Timeline UpdatesTrip UpdatesNews PostsPvt PostsAdmin PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Tue May 21, 2013 15:01:53 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Latest...
⇐ Return Journey: Train# 97498

Mumbai CST-Thane Slow Local/97497

Sep 19 2012 (12:49AM)
Change Departure Station:
Change Arrival Station:
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video
Pantry/Catering
✕ NO Pantry Car
✕ NO Catering
RSA - Rake Sharing
Rake/Coach Composition
Loco
PNR    Forum    Time-Table    Availability    Fare Chart    Map    Arr/Dep History    Trips    Gallery    ΣChains    Timeline    

Train Blog

Super Search
Page#    4 blog entries  
General Travel
0 Followers
71 views
Mar 02 2013 (2:46PM)   Mumbai CST-Thane Slow Local/97497        
 

Guest: 45a427d0   show all posts
Entry# 684001                  
train pass monthly
General Travel
0 Followers
366 views
Oct 27 2012 (9:27AM)   Mumbai CST-Thane Slow Local/97497        
 

Guest: 795b6dad   show all posts
Entry# 563760                  
fare charges

320 views
Oct 27 2012 (9:51AM)        

Awaiting CR ACfication*^   4779 blog posts   11377 correct pred (64% accurate)  
Re# 563760-1                  
will b approx Rs. 8 or Rs. 10 from CSTM to THANE (main line)

301 views
Oct 27 2012 (9:58AM)        

คภנคคภ**   6656 blog posts   20486 correct pred (65% accurate)  
Re# 563760-2                  
Unreserved General Fare: Rs. 8
0 Followers
482 views
May 27 2012 (12:31PM)   Mumbai CST-Thane Slow Local/97497        
 

Guest: 250420f9   show all posts
Entry# 436791                  
First-class
0 Followers
1026 views
May 17 2012 (12:01PM)   Mumbai CST-Thane Slow Local/97497        
 

Guest: 188cd982   show all posts
Entry# 427709                  
Can Mumbai Locals be made DOUBLE-DECKER ????

570 views
May 17 2012 (12:02PM)        

Guest: 188cd982   show all posts
Re# 427709-1                  
this would reduce rush ...

566 views
May 17 2012 (12:02PM)        

Guest: 5a9b7b9a   show all posts
Re# 427709-2                  
no. its not possible

573 views
May 17 2012 (12:03PM)        

Koush IRF**   18350 blog posts   1073 correct pred (73% accurate)     Ph:+918233436466
Re# 427709-3                  
Good idea

578 views
May 17 2012 (12:03PM)        

Guest: 188cd982   show all posts
Re# 427709-4                  
why is it not possible ???

577 views
May 17 2012 (12:03PM)        

Guest: 188cd982   show all posts
Re# 427709-5                  
why IR not interested in DD Locals ...

581 views
May 17 2012 (12:04PM)        

Koush IRF**   18350 blog posts   1073 correct pred (73% accurate)     Ph:+918233436466
Re# 427709-6                  
they are doing research on it...

579 views
May 17 2012 (12:05PM)        

Guest: 5a9b7b9a   show all posts
Re# 427709-7                  
double decker coaches are heavy so acceleration will be slow, locals only stops for some seconds or mins on stations and if it will be DD it alighting and boarding will take time.

590 views
May 17 2012 (12:06PM)        

sudhir   7808 blog posts   2093 correct pred (66% accurate)  
Re# 427709-8                  
Have you seen EMU double deckers anywhere? Costs and practicality of having two level platforms at each station, possible reduction of speeds et etc

585 views
May 17 2012 (12:08PM)        

Guest: 188cd982   show all posts
Re# 427709-9                  
then they can run with Limited halts at important stations. The Engine of the Local can be replaced with higher Horse Power Engine 4 better acceleration.

599 views
May 17 2012 (12:10PM)        

sudhir   7808 blog posts   2093 correct pred (66% accurate)  
Re# 427709-10                  
height of the electric lines will have to be different which becomes problematic

607 views
May 17 2012 (12:11PM)        

Guest: 188cd982   show all posts
Re# 427709-11                  
no one has seen EMU DD. But this can be a solution for Mumbai Locals...

597 views
May 17 2012 (12:11PM)        

Guest: 5a9b7b9a   show all posts
Re# 427709-12                  
in that case the charges will be more from EMU's and don't be surprised if DD will be overtaken by an EMU.

602 views
May 17 2012 (12:12PM)        

Guest: 188cd982   show all posts
Re# 427709-13                  
i dont think Electric wire height has been changed in HWH- Dhanbad route 4 accommodating DD.

591 views
May 17 2012 (12:14PM)        

Guest: 188cd982   show all posts
Re# 427709-14                  
they can run as Fast Local. yes fares can be more than ordinary EMU

602 views
May 17 2012 (12:15PM)        

sudhir   7808 blog posts   2093 correct pred (66% accurate)  
Re# 427709-15                  
Howrah Dhanbad DD is not an EMU

596 views
May 17 2012 (12:20PM)        

Guest: 188cd982   show all posts
Re# 427709-16                  
i m saying for HWH DD's route Electric wire height has not been raised, then it sould be feasible 2 run EMU DD also.
If at all Electric wire heights have 2 be changed, IR can experiment EMU DD on HWH- Bhardwan route.

588 views
May 17 2012 (12:20PM)        

Guest: 5a9b7b9a   show all posts
Re# 427709-17                  
even it can run faster the preference will be for EMU only, u can see it now also in mumbai even express and superfast train are given less preference infront of EMU's.

584 views
May 17 2012 (12:23PM)        

Guest: 188cd982   show all posts
Re# 427709-18                  
they can run EMU DD with lesser coaches for better accelerations, & even though its running with lesser coaches, its carrying more people...

