Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Feb 25, 2017 03:20:14 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Feb 25, 2017 03:20:14 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Selva Vignesh*^
Page#    3140 Blog Entries  next>>
  
Timeline
0 Followers
54 views

SGNR HS Inaugural 27 Feb^~
Feb 14 2017 (11:21)
Many halts which are updated as regular are technical halts only.
Feb 13 2017 (19:05)   Bikaner - Rameswaram Pilgrim Special/00476   Train - Time-Table

Selva Vignesh*^   1174 Conf TLs   1 Void TLs
Train Name: Bikaner - Rameswaram Pilgrim Special
Departure Days: Wed
Classes: II SL
Type: Exp
First Departure: Wed Feb 15, 2017
Last Departure: Wed Feb 15, 2017
BKN 14:50; MTD 17:20 17:40; JU 19:10 19:30; MJ(P) 22:10 22:10; ABR 02:25 02:35; PNU(P) 03:42 03:42; GER(P) 06:48 06:48; ST(P) 11:22 11:22; BSR 15:55 16:00; LNL 19:48 19:50; PUNE 21:25 21:35; SUR 02:40 02:50; WADI 06:20 06:25; GTL 12:30 12:45; RU 19:00 19:50; JTJ 23:10 23:15; MDU 05:20 05:40; RMM 08:45 ;
TT Source: Manual Update/Copy-Paste

Feb 13 2017 (19:00)   (previous value)
Timeline Entry# 1189705
by: Selva Vignesh*^
Train Name: Bikaner - Rameswaram Pilgrim Special
Departure Days: Wed
Classes: II SL
Type: Exp
First Departure: Wed Feb 15, 2017
Last Departure: Wed Feb 15, 2017
BKN 14:50; MTD 17:20 17:40; JU 19:10 19:30; MJ(P) 22:10 22:10; ABR 02:25 02:35; PNU(P) 03:42 03:42; GER(P) 06:48 06:48; ST(P) 11:22 11:22; BSR 15:55 16:00; PUNE 21:25 21:35; GTL 12:30 12:45; RU 19:00 19:50; JTJ 23:10 23:15; MDU 05:20 05:40; RMM 08:45 ;
TT Source: Manual Update/Copy-Paste

  
96 views
Feb 14 2017 (00:24)
SGNR HS Inaugural 27 Feb^~   78738 blog posts   5089 correct pred (78% accurate)
Re# 2163523-1            Tags   Past Edits
Wrong update because you added even technical halts as regular ones.
It should be void
  
General Travel
0 Followers
756 views
Feb 02 2017 (18:01)  

SGNR HS Inaugural 27 Feb^~   78738 blog posts   5089 correct pred (78% accurate)
Entry# 2149233            Tags   Past Edits
Passenger continue to suffer in Humsafar
Itni buri publicity ho Rahi hai ki logo ko Humsafar Naam se hi irritation ho Rahi hai

20 posts are hidden.

  
227 views
Feb 02 2017 (23:36)
Selva Vignesh*^   7879 blog posts   181 correct pred (71% accurate)
Re# 2149233-21            Tags   Past Edits
Y difficult to maintain AC exp at RMM?!

  
234 views
Feb 02 2017 (23:41)
WELCOME JBP ET OHE OMG 😲 AGAIN~   10688 blog posts   14 correct pred (46% accurate)
Re# 2149233-22            Tags   Past Edits
Ek b ac train nhi dkhi rmm m ie why
If no problem then jbp rmm hs 😎
  
General Travel
0 Followers
766 views
Feb 02 2017 (11:05)   12851/Bilaspur-Chennai Central Weekly SF Express (PT) | DURG/Durg Junction (6 PFs)

Selva Vignesh*^   7879 blog posts   181 correct pred (71% accurate)
Entry# 2148725            Tags   Past Edits
Demand to extend Bilaspur Chennai Express to RMM
रेल बजट में ट्विनसिटीवासियों के उम्मीदें टूटी
रेल बजट में इस बार ट्विनसिटी के लोगों को न कोई सौगात मिली और न ही उनकी मांगे पूरी। नई ट्रेन का कोई प्रस्ताव ही नहीं था। लोग ट्रेनों का स्टॉपेज, विस्तारीकरण और सुविधाएं ब़ ढाने की मांग करते रहे हैं लेकिन हासिल कुछ नहीं हुआ। एक फरवरी को रेल मंत्री सुरेश प्रभु ने रेल बजट पेश किया तो लोगों की निगाहें टिकी रहीं
दुर्ग।ब्यूरो
...
more...

रेल बजट में इस बार ट्विनसिटी के लोगों को न कोई सौगात मिली और न ही उनकी मांगे पूरी। नई ट्रेन का कोई प्रस्ताव ही नहीं था। लोग ट्रेनों का स्टॉपेज, विस्तारीकरण और सुविधाएं ब़ ढाने की मांग करते रहे हैं लेकिन हासिल कुछ नहीं हुआ।
एक फरवरी को रेल मंत्री सुरेश प्रभु ने रेल बजट पेश किया तो लोगों की निगाहें टिकी रहीं लेकिन बाद में निराशा ही हाथ लगी। पिछले साल रेल बजट में जो घोषणाएं हुई थीं वह अभी भी अधूरा ही है। दुर्ग स्टेशन को मॉडल स्टेशन का दर्जा मिलने के बाद भी बजट में कोई तवज्जों नहीं दी गई। इस स्टेशन पर महीने में 60 हजार लोगों का आना-जाना लगा रहता है। भिलाई पावर हाउस स्टेशन एवं भिलाई-3 में सुविधाएं ब़ ढाने की जरूरत है।
इन घोषणाओं पर नहीं हुए काम
रेलवे अस्पताल के लिए दुर्ग में अब तक जगह चयन नहीं हो पाया। तीसरी रेल लाइन का काम अधूरा है। रायपुर नाका गेट पर अंडरब्रि ज बनना शुरू नहीं हुआ। दुर्ग से रायपुर तक हाई स्पीड ट्रेन चलाने की घोषणा पर उस लायक ट्रेक ही नहीं बनाया गया है। एक्सेलेरेटर व लिफ्ट का काम अधूरा है। मल्टीफंक्शनल कॉपलेक्स बना पर शुरू नहीं हुआ है।
ये थी यात्रियों की मांग
- दुर्ग से बोकारो सुपरफास्ट एक्सपे्र स चलाई जाए।
- कामाख्या एक्सप्रेस, कुर्ला भुनेश्वर एक्सप्रेस का स्टापेज दुर्ग में देना।
- हटिया कुर्ला एक्सप्रेस, समरसता एक्सप्रेस को नियमित चलाने।
- रायपुर-गोंदिया-बालाघाट-तिरूपति लिंक एक्सप्रेस शुरू करने।
- दुर्ग-गुवहाटी एक्सप्रेस शुरू करने।
- बिलासपुर चेन्नई के फेरे रामेश्वरम तक ब़ढाने।
- दुर्ग से नंदिनी तक मेमू ट्रेन चलाने।
- दुर्ग स्टेशन पर सीसीटीवी कैमरा लगाने।
- ट्रिब्यूनलकोर्ट को मप्र से राजधानी लाने की मांग
ये है रेल बजट पर प्रतिक्रि या
'हमारे जोन का पैसा दूसरे जोन में खर्च किया जाता है। बजट में दुर्ग भिलाई को कुछ नहीं मिला। इसलिए इस पैसे को जाने से रोकना चाहिए।'
-संजय बोहरा, महासचिव दुर्ग भिलाई रेल यात्री संघ
'ट्रिब्यूनल कोर्ट मध्यप्रदेश में है। इसे राजधानी लाने की मांग की गई थी। बजट काफी निराशाजनक रहा।'
-पवन बड़त्याजा, प्रदेश मंत्री चेम्बर ऑफ कामर्स
'हर वर्ग की सुविधा के साथ हर मार्ग पर ट्रेन का विस्तारीकरण होना चाहिए। तीन साल से प्रस्ताव दे रहे,भाजपा सरकार इस पर अमल नहीं करती।

  
554 views
Feb 02 2017 (11:11)
Venkat వెంకట్   2256 blog posts
Re# 2148725-1            Tags   Past Edits
ya better...return it runs almost empty.

  
603 views
Feb 02 2017 (11:24)
Boxer Bhai~   38154 blog posts   12668 correct pred (61% accurate)
Re# 2148725-2            Tags   Past Edits
Raipur gondia balaghat tirupati link exp

2 posts are hidden.

