Disclaimer   
PNR Super Search
 ♦ 
×
HashTag:
PNR Number:
Train Type:
Train:
From Station:
To Station:
Train Class:
2SSLCCEx3AFC2A1A3E
WL Quota:
DOJ From:
DOJ To:
Blogger:
Traveller:
Predictor:
Prediction:
WLRACConf
Stamper:
Final:
WLRACConfVoidQ-ConfUnStamped
Status:
Reaction:

Search
  Go  
 
Thu May 28, 2015 07:34:39 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Thu May 28, 2015 07:34:39 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipModify Search
Latest...
Departure from GAYA on 25th May 2015 rescheduled to 16.00
Mon May 25, 2015 (01:43PM)

12397/Mahabodhi SF Express (PT)
مہا بودھی ایکسپریس     महाबोधि सुपरफास्ट एक्सप्रेस

May 25 (1:43PM)
Change Departure Station:
Change Arrival Station:
RSA - Rake Sharing
No RSA. Two rakes. LHB.
Loco
WAP-4 MGS
cleanliness - average (7)
punctuality - average (9)
food - good (7)
ticket avbl - good (8)
railfanning - good (6)
safety - good (6)
Pantry/Catering
✓ Pantry Car Avbl
✓ Catering Avbl
✕ NO E-Catering
LHB Rake
  0
  L
  1
EOG
  2
 GS
  3
 GS
  4
 GS
  5
 GS
  6
 GS
  7
 S1
  8
 S2
  9
 S3
 10
 S4
 11
 S5
 12
 S6
 13
 S7
 14
 S8
 15
 S9
 16
S10
 17
S11
 18
S12
 19
 PC
 20
 B1
 21
 A1
 22
EOG
News    PNR    Forum    Time-Table    Availability    Fare Chart    Map    Arr/Dep History    Trips    Gallery    ΣChains    X/O    Timeline    

PNR Analysis

Top Predictors for this Train: Md Tabrez Alam*^  238/73%,     Rang De Basanti**  190/74%,     Hussain**  190/80%,     Dipyaman Basu**  172/71%,     Sabyasachi**  149/72%,    

Page#    Showing 1 to 10 of 616 PNR entries  next>>
Predictions: 3
confirm: 3
rac: 0
wl: 0
PREDICT


Journey: Sun Jul 05, 2015 @ 17:47
12397/Mahabodhi SF Express (PT)        

PNR: 634-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl 24   |   Similar PNRs
MGS/Mughal Sarai Junction   to   NDLS/New Delhi   |   788 km / 993 km
Entry# 1475528           
Original Status as of: May 19 (3:16PM)
Passenger 1: Waitlist# 2 (Booking Status: W/L 2,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 26 (8:52PM) 
Passenger 1: Waitlist# 2 (Booking Status: W/L 2,RLGN)
Chart NOT Prepared

Predictions

confirmMay 19 (3:17PM)MOHAMMAD KOUSHER ALAM 
confirmMay 21 (11:56AM)IMG42390 BengaluruGaya Bodhgaya Express via SC ★★★12 corr (92% acc)
confirmMay 26 (9:08AM)nilabh892 corr (100% acc)
Predictions: 4
confirm: 3
rac: 1
wl: 0
PREDICT


Journey: Thu Jun 11, 2015 @ 15:19
12397/Mahabodhi SF Express (PT)        

Posted by: sanjeevgupta37   2 blog posts   9032 correct pred (74% accurate)  
PNR: 644-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl 477   |   Similar PNRs
AUBR/Anugraha Narayan Road   to   NDLS/New Delhi   |   924 km / 993 km
Entry# 1471160           
Original Status as of: May 16 (12:49PM)
Passenger 1: Waitlist# 6 (Booking Status: W/L 28,GNWL)
Passenger 2: Waitlist# 7 (Booking Status: W/L 29,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Yesterday (5:26PM) 
Passenger 1: RAC 98 (Booking Status: W/L 28,GNWL)
Passenger 2: RAC 99 (Booking Status: W/L 29,GNWL)
Chart NOT Prepared

