Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Jun 25, 2017 21:26:50 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Jun 25, 2017 21:26:50 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Page#    292990 Blog Entries  next>>
  
50 minutes behind schedule....12022 marches behind a SRC WAP 4 through TATA ELS .
A new set of TATA WAG 9 can be seen at the back
  
★★★  Info Update
Dec 03 2015 (21:50)   HSR/Hisar Junction (6 PFs)

हिसार जंक्शन~   1122 blog posts   11 correct pred (58% accurate)
Entry# 1669885            Tags   Past Edits
Finally!! Got up early and planned a short trip to Rewari to providing you latest updates on RE-MHU-HSR #Electrification & #Doubling.
Board train : 54835 (HSR-RE PXGR)
Return Board train :59721 (JP-HSR FAST PXGR)
Highlights : ( Statics are in % & acc to my data )
◆◆Doubling
...
more...

●RE-KSI work almost done 99% including track laying,linking and signalling. 1% remainedmained for track linking.
●KSI-MHU work for track laying & linking is done almost 60%.Levelling work done 80%.Remaining work left 20%.
◆◆◆Overall work done 65-70%
◆◆Electrification
●Railway is setting up TSS at STD & RE
●RE-KSI work for pole basic structure is complete on both side (up-dwn) . Pole erected 70%.
●KSI-MHU work for pole basic structure is in progress
●MHU-HSR work for pole basic structure completed till Hansi (HNS) (50KM).
Pole have been erected from MHU to in between BWK-JKZ (35KM).
Wiring & OHE Eqip have been completed till BWN (14KM)
●●Work for Plateforms including increase in height and 2nd platefrom are in progress till BWK.
KSI will now have 3 Plateforms currently only have single.
●● Today i saw heavy load on RE-HSR track met with 10 WDG with 10 different Goods and Coal train
◆◆◆ IMP NEWS: RAILWAY is CONSTRUCTES A BY-PASS LINE TO IGNORE REWARI UNDER WDFC WHICH CONNECT RE-HSR SECTION TO RE-FL SECTION UNDER WDFC. A GREAT RELIEF !! (this is not confirmed news ...but i am informing you as i saw rly constructing bridge and other work just 10km before rewari on HSR-RE section)
Today's Blog Upload
●Doubling
●Electrification
●HSR-RE Pxgr - 54835
●JP-HSR Fast Pxgr - 59721
●DEE-BDTS GR - 12215
●BDTS-DEE GR - 12216
●SLN-ADI Exp - 19404
●VARIOUS WDG LOCO PICS
●Various Station pics
#Hisar

27 posts - Dec 2015

1 posts - Jan 2016

2 posts - Feb 2016

28 posts - Mar 2016

4 posts - Apr 2016

1 posts - May 2016

5 posts - Jul 2016

3 posts - Aug 2016

16 posts - Sep 2016

3 posts - Oct 2016

16 posts - Nov 2016

2 posts - Dec 2016

1 posts - Jan 2017

11 posts - Mar 2017

10 posts - Apr 2017

  
★  
2944 views
May 01 2017 (19:52)
हिसार जंक्शन~   1122 blog posts   11 correct pred (58% accurate)
Re# 1669885-136            Tags   Past Edits
Update as on 1/05/2017 :
#Doubling work reached to Manheru.Bllasted stone have been laid down over 80% of section between KSI-MHU while almost the same for rails.Where as 20% section in which in some part nothing happened yet or track linking left.
Second Plateform work is in progress at MHU,CKD and Jahrli station.
#Electrifcation work reached to MHU outer in which basic
...
more...
structure is being constructing near MHU outer.
Poles have been erected till CKD outer on both line (running line completed whereas on new line it covers almost 95%) whereas basic structure is approaching MHU.OHE mast n clips on running line till CKD and wiring has been done on both line 5 kms towards MHU to KSI
#1 - Manheru Station second PF
#2 - Jharli station second PF
#3 - Section between Kosli-Jharli
#4 - Kosli Station
#5 - Jatusana Station
#6,7,8 - Approaching Rewari where OHE is rising up to 7.5m
#9 - Bhiwani Junction and stored poles
#10 - At rewari Junction , Double stack container under High Rise OHE !

  
1811 views
May 15 2017 (12:14)
हिसार जंक्शन~   1122 blog posts   11 correct pred (58% accurate)
Re# 1669885-137            Tags   Past Edits
Wiring completed till Satrod (STD) outer on MHU-HSR stretch !!

  
839 views
Jun 08 2017 (11:05)
हिसार जंक्शन~   1122 blog posts   11 correct pred (58% accurate)
Re# 1669885-138            Tags   Past Edits
After a long halt ...work for electrification between STD-HSR have been started!!

  
456 views
Jun 14 2017 (16:37)
rohitgl   6 blog posts   1 correct pred (50% accurate)
Re# 1669885-139            Tags   Past Edits
seems It got delayed due to Electricity board DHBVN but good to see that it got started

  
0 views
Today (21:26)
हिसार जंक्शन~   1122 blog posts   11 correct pred (58% accurate)
Re# 1669885-140            Tags   Past Edits
Poles are reached near Surya Nagar Railway Crossing (outer Hisar Jn) !!
Work for TSS getting delayed because of pending approval and tendering delay from HVPNL !!
  