  
562 views
Feb 02 2017 (11:34)
IR RAILS On SAIL BHILAI TRACKS~   2004 blog posts   126 correct pred (68% accurate)
Re# 2148725-5            Tags   Past Edits
ये पेपर वाले कुछ भी अंत शंट छापटे है दुर्ग में बहुत पहले से सीसीटीवी लग चुका है और मांग
दुर्ग से गया वाया बोकारो की गयी है
समरसता का टाइम ज्ञानेश्वरी के साथ है नियमित किसलिए मांगे दोनों तो एक ही ट्रेन है इसमें नहीं तो उसमें
दुर्ग गुवाहाटी की मांग बहुत पुरानी नहीं है
,
...
more...

जी प्रस्तावित मांग थी उनको उठाया ही नहीं गया पेपर में
दुर्ग पे फेंसिंग का कोई प्रस्ताव नहीं,
दुर्ग रायगढ़ इंटरसिटी,
रायपुर गेवरा पैसेंजर का विस्तार दुर्ग तक,
रायपुर से मुम्बई नयी ट्रैन, इत्यादि।
  
Rail News
0 Followers
750 views
NWR/North Western  -  
Jan 31 2017 (15:03)   अजमेर स्टेशन पर घंटों से खड़े हैं मुसाफिर, ट्रेन मिले तो शुरु हो सफर

riz339~   101 news posts
Entry# 2146836   News Entry# 292672         Tags   Past Edits
अजमेर। ।
रेल यात्रियों की जरुरत और आंकाक्षाओं को लेकर उम्मीदो की ट्रेन एक फरवरी को दौड़ेगी। लोकसभा में इस साल अलग से रेल बजट पेश करने की पुरानी परंपरा को समाप्त करते हुए आम बजट के साथ ही समावेश किया जाएगा। हालांकि स्थानीय जनता और रेल यात्रियों की नई गाडि़यों की जरुरत और सुविधाएं की मांग वही होगी जो अलग से पेश किए जाने वाले रेल बजट से होती है।
पिछले दो वर्षों से रेल बजट में किसी नई गाड़ी चलाने की घोषणा को नजरअंदाज किया जा रहा है। यह जुदा बात
...
more...
है कि रेलवे ने इस दरम्यान सुविधा और तत्काल के नाम से स्पेशल गाडि़यां चलाई जिसका किराया गरीब अथवा मध्यम आय वर्ग के लिए चुकाना संभव नहीं था। अब इस साल के रेल बजट में आमजन के लिए नई गाडि़यों की घोषणा सबसे बड़ी जरुरत बन चुकी है।
नई रेल परियोजनाओं के लिए बजट
अजमेर के लिए तीन नई रेल परियोजनाएं लगभग एक दशक से ठंडे बस्ते में हैं। इसमें पुष्कर-मेड़ता, अजमेर-सवाई माधोपुर और अजमेर-कोटा नई रेल परियोजनाएं शामिल हैं। रेलवे मंत्रालय की ओर से इन नई रेल परियोजनाओं का सर्वे कराया जा चुका है लेकिन रेल बजट में वित्तीय स्वीकृति के नाम पर अरबों रुपए की परियोजनाओं के लिए महज एक दो लाख रुपए दिए जाते हैं। इस बार रेल बजट में इन परियोजनाओं के लिए वित्तीय स्वीकृति जारी करने की उम्मीद रहेगी।
नई गाडि़यों की है जरुरत
अजमेर में यात्री सुविधाओं के मद्देनजर नई गाडि़यां चलाना सबसे बड़ी प्राथमिकता है। पिछले लगभग पांच वर्ष से अजमेर से चैन्नई के लिए नई ट्रेन चलाने की मांग लगातार हो रही है। जनप्रतिनिधियों सहित रेलवे प्रशासन भी इसकी जरुरत महसूस करता है। प्रति वर्ष रेलवे की ओर से जाने वाली अनुशंसा में अजमेर-चैन्नई एक्सप्रेस को प्राथमिकता से रखा जाता है लेकिन हर बार निराशा ही हाथ लगती है।
रेलवे कारखाना का आधुनिकीकरण
अजमेर के लोको और कैरिज कारखाने में आधुनिकीकरण के तहत लगभग 120 करोड़ रुपए की योजना पर काम चल रहा है। दस वर्ष से धीरे-धीरे हो रहे इन कार्यों के लिए बजट सबसे बड़ी बाधा साबित हो रहा है। आधुनिकीकरण के तहत कारखानों में नए शेड बनाने के साथ लोको और डिब्बों के रखरखाव के लिए नई मशीनें मंगवाई जानी हैं। इसके बाद कारखानों की कार्य क्षमता में दो गुनी बढ़ोतरी हो जाएगी। रेल बजट में कारखानों के लिए भी अच्छी खासी वित्तीय स्वीकृति पर नजर रहेगी।
इन गाडि़यों की है जरुरत और उम्मीद
अजमेर- रामेश्वरम वाया चैन्नई एक्सप्रेस।
उदयपुर-कटरा वाया अजमेर नियमित ट्रेन ।
अजमेर-हरिद्वार को सप्ताह में तीन दिन के बजाए रोजाना और उदयपुर तक विस्तार ।
अजमेर-दादर एक्सप्रेस को रोजाना चलाना।
अजमेर-मुम्बई के बीच सुपरफास्ट ट्रेन।
अजमेर-जोधपुर के बीच नई सुपरफास्ट ट्रेन।

4 posts are hidden.

  
740 views
Feb 01 2017 (10:19)
Selva Vignesh*^   7879 blog posts   181 correct pred (71% accurate)
Re# 2146836-6            Tags   Past Edits
Yes in some other news it was mentioned as AII RMM oly...via was not mentioned
  
General Travel
0 Followers
2902 views
Jan 26 2017 (10:35)   AII/Ajmer Junction (5 PFs)

🚂अलविदा खंडवा मिटरगेज🙋🙋~   563 blog posts
Entry# 2140746            Tags   Past Edits
1 compliments
Superb
Ajmer News

33 posts - Thu Jan 26, 2017

38 posts are hidden.

  
269 views
Jan 26 2017 (14:15)
SGNR HS Inaugural 27 Feb^~   78738 blog posts   5089 correct pred (78% accurate)
Re# 2140746-60            Tags   Past Edits
All the proposals for previous year are valid this year also. But RB is rejecting all demands for Chennai / Rameswaram / Tirupati/ Bangalore from 2014
Last train to south from Rajasthan was MQ BGKT
Since then no new train connecting Rajasthan to South via Jaipur Jodhpur Ajmer.
Very very sad.... Huge demand but no train
And
...
more...
I don't include SGNR TPJ because it's of no use for middle class fellow

  
Jan 26 2017 (14:17)
SGNR HS Inaugural 27 Feb^~   78738 blog posts   5089 correct pred (78% accurate)
Re# 2140746-61            Tags   Past Edits
I hope RMM ADI is upto Ajmer or Jodhpur or Bikaner or Jaipur.
ADI is already getting MAS HS..

  
264 views
Jan 26 2017 (14:36)
Selva Vignesh*^   7879 blog posts   181 correct pred (71% accurate)
Re# 2140746-62            Tags   Past Edits
But my suggestion is BKN/AII-RMM should b dedicated n ADI-RMM should b dedicated train..coz the num of pilgrims visiting RMM r more from Gujarat n Rajasthan...so a single train cannot fullfill the demand

  
262 views
Jan 26 2017 (14:39)
SGNR HS Inaugural 27 Feb^~   78738 blog posts   5089 correct pred (78% accurate)
Re# 2140746-63            Tags   Past Edits
RB not giving even one train from last 2 year so all of sudden 2 train demand is impossible . RMM is connected by Pamban so there will always be limited trains to go there .

9 posts are hidden.

  
269 views
Jan 26 2017 (16:16)
Selva Vignesh*^   7879 blog posts   181 correct pred (71% accurate)
Re# 2140746-73            Tags   Past Edits
There wil not b any prob in running weeklies

9 posts are hidden.
  