Predictions

racMay 16 (12:49PM)sanjeevgupta37 100 corr (79% acc)
confirmMay 16 (12:52PM)Harshad Pavagi19 corr (67% acc)
confirmMay 16 (1:10PM)ambujpathak294 corr (66% acc)
confirmMay 21 (11:56AM)IMG42390 BengaluruGaya Bodhgaya Express via SC ★★★12 corr (92% acc)
Predictions: 1
confirm: 0
rac: 0
wl: 1
PREDICT


Journey: Sun Jun 07, 2015 @ 15:19
12397/Mahabodhi SF Express (PT)        

Posted by: sanjeevgupta37   2 blog posts   9032 correct pred (74% accurate)  
PNR: 614-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl 477   |   Similar PNRs
AUBR/Anugraha Narayan Road   to   NDLS/New Delhi   |   924 km / 993 km
Entry# 1480684           
Original Status as of: May 22 (8:21PM)
Passenger 1: Waitlist# 109 (Booking Status: W/L 160,GNWL)
Passenger 2: Waitlist# 110 (Booking Status: W/L 161,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Yesterday (5:27PM) 
Passenger 1: Waitlist# 102 (Booking Status: W/L 160,GNWL)
Passenger 2: Waitlist# 103 (Booking Status: W/L 161,GNWL)
Chart NOT Prepared

Predictions

wlMay 22 (8:21PM)sanjeevgupta37 100 corr (79% acc)
Predictions: 16
confirm: 16
rac: 0
wl: 0
PREDICT


Journey: Fri Jun 05, 2015 @ 15:19
12397/Mahabodhi SF Express (PT)        

Posted by: छोटा आदमी **   3653 blog posts   70081 correct pred (89% accurate)  
PNR: 664-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl 477   |   Similar PNRs
AUBR/Anugraha Narayan Road   to   NDLS/New Delhi   |   924 km / 993 km
Entry# 1452545           
Original Status as of: May 03 (10:34AM)
Passenger 1: RAC 77 (Booking Status: RAC 85,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Yesterday (9:36PM) 
Passenger 1: RAC 46 (Booking Status: RAC 85,GNWL)
Chart NOT Prepared

Predictions

confirmMay 03 (10:34AM) छोटा आदमी ** ★★97 corr (89% acc)
confirmMay 03 (10:44AM)kirtidsouza2 corr (66% acc)
confirmMay 03 (10:46AM)迪恩·穆罕默德 29 corr (74% acc)
confirmMay 05 (10:28AM)maxgrow13 corr (61% acc)
confirmMay 08 (7:07AM)Tony Stark** ★★★104 corr (92% acc)
confirmMay 14 (12:09AM)Hiriyanna** ★★★76 corr (92% acc)
confirmMay 14 (6:13PM)ShYaM VaRmA** ★★69 corr (82% acc)
confirmMay 16 (1:07PM)मोहम्मद राशिद खान**5 corr (83% acc)
confirmMay 16 (4:42PM)AC Duronto Express10 corr (62% acc)
confirmMay 17 (10:06AM)Harshad Pavagi19 corr (67% acc)
confirmMay 17 (7:32PM)Hussain** 190 corr (80% acc)
confirmMay 18 (12:11PM)Rajdhani Express** ★★★65 corr (94% acc)
confirmMay 18 (6:28PM)Kartik Shenoy**4 corr (66% acc)
confirmMay 19 (6:54PM)Jayashree ❖ Amita**45 corr (69% acc)
confirmMay 20 (4:31PM)ये तो बस शुरुआत है** 49 corr (77% acc)
confirmMay 22 (4:27AM)IMG42390 BengaluruGaya Bodhgaya Express via SC ★★★12 corr (92% acc)
Predictions: 6
confirm: 6
rac: 0
wl: 0
PREDICT


