The Jalandhar - Jammu Tawi- Udhampur Electrification is with CORE, Ambala. Of the total 275 km, 178 km has been energized and balance is 97 km yet to be energized. The 178 km has been most probably energized to 2.2 kV and not the full 25 kV (also known as "Anti Theft Energization").