Info Update
0 Followers
6755 views
Dec 26 2016 (18:58)   16343/Amritha Express | PGT/Palakkad Junction (Palghat) (5 PFs)

MCPNBR~   1944 blog posts   101 correct pred (87% accurate)
Entry# 2105905            Tags   Past Edits
The division level proposals submitted to Southern railway:
• Palakkad-Rameswaram Express. PGT 21:30, RMM 5:30, Return RMM 20:00, PGT 4:00.
• Palakkad – Pazhani Passenger
• Mangalore – Nagarcoil Super Deluxe Express with less stoppages - MAQ 19:00, TVC 5:30
• Bifurcation
...
more...
of Amrutha and Rajyarani Express. Amrutha will be extended upto Madurai and will reach Madurai at 12:30, return Madurai 18:00, PGT 23:00 and TVC more or less the present timings.
• 22851/Santragachi - Mangaluru Vivek Express, 17605/Mangaluru Central - Kacheguda Express will be made thrice in a week.
• 16565/Yesvantpur - Mangaluru Central Express will be made twice in a week.
• Kozhikode-Thrissur passenger will be extended to Guruvayur (arrival 11:45, Dep 16:45)

28 posts are hidden.

  
2853 views
Jan 13 2017 (20:14)
Selva Vignesh*^   7879 blog posts   181 correct pred (71% accurate)
Re# 2105905-29            Tags   Past Edits
Yes
RMM-CBE/PGT slip will be restoration of erstwhile MG slip.
  
★★  General Travel
0 Followers
4272 views
Jan 13 2017 (08:05)   22651/Chennai Central - Palani SF Express | MAJN/Mangaluru Junction (Mangalore) (3 PFs)

athul   2377 blog posts   149 correct pred (79% accurate)
Entry# 2125368            Tags   Past Edits
Kankanadi (Mangalore jn.)- kochuveli ( 3 days a week) and kankanadi (Mangalore jn.)- Rammeshwaram (2 days a week) via Pgt,Poy and Punalur-Palakkad Passenger Trains to be on tracks soon....
.
Also Chennai-Palani exp which is now running as special up to Pollachi will be extended till Palakkad very soon...and will leave from palakkad town as pgtn-chennai exp.

45 posts are hidden.

  
519 views
Jan 13 2017 (20:02)
Selva Vignesh*^   7879 blog posts   181 correct pred (71% accurate)
Re# 2125368-50            Tags   Past Edits
Great news...Mangalore-Rameswaram express is a long pending demand..This will be useful for connecting all the imp pilgrim places..

  
1976 views
Jan 13 2017 (20:05)
athul   2377 blog posts   149 correct pred (79% accurate)
Re# 2125368-51            Tags   Past Edits
very true.
If ppl could get a train from bynr as a connection to this train,then it covers all imp pilgrimage centers....

4 posts are hidden.
  
★★★  General Travel
0 Followers
2475 views
Jan 10 2017 (19:19)   15119/Rameswaram - Manduadih Weekly Express | PBM/Pamban (1 PFs)

WELCOME JBP ET OHE OMG 😲 AGAIN~   10688 blog posts   14 correct pred (46% accurate)
Entry# 2122658            Tags   Past Edits
Although wasn't able to catch BEAUTY Of PAMBAN by train but still captured from the vehicle bridge on rhs while going towards Rameshwaram 🤐🤕

15 posts are hidden.

  
1484 views
Jan 12 2017 (09:50)
Selva Vignesh*^   7879 blog posts   181 correct pred (71% accurate)
Re# 2122658-16            Tags   Past Edits
Awesome pics

  
1463 views
Jan 12 2017 (10:01)
WELCOME JBP ET OHE OMG 😲 AGAIN~   10688 blog posts   14 correct pred (46% accurate)
Re# 2122658-17            Tags   Past Edits
A big thanks Selva bhai

2 posts are hidden.
  
★★  Info Update
0 Followers
15083 views
Nov 13 2016 (23:19)  

Foamer~   1243 blog posts
Entry# 2058925            Tags   Past Edits
Here is a list of different locos hauling the longest distance:
-
Diesel:
-
Single Alco - 16734 : ED WDM 3A/3D
...
more...
- --------- OKHA - RMM = 3190 Kms.
-
Single EMD - 15933 : SGUJ WDP 4/4B/4D -------- DBRG - ASR = 2854 Kms.
-
Twin Alcos - 16338 : ERS WDM 3A ----------- ERS - OKHA = 2251 Kms.
-------------------------------------------------- -----------------------------------------------
-
Electric:
-
Single WAP 1 - 18507 : GZB WAP 1 - ------------- JSG - ASR = 1792 Kms.
-
Single WAP 4 - 16317 : ED/RPM WAP 4 ---------------- CAPE - NDLS = 3117 Kms.
-
Single WAP 5 - 12471 : BRC WAP 5 ---------------- BDTS - JAT = 1951 kms.
-
Single WAP 7 - 18478 : TKD WAP 7 - -------------- HW - PURI = 2366 Kms.
-
Single WAG 5 - 58111 : TATA WAG 5 - ------------- TATA - ITR = 877 Kms.
-------------------------------------------------- -------------------------------------------------
-
I have done it to the best of my knowledge, please comment if you find any mistake. I have taken only regular links into consideration. Thanks.