Journey: Thu Jun 04, 2015 @ 14:20
12397/Mahabodhi SF Express (PT)        

PNR: 654-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl 477   |   Similar PNRs
GAYA/Gaya Junction   to   NDLS/New Delhi   |   993 km / 993 km
Entry# 1460649           
Original Status as of: May 08 (9:21PM)
Passenger 1: RAC 76 (Booking Status: RAC 83,GNWL)
Passenger 2: RAC 77 (Booking Status: RAC 84,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Yesterday (7:27AM) 
Passenger 1: RAC 56 (Booking Status: RAC 83,GNWL)
Passenger 2: RAC 57 (Booking Status: RAC 84,GNWL)
Chart NOT Prepared

Predictions

confirmMay 08 (9:27PM)jAi hO52 corr (63% acc)
confirmMay 08 (9:30PM)sansartnt2 corr (66% acc)
confirmMay 09 (10:02AM)gyandatt0 corr (0% acc)
confirmMay 10 (7:03PM)IMG42390 BengaluruGaya Bodhgaya Express via SC ★★★12 corr (92% acc)
confirmMay 11 (8:47AM)maxgrow13 corr (61% acc)
confirmMay 18 (11:09AM)Harshad Pavagi19 corr (67% acc)
Predictions: 1
confirm: 1
rac: 0
wl: 0
PREDICT


Journey: Wed Jun 03, 2015 @ 16:32
12397/Mahabodhi SF Express (PT)        

PNR: 674-xxxxxxx (PRS)   |   Sleeper - SL   |   Tot Seats: Avbl 501   |   Similar PNRs
BBU/Bhabua Road   to   NDLS/New Delhi   |   842 km / 993 km
Entry# 1466502           
Original Status as of: May 13 (10:32AM)
Passenger 1: Waitlist# 30 (Booking Status: W/L 87,GNWL)
Passenger 2: Waitlist# 31 (Booking Status: W/L 88,GNWL)
Passenger 3: Waitlist# 32 (Booking Status: W/L 89,GNWL)
Passenger 4: Waitlist# 33 (Booking Status: W/L 90,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Today (7:15AM) 
Passenger 1: Waitlist# 7 (Booking Status: W/L 87,GNWL)
Passenger 2: Waitlist# 8 (Booking Status: W/L 88,GNWL)
Passenger 3: Waitlist# 9 (Booking Status: W/L 89,GNWL)
Passenger 4: Waitlist# 10 (Booking Status: W/L 90,GNWL)
Chart NOT Prepared

Predictions

confirmMay 22 (4:28AM)IMG42390 BengaluruGaya Bodhgaya Express via SC ★★★12 corr (92% acc)
Predictions: 9
confirm: 5
rac: 4
wl: 0
PREDICT


Journey: Mon Jun 01, 2015 @ 15:19
12397/Mahabodhi SF Express (PT)        

Posted by: sanjeevgupta37   2 blog posts   9032 correct pred (74% accurate)  
PNR: 664-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl 477   |   Similar PNRs
AUBR/Anugraha Narayan Road   to   NDLS/New Delhi   |   924 km / 993 km
Entry# 1458458           
Original Status as of: May 07 (1:17PM)
Passenger 1: RAC 103 (Booking Status: RAC 110,GNWL)
Passenger 2: RAC 104 (Booking Status: RAC 111,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Yesterday (5:27PM) 
Passenger 1: RAC 68 (Booking Status: RAC 110,GNWL)
Passenger 2: RAC 69 (Booking Status: RAC 111,GNWL)
Chart NOT Prepared