586 views
May 17 2012 (12:25PM)        

Guest: 5a9b7b9a   show all posts
Re# 427709-19                  
so it will same carrying capacity as EMU only, in that case they should increase the no. of coaches in EMU this will solve the problem, then we don't need any DD.

567 views
May 17 2012 (12:36PM)        

★··´¯··★ кιиg σf ιя внσραℓ ѕнαтαв∂ι ★··´¯··★   16875 blog posts   15797 correct pred (66% accurate)  
Re# 427709-20                  
how acceleration will become good with DD EMU? if it can then I guess acceleration will be fastest with multi-storey single coach EMU.

569 views
May 17 2012 (12:38PM)        

Guest: 188cd982   show all posts
Re# 427709-21                  
even with 5 DD coaches compared to 6 ordinary EMU coaches, DD capacity is more than ordinary (relative no. of coaches like for 9 ordinary, 7/8 DD) & added to it higher HP Engine....
Will it be feasible ??? I think IR shud look into it...

575 views
May 17 2012 (12:38PM)        

sudhir   7808 blog posts   2093 correct pred (66% accurate)  
Re# 427709-22                  
That means you have to run both ordinary trains and DD emu on the same line. so if the electric line levels are raised what would the ordinary trains run by electric traction do?

566 views
May 17 2012 (12:40PM)        

Guest: 188cd982   show all posts
Re# 427709-23                  
DD EMU sounds good !!!!! :-0

575 views
May 17 2012 (12:40PM)        

sudhir   7808 blog posts   2093 correct pred (66% accurate)  
Re# 427709-24                  
How will you design the entry and exit of commuters?

589 views
May 17 2012 (12:42PM)        

★··´¯··★ кιиg σf ιя внσραℓ ѕнαтαв∂ι ★··´¯··★   16875 blog posts   15797 correct pred (66% accurate)  
Re# 427709-25                  
yeah... entry and exit will be a big headache for design engineers... as people used to rush through in and out of the train.

578 views
May 17 2012 (12:46PM)        

Guest: 188cd982   show all posts
Re# 427709-26                  
any civil engineer in IRI, please support DD EMU.. i m an electronics engineer.

630 views
May 17 2012 (12:46PM)        

sudhir   7808 blog posts   2093 correct pred (66% accurate)  
Re# 427709-27                  
Yes, If staircases are there there will be stampede and people will get hurt. If you go in for multilevel platforms it will be financially infeasible

649 views
May 17 2012 (12:47PM)        

★··´¯··★ кιиg σf ιя внσραℓ ѕнαтαв∂ι ★··´¯··★   16875 blog posts   15797 correct pred (66% accurate)  
Re# 427709-28                  
I'm an ECE engineer but passed Engineering Drawing with a+++

649 views
May 17 2012 (12:51PM)        

Guest: 188cd982   show all posts
Re# 427709-29                  
can some1 give any design for our new DD EMU !!!! :-()
this design can be PATENTED BY IRI !!!!

649 views
May 17 2012 (12:53PM)        

Guest: 188cd982   show all posts
Re# 427709-30                  
Best chance 2 win a PATENT & be rewarded 4 Lifetime !!!!!

650 views
May 17 2012 (12:57PM)        

Guest: 188cd982   show all posts
Re# 427709-31                  
i will build a TWO-LEVEL VESTIBULE (passage for passengers 2 move from one coach 2 another) .

694 views
May 17 2012 (12:58PM)        

Guest: 188cd982   show all posts
Re# 427709-32                  
is it feasible 2 build 2-level vestibule ?????

694 views
May 17 2012 (1:00PM)        

IRChanakya**   1138 blog posts   82 correct pred (70% accurate)  
Re# 427709-33                  
DD Passenger train will help the commuters, Good Suggestion. IR should go for R&D on this.

693 views
May 17 2012 (1:02PM)        

Guest: 188cd982   show all posts
Re# 427709-34                  
thank u for supporting DD EMU .

787 views
May 17 2012 (1:09PM)        

Manoj Garhwal   14339 blog posts   14660 correct pred (63% accurate)  
Re# 427709-35                  
Could be possible with automatic doors and marked entry and exit gates. similar to metro and preferably should be air conditioned.

719 views
May 17 2012 (1:12PM)        

jay   1585 blog posts  
Re# 427709-36                  
I doubt it will work in Indian sub-urban network as most of the passengers stand.A double decker will not have enough head clearence.

744 views
May 17 2012 (1:49PM)        

sudhir   7808 blog posts   2093 correct pred (66% accurate)  
Re# 427709-37                  
will this work in mumbai?

641 views
May 17 2012 (2:54PM)        

Guest: 188cd982   show all posts
Re# 427709-38                  
DD needs to be redesigned, then it can work as DD EMU.

603 views
May 17 2012 (2:56PM)        

Guest: 188cd982   show all posts
Re# 427709-39                  
tats true. Rather than Express DDs, IR should redesign DDs and use it for Passenger Trains. Improved capacity should be utilized rather than spending those coaches on Expresses for under utilization.

603 views
May 17 2012 (2:58PM)        

Guest: 188cd982   show all posts
Re# 427709-40                  
Once Passenger DDs come out, they can be extended 2 EMUs also.

597 views
May 17 2012 (3:00PM)        

Guest: 188cd982   show all posts
Re# 427709-41                  
Except the motor cars,all other coaches of EMU can be DD.
& Motor car/Engine should be of higher power

622 views
May 18 2012 (12:40PM)        

Guest: 188cd982   show all posts
Re# 427709-42                  
super idea, DD EMUs.!!!
Page#    4 blog entries  

Scroll to Top