Thanks. But aren't all new lines designed with ROBs and RUBs, so that level crossings are totally eliminated? Also for NH16 if they construct level crossing, then that will be huge setback to the NH as I have seen it to be a 4 lane highway. Anyway, hopefully they build a bridge, which again will take a lot of time to finish, hence the line may be delayed.