11 posts are hidden.

  
488 views
Nov 15 2016 (20:57)
Selva Vignesh*^   7879 blog posts   181 correct pred (71% accurate)
Re# 2058925-12            Tags   Past Edits
Nope..Refuelling for RMM bound loco happens at MNM...

  
Nov 15 2016 (20:58)
Selva Vignesh*^   7879 blog posts   181 correct pred (71% accurate)
Re# 2058925-13            Tags   Past Edits
RMM-OKHA hauled by ED loco ly end to end...At ED the rake reversal is done but same loco hauls the train from RMM to OKHA....

  
509 views
Nov 15 2016 (21:43)
Foamer~   1243 blog posts
Re# 2058925-14            Tags   Past Edits
Thanks.
So any idea where the refuelling is done? Only at MNM ?
Also after a complete up and down trip, it would have hauled more than 6000 Kms, so they would need to do some checks right? So, how and where's that done?

  
494 views
Nov 15 2016 (23:04)
Selva Vignesh*^   7879 blog posts   181 correct pred (71% accurate)
Re# 2058925-15            Tags   Past Edits
Refuelling depends...For few loco it happens at MNM..I have seen RMM-TPTY n CAPE-RMM done at MNM...

  
916 views
Nov 16 2016 (02:33)
A good day ahead~   2335 blog posts
Re# 2058925-16            Tags   Past Edits
Thanks for the confirmation! I was hoping it would be an end-to-end run with the same loco.
Just one more question, is it an end-to-end single loco in both directions? I mean, like Kerala express, which gets a fresh loco at ED while going towards NDLS, but runs without loco change till ERS, does this train also run with single loco in the return ( Okha-RMM) but has a loco change at ED in the UP ( RMM-Okha)?

11 posts are hidden.
  
★  Poll
0 Followers
5007 views
68 votes
Nov 09 2016 (23:54)  
 

💜💜 KR King Madgaon Rajdhani 💜💜~   1297 blog posts
Entry# 2054395            Tags   Past Edits
Which Station Need More Train??
SPECIAL NOTE:-Railfan kripya dhyan de
Please isme GORAKHPUR samrthak vote na kare phir se wohi topic na dohraye. DHANYAWAD
Suchana samapt huyi
Tuticorin3%2
Chennai1%1
Madurai1%1
KSR Bengaluru3%2
Vishakhapattanam1%1
Hydrabad0%0
Hubbali1%1
Madgaon1%1
Ratnagiri4%3
Kolhapur0%0
Nagpur3%2
Aurangabad3%2
Raipur3%2
Ahmedabad1%1
Okha1%1
Porbandar0%0
Bilaspur1%1
Ranchi3%2
Guwahati0%0
Silchar1%1
Agartala3%2
Bhagalpur3%2
Darbhanga9%6
Jabalpur13%9
Bhopal1%1
Kota1%1
Jaiselmer0%0
Bikaner1%1
Jaipur1%1
Lucknow1%1
Pratapgarh0%0
Bhatinda0%0
Sri Ganganagar0%0
Ludhiana1%1
Jammu0%0
Dehradun0%0
Shri Mata Vaishno Devi Katra7%5
ADD YOURS21%14

11 posts are hidden.

  
460 views
Nov 11 2016 (12:09)
Selva Vignesh*^   7879 blog posts   181 correct pred (71% accurate)
Re# 2054395-12            Tags   Past Edits
RMM needs weekly/Biweekly connection to SVDK,HWH,GAYA,LTT,BKN,AII,GKP(Ayodhya),SMNH

39 posts are hidden.
Page#    3140 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Mar 7
Trains with ARP 15 Dep on: Sun Mar 12
Trains with ARP 30 Dep on: Mon Mar 27
Trains with ARP 120 Dep on: Sun Jun 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site