Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Feb 26, 2017 06:45:01 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Feb 26, 2017 06:45:01 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Raja lare Raja se Praja jaye jaan se~
Page#    832 Blog Entries  next>>
  
★★★  Rail Fanning
0 Followers
842 views
Feb 24 2017 (13:39)   22885/Mumbai LTT - Tatanagar Antyodaya Express | AGC/Agra Cantt. (6 PFs) | LDH/WAG-7/24583

Atharva^~   31342 blog posts   2454 correct pred (68% accurate)
Entry# 2176794            Tags   Past Edits
Antyodaya Express Rake at Agra Cantt, All coaches are SER Marked and Going Towards Jhansi Lead by Tiger WAG 7. Captured 4hrs ago.
.
#Atharva070025

27 posts are hidden.

  
349 views
Yesterday (11:09)
Raja lare Raja se Praja jaye jaan se~   1155 blog posts   1 correct pred (100% accurate)
Re# 2176794-31            Tags   Past Edits
Out of this rake 2 derailed at Ernakulam

  
109 views
Yesterday (23:31)
Atharva^~   31342 blog posts   2454 correct pred (68% accurate)
Re# 2176794-33            Tags   Past Edits
Ye wali ni dusri rake derail hui..
  
Rail News
0 Followers
201 views
Other NewsSR/Southern  -  
Feb 24 2017 (19:42)   First trial run of diesel engine to harbour terminus a success

Rail Fanning~   135 news posts
Entry# 2177217   News Entry# 294721         Tags   Past Edits
The trial run of diesel engine to the Cochin Harbour Terminus railway station, on the new tracks, was a success.
“The engine commenced the trial run from the Ernakulam South railway station around 10.30 am. Travelling at 10 kmph, the engine passed Mattancherry Halt and completed the trial run in half-an-hour,” said Railways area manager R Harikrishnan.
Train service to Harbour Terminus was discontinued after the Venduruthy bridge was destroyed by a dredger in 2004. Since then, there have been demands from various quarters to resume the service. During his last visit
...
more...
to the state, Railway Minister Suresh Prabhu had assured that Harbour Terminus would be reopened by April.
Renovation of the station is progressing fast as per schedule. The platform will be capable of accommodating 18 bogies. Meanwhile, electrification is being delayed for want of consent from the Navy.
Initially, the Ernakulam-Angamaly MEMU service will be extended to Harbour Terminus twice a day. It is expected that the airport link service could be started after the Nedumbassery station becomes operational.

1 posts are hidden.

  
929 views
Feb 24 2017 (19:49)
Raja lare Raja se Praja jaye jaan se~   1155 blog posts   1 correct pred (100% accurate)
Re# 2177217-2            Tags   Past Edits
Yes. Both pairs of PNBE ERS expresses must origin/terminate at Kochi HT

  
171 views
Yesterday (19:36)
Rail Fanning~   2584 blog posts
Re# 2177217-3            Tags   Past Edits
As of now express trains may not be feasible as it will also entail change of Engine from Electric to diesel merely for 5 km. Also the pf at CHTS cannot accommodate 20 coaches ....maybe at a later time they can always explore the feasibility of reducing the rush at ERS by diverting trains to CHTS

1 posts are hidden.
  
General Travel
1 Followers
278 views
Yesterday (08:45)  

Rahul Kumar   2079 blog posts   2168 correct pred (78% accurate)
Entry# 2177540            Tags   Past Edits
CRS inpesticon of
Bhattanagar Dankuni Doubling & Bally Dankuni 3rd line

1 posts are hidden.

  
185 views
Yesterday (10:56)
Raja lare Raja se Praja jaye jaan se~   1155 blog posts   1 correct pred (100% accurate)
Re# 2177540-4            Tags   Past Edits
How is it possible, Bally rail bazar ekhono toh sorano hoyni r pink book of ER bolchhe project Liluah Dankuni 3rd Line

  
103 views
Yesterday (12:21)
Rahul Kumar   2079 blog posts   2168 correct pred (78% accurate)
Re# 2177540-5            Tags   Past Edits
22 Feb Howrah jaachilam kaaj dekhe mone Holo mota moti kaaj complete hobar kache aache
Bally Liluah er majhe amar mone hochne na ki 3rd line kara hobe karon bally - liluah 3rd line Kora possible nai belur pojonto hote pare
overall bally liluah 3rd line korte gele onek jhamela aache
  
General Travel
0 Followers
282 views
Feb 24 2017 (16:33)   12329/West Bengal Sampark Kranti Express | GAYA/Gaya Junction (9 PFs)

Indian Railways the life line of our Nation~   11435 blog posts   136 correct pred (83% accurate)
Entry# 2177040            Tags   Past Edits
How this train skips Gaya??Is Gaya is not a important station??

2 posts are hidden.

  
63 views
Yesterday (11:20)
Raja lare Raja se Praja jaye jaan se~   1155 blog posts   1 correct pred (100% accurate)
Re# 2177040-3            Tags   Past Edits
12379/80 halts at GAya

8 posts are hidden.
  
★  General Travel
0 Followers
559 views
Yesterday (09:48)   BPL/Bhopal Junction (6 PFs)

Boxer Bhai   38188 blog posts   12668 correct pred (61% accurate)
Entry# 2177570            Tags   Past Edits
Trial of chair car coaches was succesfull for mahamann exp
Also 1 mahamann exp for wcr 24 coacher

  
325 views
Yesterday (11:19)
Raja lare Raja se Praja jaye jaan se~   1155 blog posts   1 correct pred (100% accurate)
Re# 2177570-1            Tags   Past Edits
May be for BPL ADI Mahamana Exp via UJN RTM BRC
BPL 18.45, UJN 21.55, RTM 23.45,
GDA 02.40, BRC 04.15, ADI 06.05.
ADI 17.55, BRC 20.05, GDA 21.17,
RTM 00.20, UJN 02.15,
...
more...
BPL 05.15.

10 posts are hidden.
  
★★★  Info Update
0 Followers
807 views
Feb 24 2017 (16:08)   12329/West Bengal Sampark Kranti Express | SDAH/Sealdah (20 PFs)

I Will Come Back As FM After 2 Weeks😊^~   3087 blog posts   14216 correct pred (79% accurate)
Entry# 2177011            Tags   Past Edits
Finally Wait Is Over😍
West Bengal Sampark Kranti Express & Jallianwalabagh Express Is Going To LHBify Soon☺

11 posts are hidden.

  
224 views
Yesterday (10:51)
Raja lare Raja se Praja jaye jaan se~   1155 blog posts   1 correct pred (100% accurate)
Re# 2177011-13            Tags   Past Edits
DJM ke liye LHB ka request bheja gaya NFR ke taraf se

  
305 views
Yesterday (10:54)
DM^~   4303 blog posts   9725 correct pred (88% accurate)
Re# 2177011-14            Tags   Past Edits
Kaha se pata chala.....NFR ke baja se DM Ko LHB Nehi mil Raha hai

4 posts are hidden.
  
Imaginary
0 Followers
156 views
04
Feb 24 2017 (22:17)   IMG99778/♥♥Pilibhit Lucknow Rohilkhand Express♥♥

Raja lare Raja se Praja jaye jaan se~   95 img trains   23 popular
344 green flags   61 red flags   3 green per Train
Entry# 2177342            Tags   Past Edits
Need this train

  
106 views
Yesterday (07:00)
12952 नई दिल्ली मुंबई राजधानी ➡द किंग~   6110 blog posts   326 correct pred (76% accurate)
Re# 2177342-1            Tags   Past Edits
Bhai ruhelkhand express BE ke alawa aur kabi se start nahi ho sakti .bcz Capital of Ruhelkhand is Bareilly.

  
97 views
Yesterday (10:46)
Raja lare Raja se Praja jaye jaan se~   1155 blog posts   1 correct pred (100% accurate)
Re# 2177342-2            Tags   Past Edits
For that 15309/10 BG version required after PBE PP MLN STP ASH GC is completed by 2020
  
General Travel
0 Followers
113 views
Feb 24 2017 (21:54)   55364/Pilibhit - Bareilly City Passenger (UnReserved) | PBE/Pilibhit Junction (4 PFs) | IZN/WDP-4

Raja lare Raja se Praja jaye jaan se~   1155 blog posts   1 correct pred (100% accurate)
Entry# 2177320            Tags   Past Edits
PBE PP GC is going to start. Date pata nahi
  
★  General Travel
0 Followers
594 views
Feb 24 2017 (18:48)   22853/Shalimar - Visakhapatnam Weekly SF Express

Hrishik Mukherjee~   98 blog posts   2 correct pred (67% accurate)
Entry# 2177169            Tags   Past Edits
22853/22854 SHM VSKP Express
12869/12870 HWH CST Express
22893/22894 HWH SNSI Express
22857/22858 SRC ANVT Expess all to run with LHB coaches soon
#admins #moderators

9 posts - Fri Feb 24, 2017

  
296 views
Feb 24 2017 (19:50)
Shirdi Superfast Express*^   2237 blog posts   949 correct pred (68% accurate)
Re# 2177169-10            Tags   Past Edits
As ANVT-SRC was getting delayed due to fog the departure of HWH-SNSI was also getting delayed. This is a confirmed fact that they have RSA. However it is also possible that all three has Circular RSA.

  
404 views
Feb 24 2017 (19:52)
Rahul Kumar   2079 blog posts   2168 correct pred (78% accurate)
Re# 2177169-11            Tags   Past Edits
22853-22854 & 12370-12369 have Rsa
22894-22893 & 22857-22858 have Rsa
12869-70 has different CC than 22893-94

  
424 views
Feb 24 2017 (19:52)
Shirdi Superfast Express*^   2237 blog posts   949 correct pred (68% accurate)
Re# 2177169-12            Tags   Past Edits
Also 12870 starts on Friday on 22894 starts on Thursday so they cant have RSA.

