Can The Entire CSTM Station(Platform Areas & Numbers, Line Alignments, Relocation Of Trip Shed) Be Rebuilt To Increase Operational Capacity Barring The Heritage Structure If Possible?
The Platform Numbers Can Be Increased On The P'Dmello Road Side.
The Length Of Platforms Can Also Be Increased By Laying It Deeper Into The Waiting Hall Areas.
Is This Possible?