Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat May 4 00:12:05 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Filters:

Blog Posts by gattanimdl
Page#    8 Blog Entries  <<prev  
General Travel
1094 views
1

Oct 27 2015 (14:09)  
 
gattanimdl
gattanimdl   9 blog posts
Entry# 1630152              
KNOW - IMPORTANT RULES REGARDING - CHANGE IN THE NAME OF PASSENGER HOLDING CONFIRMED RESERVATION
1. Save as otherwise, a berth or a seat reserved in the name of a person shall be used only by the person and shall not be transferable to any other person.
2. Chief Reservation Supervisor of important stations are authorized by Railway Administration to permit the change of name of a passenger having a seat or berth reserved in his name in the following circumstances namely :
(a)
...
more...
Where the passenger is a Government Servant, proceeding on duty and appropriate authority, makes a request in writing 24 hours before the scheduled departure of trains
(b) Where the passenger makes a request in writing 24 hours before the scheduled departure of the train that the reservation made in his name may be transferred to another member of his family, meaning, Father, Mother, Brother, Sister, Son, Daughter, Husband and Wife.
(c) Where the passengers are students of a recognized educational institution and the Head of the institution makes a request in writing 48 hours before the scheduled departure of the train, that the reservation made in the name of any student be transferred to any other student of the same institute.
(d) Where the passengers are members of a marriage party and any person deemed to be Head of such party makes a request in writing 48 hours before the scheduled departure of the train that the reservation made in the name of any member of the marriage party be transferred to any other person.
(e) Where the passengers are a group of cadets of National Cadet Corps and any officer who is the head of the group, makes a request in writing at least 24 hours before the departure of the train that the reservation made in the name of any cadet be transferred to any other cadet.
Such request will be granted only once. Regarding item no. (c), (d) and (e), such request for change in excess of 10% of the total strength of group shall not be granted.
Source - Indianrail.gov.in

Translate to English
Translate to Hindi
General Travel
1122 views
2

Oct 17 2015 (13:40)  
 
gattanimdl
gattanimdl   9 blog posts
Entry# 1620057              
15-10-2015 11:08 via Allintitle:Indore - Google News
Indore-Mhow GC work to be completed by Feb
Free Press Journal
Indore : Western Railway General Manager GC Agrawal has said that the Indore-Mhow Gauge Conversion (GC) would be completed by February 2016, after which it will be open to public. However, the railway is keeping a close watch over the quality of ...
Translate to English
Translate to Hindi
General Travel
831 views
0

Oct 14 2015 (13:32)  
 
gattanimdl
gattanimdl   9 blog posts
Entry# 1616724              
Rly fails to honour own promise over construction work
— By MANISH UPADHYAY | Oct 14, 2015 01:55 am
Indore : The very slow pace of the significant construction work of railways, associated with the development of local facilities are breaking irritation among the local citizens. All the projects including construction of two island platforms, Platform no.1, connection with Laxmibai Nagar and Indore-Mhow gauge conversion, are directly associated with the augmentation of the long awaited facilities. But importantly, the railway fails to honor its own promise of completion of work.
Beside
...
more...
the facility to the passengers, the projects are directly linked with the elevation of the revenue to the railways too. Ironically the responsible officers are keeping the lackluster attitude. In view of the increasing trains’ movements from the local railway station and inability to extend them further due to the shortage of the platforms, it was decided to develop 2 new island platforms at old goods shade close to Bal Vinay Mandir. The construction of the island platforms were started from January 1, 2014 and the scheduled time limit for completion of them was June 30, 2015. But despite of crossing the time limit by 20 months, the platforms are still un-complete. According to sources, still both platforms yet not could be linked with the main line, signaling and electric work yet to complete, that could take another at least 2 months.
The gauge conversion work of 22km long Indore-Mhow is still un-complete, while the mage block for the GC work was taken on February 7 this year. It was announced to complete the GC work in 6 month, i.e. by July 7. The fact is around 30% work is still un-complete, including change of rails, signaling and electric work. This is also the fact that before taking the mega block about 30% work was completed and there is no major bridge to construct. Though, the mega block of the section had to be taken from November 1, 2014, but then DRM L. Venkataraman took the objection and said that it will hamper the revenue of the Ratlam Division.
Same time the BG work of the platform no. 1 was also started and that too completed by July 7. But the fact is that though the civil work is about to complete but the signaling and electric work is still un-complete.
PRO did not respond
When Jitendra Kumar Jayant, PRO of Ratlam Division, was contacted to get the official version, but he did not receive the call.

Translate to English
Translate to Hindi
Page#    8 Blog Entries  <<prev  

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy