Little change over done.
Now the train has been sent to Katni Jn.,so that Loco change could be done.
If it would have been bypassed via KTES , then the Loco change would have been needed to be done at BSP.
So for speedy change over from Diesel to Electric, train is sent through Katni Jn with a Rake Reversal.