Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Mon Sep 22, 2014 03:41:33 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video    Post a Train TipPost a Train Tip    Post a Station TipPost a Station Tip    Super Search
Topics:    Filters:

Blog Entry# 363886  
Posted: Mar 04 2012 (9:54AM)

9 Responses
Last Response: Mar 04 2012 (10:56AM)
0 Followers
1119 views
Mar 04 2012 (9:54AM)   12907/Maharashtra Sampark Kranti Express        
 

S V Iyer*^   8942 blog posts   12074 correct pred (64% accurate)  
Entry# 363886               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
this train shd b extended upto Pune via BSR - KYN. Also slack tym shd b reduced given that it halts at just 3 - 4 stops.
It can depart pune at 15.45 hrs to reach BSR at 19.45 hrs and thereafter follow Tvc - Nzm Raj reaching Nzm by 14.00 hrs.

1072 views
Mar 04 2012 (10:06AM)        

laughing for nothing**   4739 blog posts   111 correct pred (51% accurate)  
Re# 363886-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Pune already has a duronto to nzm also mah sk enjoys good patronage so why divert it?

1078 views
Mar 04 2012 (10:09AM)        

Mumbai Chennai Duranto Varum ana Varadhu   28 blog posts   29 correct pred (78% accurate)  
Re# 363886-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Boss somehow convey that it was laloo who had cancelled it. In a jiffy it will be restored on 14th mar, ha ha ha

1058 views
Mar 04 2012 (10:09AM)        

Guest: 7cfff67c   show all posts
Re# 363886-3               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Ok..frm 2mrw dis rail gadi wl cme 2 poona

1058 views
Mar 04 2012 (10:14AM)        

laughing for nothing**   4739 blog posts   111 correct pred (51% accurate)  
Re# 363886-4               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Sir pune indore and pune jaipur exp also dep from pune around this time and hence it would not be possible to share path

1031 views
Mar 04 2012 (10:24AM)        

S V Iyer*^   8942 blog posts   12074 correct pred (64% accurate)  
Re# 363886-5               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Yes Pune NZm has so many trains and even a drnt, so does so many trains runs betwn BCT- NDLS (2 rajs, 2 GRs, 1 drnt etc)... from Northe Esatern Suburbs in the KYN are ppl do not hav any train which will tak them to NDLS in less than 20 hrs and to catch Rajs and GR they have to travel 2 hrs or so to reach BCT or BDTS or BSR ... only Maharastra SK if ext upto PUNE via KYN then it will ease the troubles...

1017 views
Mar 04 2012 (10:31AM)        

laughing for nothing**   4739 blog posts   111 correct pred (51% accurate)  
Re# 363886-6               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
U have a valid point there sir but it can be solved by making a halt at kyn for the ltt hardwar ac exp

992 views
Mar 04 2012 (10:45AM)        

laughing for nothing**   4739 blog posts   111 correct pred (51% accurate)  
Re# 363886-7               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
I dont know about the demand from kyn to ndls but another option is to extend the lashkar exp uptill nzm

988 views
Mar 04 2012 (10:49AM)        

S V Iyer*^   8942 blog posts   12074 correct pred (64% accurate)  
Re# 363886-8               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
LTT haridwar Exp also takes 24 Hrs (add to it NO PC in the train)... Better Ppl would travel all the way upto BCT and travel by Raj / GR = 2 hrs travel + 17 hrs travel = 19 hrs ... (better than 24 hrs).. However it is inconvenient and will still be as is the case with IR

971 views
Mar 04 2012 (10:56AM)        

laughing for nothing**   4739 blog posts   111 correct pred (51% accurate)  
Re# 363886-9               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Has Wr announced any summer specials on this route

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Oct 2, 2014
Trains with ARP 30 Dep on: Wed Oct 22, 2014
Trains with ARP 60 Dep on: Fri Nov 21, 2014

  
  

Rail News

New Trains

Site Announcements

  • Entry# 1209120
    Sep 07 (03:36PM)


    -@all members: This is an IMPORTANT reminder to all members that NO MONETARY transactions are permitted within the scope of IRI. Members are NOT ALLOWED to borrow/lend money to each other, book rail tickets for each other, introduce themselves as "IRI Members/Admins" and solicit monetary favours, asking to book rail tickets...
  • Entry# 1204822
    Sep 02 (07:04PM)


    With the roll out of new TTs, we are introducing 3 new enhancements: . 1. "To Be Introduced" trains: As the title implies, Admins may add Trains that are announced in the Budget and Not yet introduced, to this list, with WHATEVER tentative TT is available, and whatever sketchy or vague information...
  • Entry# 1193896
    Aug 21 2014 (10:23PM)


    The new IRI logo can now be seen. Actually, we are reluctant to make changes to the logo (for the sake of recognizability and consistency), but some very slight modification was done this time. Here is the post-facto rationalization of the logo: . 1. The Chakra is the Wheel symbolizing Transportation/Travel which...
  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
Scroll to Top
Scroll to Bottom