Predictions

confirmMay 07 (1:18PM)sanjeevgupta37 100 corr (79% acc)
racMay 07 (1:23PM)bhanu904 corr (80% acc)
confirmMay 07 (1:24PM)ambujpathak294 corr (66% acc)
racMay 07 (1:52PM)AA Sayed 
racMay 07 (4:26PM)Mohammad Tabrez Alam*^ 238 corr (73% acc)
racMay 07 (7:20PM)Rakesh Kashyap4 corr (57% acc)
confirmMay 08 (1:12PM)maxgrow13 corr (61% acc)
confirmMay 18 (11:25AM)Harshad Pavagi19 corr (67% acc)
confirmMay 22 (4:28AM)IMG42390 BengaluruGaya Bodhgaya Express via SC ★★★12 corr (92% acc)
Predictions: 2
confirm: 2
rac: 0
wl: 0
Journey: Thu May 28, 2015 @ 14:20
12397/Mahabodhi SF Express (PT)
Entry# 1471937

PNR: 614-xxxxxxx    |   AC 2-tier - 2A   |   Tot Seats: Avbl 24   |   Similar PNRs
GAYA/Gaya Junction   to   NDLS/New Delhi   |   993 km / 993 km
Original Status as of: May 16 (11:19PM)
Passenger 1: RAC 4 (Booking Status: RAC 4,GNWL)
Passenger 2: Waitlist# 1 (Booking Status: W/L 1,GNWL)
Passenger 3: Waitlist# 2 (Booking Status: W/L 2,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 22 (4:28AM) 
Passenger 1: Confirmed (Booking Status: RAC 4,GNWL)
Passenger 2: Confirmed (Booking Status: W/L 1,GNWL)
Passenger 3: Confirmed (Booking Status: W/L 2,GNWL)
Chart NOT Prepared
Predictions: 52
confirm: 51
rac: 1
wl: 0
Journey: Tue May 26, 2015 @ 15:38
12397/Mahabodhi SF Express (PT)
Entry# 1459711

Posted by: Hatey Zilla ROHTAS Ho   243 blog posts   349 correct pred (65% accurate)
PNR: 634-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl 477   |   Similar PNRs
DOS/Dehri On Sone   to   NDLS/New Delhi   |   908 km / 993 km
Original Status as of: May 08 (11:35AM)
Passenger 1: RAC 98 (Booking Status: RAC 104,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 26 (7:38PM) 
Passenger 1: S10,69 [MB]/Coach Position:16 (Booking Status: RAC 104,GNWL)
Train Status TRAIN IS RUNNING LATE BY 06 Hour(s)
Chart PREPARED
Predictions: 13
confirm: 2
rac: 0
wl: 11
Journey: Tue May 26, 2015 @ 18:44
12397/Mahabodhi SF Express (PT)
Entry# 1486288

PNR: 654-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl >24   |   Similar PNRs
BDL/Vindhyachal   to   NDLS/New Delhi   |   717 km / 993 km
Original Status as of: May 26 (6:42PM)
Passenger 1: Waitlist# 15 (Booking Status: W/L 40,RLGN)
Passenger 2: Waitlist# 16 (Booking Status: W/L 41,RLGN)
Train Status
TRAIN IS RUNNING LATE BY 06 Hour(s)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 26 (7:51PM) 
Passenger 1: Waitlist# 9 (Booking Status: W/L 40,RLGN)
Passenger 2: Waitlist# 10 (Booking Status: W/L 41,RLGN)
Train Status TRAIN IS RUNNING LATE BY 06 Hour(s)
Chart PREPARED

45 views
May 26 (7:01PM)        

⤵UdyaN AbhA ToofaN ExpresS⤴⭐⭐ IRF LioneL⭐⭐   4460 blog posts   372 correct pred (69% accurate)    
Re# 1486288-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
bahut zyada mushKil hai

45 views
May 26 (7:02PM)        

⤵UdyaN AbhA ToofaN ExpresS⤴⭐⭐ IRF LioneL⭐⭐   4460 blog posts   372 correct pred (69% accurate)    
Re# 1486288-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
ab to nhi Hopayega
Page#    Showing 1 to 10 of 616 PNR entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site