Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Feb 20, 2017 21:06:14 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Feb 20, 2017 21:06:14 IST

Blog Entry# 2084444  
Posted: Dec 08 2016 (17:36)

12 Responses
Last Response: Dec 09 2016 (22:43)
  
General Travel
0 Followers
1529 views
Dec 08 2016 (17:36)   VSKP/Visakhapatnam Junction (8 PFs)

Guest: 81eb314e   show all posts
Entry# 2084444            Tags   Past Edits
ECoR proposes ‘Bulb Line’ near Vizag Railway station
click here
MY STRICT FEELING IS CM SHOULD NOT ACCEPT BULB LINE .

7 posts - Thu Dec 08, 2016

  
1100 views
Dec 08 2016 (18:38)
Guest: 81eb314e   show all posts
Re# 2084444-8            Tags   Past Edits
anna bulb line is not possible navy and port will oppose due to security reasons.

  
932 views
Dec 09 2016 (09:33)
Venkat వెంకట్   2197 blog posts
Re# 2084444-9            Tags   Past Edits
let them start some thing. Even 3rd line ki kuda 104 area daggara problem

  
960 views
Dec 09 2016 (09:48)
deepakyerr~   773 blog posts
Re# 2084444-10            Tags   Past Edits
The bulb line will be over ground 3rd and 4th line parallel to present lines on right side of the present lnes in port railway slidings pass under convent flyover and track raises to flyover over port roads and lands before the entrance (south side) of present chavulamandam bridge. So the height of bridge can also be raised by 1.5m and submergence of road under bridge can also be prevented. By this running time I'll not decrease but loco reversal can be averted and stoppage ill be decreased by 10mins. In I'll not hurt rly importance of station in any way as it continue to serve as catering station crew change and watering.this line I'll run totally on port lines and area and no way nearer to defence lands. As the proposal was bought by ECOr it may see some light and they may do detailed studies about the project. It...
more...
some one proposes from outside it I'll not be taken by IR.

  
858 views
Dec 09 2016 (10:14)
Venkat వెంకట్   2197 blog posts
Re# 2084444-11            Tags   Past Edits
ya ecor has that kind of working style. IF they propose one they will do it as soon as possible. The same they done for Simhachalan north bypass towards duvvada also they did in no time.

  
810 views
Dec 09 2016 (22:43)
Tapan Sharma~   195 blog posts   1 correct pred (100% accurate)
Re# 2084444-12            Tags   Past Edits
Bulb line means??

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 2
Trains with ARP 15 Dep on: Tue Mar 7
Trains with ARP 30 Dep on: Wed Mar 22
Trains with ARP 120 Dep on: Tue Jun 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site