★★  General Travel
0 Followers
889 views
Jun 22 2017 (17:47)   12506/North East Express (PT) | KIR/Katihar Junction (7 PFs)

GSD   2853 blog posts   20364 correct pred (71% accurate)
Entry# 2329353            Tags   Past Edits
Offlink LDH WAG 7 with 12506 ANVT-GHY North East Express running 7 hrs late.
Date:- 10/06/2017
Location:- Katihar

5 posts - Fri Jun 23, 2017

  
441 views
Jun 23 2017 (22:45)
Railfans Always Rocks~   78 blog posts   92 correct pred (67% accurate)
Re# 2329353-7            Tags   Past Edits
Yes this is the only reason, BP mail is NR train and that's why it runs with priority in NCR. For all other trains, it is their offence that they are NFR trains and they have to run in two great zones ( ECR.... the brand + NCR...... the bigger brand 😂😂)
Just for fun😂, but I think NFR should do tit for tat by not giving priority to BP mail in its zone for 1 week or 15 days 😂😂.
Par NFR ki niyat saaf hai, aisa hoga nahi

  
385 views
Yesterday (00:48)
GSD   2853 blog posts   20364 correct pred (71% accurate)
Re# 2329353-8            Tags   Past Edits
NFR tries to maintain the schedule of the train, it doesn't get bias.
Even special trains are given equal priority, last time when I was travelling 12506 kept on trailing 82504 from KIR to NBQ.
At dalkhola there was a loco failure of Freight train, 82504 was made to halt at Telta on Main line for 1hr 45 mins, 12506 arrived from the back and was kept on the loop, after the line was cleared 82504 was made to depart earlier & 12506 trailed till NBQ.

  
362 views
Yesterday (02:51)
Rahul TreHan~   3599 blog posts   38 correct pred (64% accurate)
Re# 2329353-9            Tags   Past Edits
Yeah unbiased controlling is nfr's nature.
They even make Rajdhani's halt for a SF xing (line clearance) which i believe is a great approach and mindset

  
358 views
Yesterday (02:54)
Rahul TreHan~   3599 blog posts   38 correct pred (64% accurate)
Re# 2329353-10            Tags   Past Edits
Yesterday 15602 arrived CNB with 3 minutes delay ONLY! Avoided SS OT..
Also 14056 arrived CNB with 2:03 hrs delay, which speaks thats it always a toss b/w PSK and BP upto DNR, only there place changes, but delay is constant

  
229 views
Yesterday (12:46)
GSD   2853 blog posts   20364 correct pred (71% accurate)
Re# 2329353-11            Tags   Past Edits
Yeah, even the TT of these two train are in such a way that there are multiple overtakes among the two.
  
★  Info Update
0 Followers
219 views
Today (15:28)   BSB/Varanasi Junction (9 PFs)

ALI™~   1254 blog posts   2401 correct pred (66% accurate)
Entry# 2332492            Tags   Past Edits
E.Rly Recieved WAP 7 Locomotive made at DLW/Varanasi !! click here

  
208 views
Today (15:30)
➡➡Shoubhik⬅⬅^~   1126 blog posts   261 correct pred (84% accurate)
Re# 2332492-1            Tags   Past Edits
Kis Train ko mila tha yeh P7???

  
206 views
Today (15:31)
ALI™~   1254 blog posts   2401 correct pred (66% accurate)
Re# 2332492-2            Tags   Past Edits
Dhono dhanya exp. #Offline Link

  
167 views
Today (16:45)
First LHB journey in 12802 😥^~   1113 blog posts   79 correct pred (56% accurate)
Re# 2332492-3            Tags   Past Edits
Kya ye 2nd WAP 7 h Jo DLW me bana h??

  
89 views
Today (19:00)
❤️ ⚡ WAP5™ ⚡ ❤️   6560 blog posts   278 correct pred (91% accurate)
Re# 2332492-4            Tags   Past Edits
3rd

  
0 views
Today (21:26)
ALI™~   1254 blog posts   2401 correct pred (66% accurate)
Re# 2332492-5            Tags   Past Edits
Yes bro
  
General Travel
0 Followers
1074 views
Jun 17 2017 (11:59)   20889/Howrah - Vijayawada Humsafar Express

Venkat వెంకట్   3240 blog posts   1 correct pred (100% accurate)
Entry# 2323746            Tags   Past Edits
First run almost empty. Almost 800 seats empty for todays run
17-6-2017
Availability CURR_AVBL-0838
Book Now

4 posts - Sat Jun 17, 2017

12 posts - Sun Jun 18, 2017

1 posts - Mon Jun 19, 2017

  
367 views
Jun 19 2017 (19:40)
Venkat వెంకట్   3240 blog posts   1 correct pred (100% accurate)
Re# 2323746-18            Tags   Past Edits
BZA-VSKP has not that much load. Slot should have been better

  
132 views
Yesterday (09:58)
IR no more Safe^~   22501 blog posts   98963 correct pred (75% accurate)
Re# 2323746-19            Tags   Past Edits
today's run
6 coach filled 10 empty.

  
31 views
Today (20:55)
LHB Coromandal A Dream^~   6658 blog posts   8476 correct pred (74% accurate)
Re# 2323746-21            Tags   Past Edits
Already HWH YPR Humsafar was running covering the same region with better halts, but again this train on the SAME route SAME direction.
Doesn't SER have any other routes to cover. Only South India is getting more and more trains from Kolkata in recent 1 year.
SER could have started this Humsafar to North or Western India or may be to Goa also (Considering the HUGE AC load of Amaravati express).

  
9 views
Today (21:23)
Venkat వెంకట్   3240 blog posts   1 correct pred (100% accurate)
Re# 2323746-22            Tags   Past Edits
Better than running empty trains.

  
0 views
Today (21:26)
IR no more Safe^~   22501 blog posts   98963 correct pred (75% accurate)
Re# 2323746-23            Tags   Past Edits
tat of 3 days only.
so western goes eliminated.
ADI/MAO SRC will require 5 days of Up-Dn.
Page#    292990 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Jul 5
Trains with ARP 15 Dep on: Mon Jul 10
Trains with ARP 30 Dep on: Tue Jul 25
Trains with ARP 120 Dep on: Mon Oct 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.