  
401 views
Feb 24 2017 (19:54)
Rahul Kumar   2079 blog posts   2168 correct pred (78% accurate)
Re# 2177169-13            Tags   Past Edits
22857/58 shares rake with 22894-93 howrah Shirdi Exp

  
418 views
Feb 24 2017 (19:55)
Raja lare Raja se Praja jaye jaan se~   1155 blog posts   1 correct pred (100% accurate)
Re# 2177169-14            Tags   Past Edits
Take a walk through Tikiapara car shed coaching yard . U will see the same as I had written earlier in my blog

1 posts are hidden.
  
Rail News
0 Followers
171 views
IR AffairsNER/North Eastern  -  
Feb 24 2017 (17:19)   कासगंज-बरेली रूट पर नई ट्रेनें 11 मार्च के बाद चलेंगी

Neelesh Kant Saxena~   110 news posts
Entry# 2177204   News Entry# 294717         Tags   Past Edits
एनईआर के जीएम ने किया दौरा, बोले- बदायूं रुट पर दौड़ेगे इलेक्ट्रिक रेल इंजन
तय समय से करीब तीन घंटे देरी से पहुंचे पूर्वोत्तर रेलवे के जीएम राजीव मिश्रा ने यहां रेलवे स्टेशन के निरीक्षण के दौरान कहा कि कासगंज से बरेली तक 11 मार्च के बाद चुनाव आचार संहिता हटते ही नई ट्रेनों का संचालन शुरू कर दिया जाएगा। वहीं इस रूट पर इलेक्ट्रिक रूट की स्वीकृति मिल चुकी है, जिसका टेंडर हो चुका है। अगले वर्ष से कार्य शुरु हो जाएगा।
बुधवार को बदायूं रेलवे स्टेशन का निरीक्षण करने
...
more...
आए जीएम ने रेलवे स्टेशन, प्लेटफार्म, टिकटघर, इलेक्ट्रिीशियन कक्ष और सफाई व्यवस्था का हाल देखा। उन्होंने कहा कि आचार संहिता हटते ही कासगंज से बरेली रूट पर नई ट्रेने चलाई जाएंगी। उन्होंने बताया कि अभी तक रामगंगा ब्राडगेज पर काम चलने की वजह से ट्रेनों का संचालन बंद था। यह काम पूरा हो गया है। जीएम के निरीक्षण के दौरान वैसे तो सबकुछ ठीक ठाक रहा लेकिन कुछ अव्यवस्थाएं पाई गई जिसको लेकर रेलवे के सीनियर डिवीजन मैनेजर को डांट भी लगाई। कहा कि सुधर जाओ। सारी व्यवस्थाएं बेहतर मिलनी चाहिए। जीएम के निरीक्षण के दौरान स्टेशन पर काफी गहमा-गहमी रही। पूर्व विधायक प्रेमस्वरूप पाठक ने ने कछला हाल्ट को स्टेशन बनाने के लिए मांग की। जीएम से मिलने पहुंचे भाकियू कार्यकर्ताओं को भी उन्होंने 11 मार्च के बाद ट्रेनों का संचालन शुरू करने का अश्वासन दिया गया। बदायूं क्लब के लोगों ने भी उर्मिलेश शंखधार पुस्कालय और वाचनालय के पुनरोत्थान के लिए ज्ञापन दिया। अशोक सक्सेना, सैय्यद इकबाल, अशोक खुराना, रजनीश मिश्रा, प्रमोद कुमार आदि लोगों ने मथुरा से बदायूं होते हुए लखनऊ के लिए ट्रेनें चलाने की मांग की।
------
चनेहटी होते हुए शाहजहांपुर को दौड़ेगी ट्रेन
आचार सांहिता खत्म होते ही नई ट्रेने के संचालन के साथ अब कासगंज से बदायूं वाया चनेहटी होते हुए भी शाहजहांपुर को ट्रेन चलाई जाएगी। इससे बदायूं रामगंगा से सीधा शाहजहांपुर, लखनऊ और इलाहबाद लिंक रुट से जुड़ेगा।

  
971 views
Feb 24 2017 (19:30)
Raja lare Raja se Praja jaye jaan se~   1155 blog posts   1 correct pred (100% accurate)
Re# 2177204-1            Tags   Past Edits
Agra Fort Gorakhpur Gokul Express 22539/40 superfast train chalao via AH MTJ KSJ BEM SPN SCC GD BLP BNY ANDN or SPN LKO GD BST .
AF 14.30, GKP 05.15 via SCC GD BLP BNY or
AF 18.10, GKP 08.55 via LKO GD BST.
GKP 15.50, GD 19.50, AF 06.35 via BNY SCC SPN. Or
GKP
...
more...
15.05, GD 17.45, AF 05.50 via LKO SPN BEM.

2 posts are hidden.
Page#    832 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Mar 8
Trains with ARP 15 Dep on: Mon Mar 13
Trains with ARP 30 Dep on: Tue Mar 28
Trains with ARP 120 Dep on: Mon Jun 26

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site