Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu May 2 06:11:12 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 5893062
Posted: Nov 25 2023 (11:34)

11 Responses
Last Response: Nov 26 2023 (11:24)
General Travel
54508 views
7

Nov 25 2023 (11:34)   12713/Satavahana SF Express | BZA/Vijayawada Junction (10 PFs)
NaagendraV
NaagendraV   290 blog posts
Entry# 5893062            Tags   Past Edits
1 compliments
Useful
List of new railway line/ routes at various states in SCR 2023-24.
-----------------------------------------------------------------------------------------------------------------------
SCR - Andhra Pradesh*************************

Preliminary Engineering cum Traffic Survey for byepass line connecting Vijayawada-Machilipatnam
section
...
more...
to (Vijayawada--Gudur section for Visakhapatnam traffic bound for Chennai and viceversa and thus avoiding Vijayawada Jn. (49 km)

Reconnaissance Engineering cum Traffic Survey for new line between Darsi and Narsaraopet (65 km)
Reconnaissance Engineering cum Traffic Survey for new line between Narsapur-Machhlipatnam ( 85km )
Reconnaissance Engineering cum Traffic Survey for Dharmavaram-Bellari new line (120 km)
Reconnaissance Engineering cum Traffic Survey for Mantralayam Road-Kurnool new line (110 km)

Final Location Survey for new line between Vijayawada- Guntur via Amaravati (106 km)
Final Location Survey for Doubling of Dharmavaram – Pakala – Katpadi (290 Km)
Final Location Survey for Doubling of Guntur – Bibinagar (248 Km)
RET survey for Muddanuru-Mudigubba new line (65Km)
Final Location Survey for doubling of Gooty-Pendakallu line (29 Km)
Final Location Survey for doubling of Pakala-Tirupatiline (42 Km)
Final Location Survey for proposed tripling bet. OBVP GTL
Final Location Survey for tripling between Renigunta-Gudur
Final location survey for tripling between Samalkot and Nidadavolu (72 Km)
Final Location Survey for 3rd line between BZA-NDD
Final Location Survey for Doubling Nallapadu-Krishna Canal (3rd and 4th Line) (33.62 kms.)
Final Location Survey for 3rd line between Vijayawada and Duvvada (335 km)

-----------------------------------------------------------------------------------------------------------------------------

SCR -Telangana: ************************************
1.Preliminary Engineering cum Traffic Survey for new line betwen Bodhan-Bidar (100 km)
2.Preliminary Engineering cum Traffic survey for third line between Secunderabad-Kazipet (134 km)
3.Preliminary Engineering cum Traffic Survey for doubling of Parbhani to Parli (67 km)
4.Preliminary Engineering cum Traffic Survey for byepass line at Purna (3 km)
5.Preliminary Engineering cum Traffic Survey for doubling of Secunderabad- Mudkhed- Adilabad (420km)
6.Preliminary Engineering cum Traffic Survey for Balharshah-Kazipet 4th line (234 km)
7.Preliminary Engineering cum Traffic Survey for Kazipet- Vizayawada 4th line (219 km) --

8.Reconnaissance Engineering cum Traffic Survey for Siddipet - Akkanapet (50 km)
9.Reconnaissance Engineering cum Traffic Survey for new line between Mancherail - Adilabad via Utrfoor (186 km)
10.Reconnaissance Engineering cum Traffic Survey for new line of Dornakal - Miryalguda (133 km)
11.Reconnaissance Engineering cum Traffic Survey for new line between Ghanpur and Surya via Palakutri, Kodakandla (170 km)
12.Reconnaissance Engineering cum Traffic Survey for new line between Kothagudem and Kirandul (180 km)
13.Reconnaissance Engineering cum Traffic Survey for new line between Bodhan - Biloli- Mudkhed-Jalkot- Latur Road (130 km)
14.Reconnaissance Engineering cum Traffic Survey for new line between Yavatmal-Adilabad via Ghantiji, Pandharkavadan, Chankha (100 km)
15.Reconnaissance Engineering cum Traffic Survey for new line between Patancheru - Sangareddy - Jogipet - Medak (95 km)
16.Reconnaissance Engineering cum Traffic Survey for new line between Nizamabad-Nirmal-Adilabad (125 km)
17.Reconnaissance Engineering cum Traffic Survey for new line between Manakondur - Huzurabad and Elkaturchi (60 km)
18.Reconnaissance Engineering cum Traffic Survey for new line between Karkheli-Narsi (30 km)
19.Reconnaissance Engineering cum Traffic Survey for new line between Bijapur and Warangal (288 km)
20Reconnaissance Engineering cum Traffic Survey for new line between Yavatmal-Adilabad via Ghantji- Pandharkavda-Chanakha (100 km)

