Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Mar 26, 2017 09:01:26 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Mar 26, 2017 09:01:26 IST

Blog Entry# 2073582  
Posted: Nov 28 2016 (09:22)

183 Responses
Last Response: Dec 09 2016 (13:54)
  
★  Rail News
0 Followers
9626 views
Commentary/Human InterestSWR/South Western  -  
Nov 28 2016 (07:09)   Bengaluru, Karwar day train to be partially cancelled

rdb*^   127109 news posts
Entry# 2073582   News Entry# 286968         Tags   Past Edits
The Yeshwantpur-Karwar Tri-Weekly Express would be cancelled between Mangaluru Junction and Karwar since the train has less than 20 per cent occupancy, limiting its operation between Yeshwantpur and Mangaluru Junction.
Konkan Railway Corporation (KRCL), which handles the train between Mangaluru and Karwar and the South Western Railway (SWR), which owns the train, have sent proposals to the Railway Board.
KRCL’s Chief Public Relations Officer L.K. Verma told The Hindu that the issue was discussed in the recent KRCL’s Users Consultative Committee meeting. Since the train had less than 20 per cent occupancy, it
...
more...
was recommended to cancel the train between Mangaluru Junction and Karwar, he said.
After the partial cancellation, the train should be speeded up to provide faster services between Bengaluru and Mangaluru, demanded Sudarshan Puttur, Organiser of Kukke Shree Subrahmanya-Mangalore Railway Commuters Forum. The South Western Railway should also re-route the train via Kunigal and Solur once the Bengaluru-Hassan direct line is commissioned.
Leaving Yeshwantpur at 7 a.m., the train reaches Mangaluru Junction (390 km) at 5.40 p.m. with an average speed of 40 kmph. While it takes 2.10 hours to cross the 55 km ghat stretch between Sakleshpur and Subrahmanya Road at 26 kmph, it takes 2.25 hours to cover 44 km on plain land between Kabaka Puttur and Mangaluru Junction at 19 kmph.
West Coast Railway Yatri Sangha president G. Hanumanth Kamath said, “It is not difficult for the Railways to cut down the running time between Bengaluru and Mangaluru and operate it on the lines of the Bengaluru-Hubballi Jan Shatabdi.”
Sources in the South Western Railway said that at present, the train would run as tri-weekly only after the partial cancellation.

6 posts - Nov 2016

2 posts - Thu Dec 01, 2016

10 posts - Fri Dec 02, 2016

31 posts - Sat Dec 03, 2016

12 posts - Sun Dec 04, 2016

25 posts - Mon Dec 05, 2016

42 posts - Tue Dec 06, 2016

39 posts - Wed Dec 07, 2016

11 posts - Thu Dec 08, 2016

  
986 views
Dec 08 2016 (20:01)
GOA SK TO VSG~   6215 blog posts   613 correct pred (67% accurate)
Re# 2073582-190            Tags   Past Edits
If that happens than it's well and good. It's time they think about ammending those Ghat rules too those are obstructing development here.
One rule I wish that is ammended is coach restrictions 24 coach trains should be allowed here if not all than atleast the 2 I mentioned above.
I want SWR to strongly prove that my screen name is Totally wrong. Lol.

  
1012 views
Dec 09 2016 (10:08)
Mangaluru deserves to be division~   4105 blog posts   306 correct pred (68% accurate)
Re# 2073582-191            Tags   Past Edits
Freight derailment means wagons falling into the bridges/gorge not engine or guard cabin, Same cannot be considered for pax trains, more or less 70 people per coach lives will be as risk.

  
1018 views
Dec 09 2016 (13:08)
GOA SK TO VSG~   6215 blog posts   613 correct pred (67% accurate)
Re# 2073582-192            Tags   Past Edits
And how is it that locos will stay on the tracks 100 percent if locos derail than LPs will be at risk too. But earlier 22 coach trains were running fine here. No incident happened. Sometimes 22 coach Amaravati express used to run with one HCPV too and that too with Alcos as bankers and operations were fine but now on upgrading Bankers to EMDs they brought down to 20. Instead of upgrading the route to accommodate 24 coach trains from 22 they went step back to 20.
Isn't that downgrade ?
Problem
...
more...
with SWR is they have no interest in improving passenger services here even doubling is undertaken with Port connectivity in mind.
How long does it takes to upgrade just a 26 kilometers of route to accommodate 24 coachers. More than 13 years ?
SWR formed in 2003 since then only two trains introduced by them on this route and two weeklies ie. VSG MAS and VSG VLKN. Amaravati express to Howrah was demanded by SER and only because Mamta Didi it got extended with one day frequency increase.
So SWR track record in 13 years is only two weeklies introduced on VSG LD route and downgrade coach capacity from 22 to 20 instead of upgrade to 24.
Whereas rest in India zones are planning to go 26 coaches.

  
976 views
Dec 09 2016 (13:47)
Hyderabad Karnataka needs a dedicated train to SBC*^~   9622 blog posts   497 correct pred (74% accurate)
Re# 2073582-197            Tags   Past Edits
VSG MAS was proposed by SCR and all the ground works were by them but it got introduced after SWR formation. The year of introduction of VSG MAS was in 2003 , whereas SWR was formed in 2003 too ! Trains after 2004 are SWR

  
1017 views
Dec 09 2016 (13:54)
GOA SK TO VSG~   6215 blog posts   613 correct pred (67% accurate)
Re# 2073582-200            Tags   Past Edits
So than SWR introduced only one new train on LD VSG route that too weekly.
Can't credit SWR for Amaravati express extension to Howrah and frequency increase from 3 to 4 days as it was proposed most probably by SER and Mamta Didi was RM so that was a sure shot one.
But SWR is definitely responsible for its downgrade from SF to M/E and now from 18 coacher to 17 coach one.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Apr 5
Trains with ARP 15 Dep on: Mon Apr 10
Trains with ARP 30 Dep on: Tue Apr 25
Trains with ARP 120 Dep on: Mon Jul 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site