 2275778-21            Tags   Past Edits
Sir apko ye data kaha se pata chala?

  
4599 views
May 14 2017 (02:00)
Ideologies Matters More~   514 blog posts
Re# 2275778-22            Tags   Past Edits
E tender works. Live update ho Raha hai.

  
4472 views
May 14 2017 (06:33)
Sectumsempra   252 blog posts
Re# 2275778-23            Tags   Past Edits
I really doubt that Dhanbad station is any much more unsafe than say Asansol 😴
  
General Travel
0 Followers
2436 views
Mar 21 2017 (23:06)   KUR/Khurda Road Junction (7 PFs)

Poll on Fares in Indian Railways entry 2332591^~   82781 blog posts   5299 correct pred (78% accurate)
Entry# 2205863            Tags   Past Edits
Mancheswar-Chudanga Garh (12.7 km) of Khurda-Barang 3rd line & Rajatgarh-Barang #doubling project on Khurda ready commissioned.
#thirdline

  
954 views
May 12 2017 (10:07)
Afraaz suhail 🚂🚄🚅~   4257 blog posts   573 correct pred (87% accurate)
Re# 2205863-1            Tags   Past Edits
Where is the either station?
Page#    Showing 1 to 5 of 163 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.