21.Final Location Survey for new line between Bidar and Nanded (155 km)
22.Final Location Survey for doubling of Moulali-Sanathnagar line (21 Km)
23.Final Location Survey for doublin of Motamari- Vishnupuram line (89 Km)
24.Final Location Survey for Doubling of Dornakal-Manuguru line (104 Km)
25.Final Location Survey for Doubling betwwen Aurangabad and Ankai (98 Km) with bypass at Ankai
26.Final Location Survey for Doubling Secunderabad (SC)-Sanathnagar (S.NoF) 3rd line (19.18 kms.)
27.Final Location Survey for Doubling Secunderabad - Kazipet (85.48 kms.
28.Final Location Survey for Doubling Shankarpalli- Chittaguda (3rd and 4th Line) (19.22 kms.)
29.Final Location Survey for Doubling Sulehalli-Malkhaidroad (3rd and 4th Line) (17.18 kms.)
30.Final Location Survey for Doubling Tandur-Nawandgi(3rd and 4th Line) (18.95 kms.)
31.Final Location Survey for Doubling Vikarabad-Dharur (3rd and 4th Line) (22.27 kms.)
32.Final Location Survey for new line between Manuguru -Ramagundam
33.Final Location Survey for Bodhan-Bidar via Banswada New Line (138 Km)
34.Final Location Survey for Bye-pass line at Purna Jn to connect Purna-Akola line to Manmad-SC line (3.05 km)
35.Final Location Survey between Gangakher -Vadaganilla (DL)
36.Final Location Survey between Parbhani - Pokarni narasimha (DL)
37.Final Location Survey between Pokarni narasimha -Gangakher(DL)
38.Final Location Survey between Vadaganilla - Parli(DL)
39.Final Location Survey for 3rd line between SC-KZJ
40.Final Location Survey for 3rd line between SC-Wadi
41.Final Location Survey for 3rd line between SLODuvvada
42.Final Location Survey for Doubling Bhongir (BG)-Bibinagar (BN) 3rd Line (15 kms.)
43.Final Location Survey for Doubling Bhongir-Aler (3rdand 4th Line) (24.4 kms.)
44.Final Location Survey for Doubling Chitgidda (CTF) -Vikarabad (VKB) 3rd Line (9.93 kms.)
45.Final Location Survey for Doubling Dharur (DRR) -Tandur (TDU) 3rd Line (20.64 kms.)
46.Final Location Survey for Doubling Ghanpur-Raghunathpalli (3rd and 4th Line) (17.2 kms.)
47.Final Location Survey for Doubling Ghatkesar- Bibinagar (3rd and 4th Line) (14.25 kms.)
48.Final Location Survey for Doubling Kazipet-Ghanpur(3rd and 4th Line) (21.25 kms.)
49.Final Location Survey for Doubling Lingampalli-Shankarpalli (3rd and 4th Line) (22.29 kms.)
50.Final Location Survey for Doubling Nawandgi (NAW)- Malkhaid Road (MQR) 3rd Line (29.5 kms.)
51.Final Location Survey for Doubling Nizamabad Station(8 kms.)
52.Final Location Survey for Doubling Raghunathpalli(RGP)-Aler (ALER) 3rd Line (28 kms.)
53.Final Location Survey for Doubling Sanathnagar(S.NoF) -Lingampalli (LPI) 3rd Line (14.12 kms.)
54.Final Location Survey for Doubling of Akola – Dhone
via Purna, Mudhkhed, Secunderabad, Mehboobnagar
excluding Purna – Mudkhed and Bolarum –
Mehboobnagar including Dhone bye-pass (626 Km)

#Scr #SCRrailway #scrinfra
Please find the source as an attachment.

Translate to English
Translate to Hindi

6 Posts

24983 views
2

Nov 26 2023 (05:38)
NaagendraV
NaagendraV   290 blog posts
Re# 5893062-7              
Bro, e document financial year(2023-24) starting lo prepare chesindhi anukunta. document mottam lo Revised estimates unnai. pls see the attachment.
Translate to English
Translate to Hindi

20426 views
0

Nov 26 2023 (06:32)
NaagendraV
NaagendraV   290 blog posts
Re# 5893062-8               Past Edits
No.we are lived in such assumptions till now. since 1966 onwards importance/high priority given to Hyd,SC and nanded division, jurisdiction only and their needs. Requesting you to go through the previous railway budgets and proposal from SCR.
Translate to English
Translate to Hindi

20817 views
0

Nov 26 2023 (06:35)
NaagendraV
NaagendraV   290 blog posts
Re# 5893062-9              
if you considered high priority given to Andhrapradesh then from 1966 to till now under BZA,GTL why SCR constructed only one new lines. Krishnapatnam port to obulavaripalle, this project progress tracked by venkaiah naidu as a vice president. this track is used for goods transport now. except this i don't see any new routes/tracks/railwaylines.
Translate to English
Translate to Hindi

27174 views
1

Nov 26 2023 (10:37)
ssastronaut~
ssastronaut~   920 blog posts
Re# 5893062-10              
SCR should have more accurate.
25. Tenders allocation is in process for Aurangabad-Ankai doubling work.
# Final Location Survey is going for Aurangabad-Parbhani doubling.
Translate to English
Translate to Hindi

17614 views
0

Nov 26 2023 (11:24)
NaagendraV
NaagendraV   290 blog posts
Re# 5893062-11               Past Edits
This document may prepared beginning of the financial year 2023-24 post budget allocation. now almost, we are in last quarter of the financial year so might not have the latest Status.
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

4466128 ★★★ 105AvishekRay~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy