Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue May 30, 2017 19:02:57 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue May 30, 2017 19:02:57 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by ® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~
Page#    6518 Blog Entries  next>>
  
Rail News
0 Followers
55 views
Other News
Today (18:10)   indian railway-जानिए किस सुरंग को बनाने में रेलवे को लगे सात साल

Jayashree   36439 news posts
Entry# 2300371   News Entry# 303940         Tags   Past Edits
छिंदवाड़ा. गेज कनवर्जन विभाग को छिंदवाड़ा-नागपुर रेलमार्ग पर निर्माणाधीन 750 मीटर के सुरंग खोलने (बनाने) में सात साल लग गए। बीते शुक्रवार को दूसरे छोर पर सुरंग का मुंह खुला तो इस कार्य में लगे अधिकारियों व कर्मचारियों ने राहत की सांस ली और सभी खुशी से झूम उठे। दरअसल, कमजोर पत्थर व अनुमान से अधिक निकल रही मिट्टी ने अधिकारियों की नींद उड़ा रखी थी।
वर्ष 2011-12 में शुरू हुआ सुरंग का कार्य आरम्भ से ही समस्याओं से घिरा रहा। टनल का मुख्य मार्ग बनाते समय किए गए ब्लास्ट से खिसके पत्थर की वजह से उस समय नैरोगेज की लाइन लटक गई थी, जिससे चार माह तक उक्त रेल लाइन पर ब्लॉक लेना पड़ा था। इसके बाद पत्थर तोड़कर सुरंग बनाने
...
more...
की शुरुआत हुई तो कमजोर पत्थर की टूटती परतें और उसके बीच से निकलती काली मिट्टी ने समस्याओं का पहाड़ खड़ा कर दिया। इसकी वजह से 18 माह में पूरे होने वाले इस कार्य को करने में 7 साल लगे। एक साल में कराया 400 मीटर से अधिक सुरंग
एक साल पूर्व चार्ज लेने वाले अधीशासी अभियंता एसके सिंह की मानंे तो उन्होंने 400 मीटर से अधिक सुरंग बनाई है। इससे पूर्व छह साल में आधे से भी कम कार्य हुआ था। बताया गया कि मुख्य अभियंता एके पांडेय व उप मुख्य अभियंता एके सिंह से लगातार मिले निर्देशों के बाद यह कार्य पूरा हुआ है। दो माह में इसका फिनिशिंग कार्य पूरा कर लिया जाएगा। यह सुरंग उक्त रेल मार्ग का सबसे कठिन कार्य था।
संशोधित तिथि के बाद लगे 19 माह वर्ष 2015 में गेज कनवर्जन विभाग ने सुरंग को पूरा करने की संशोधित तिथि 31 अक्टूबर तय की थी, लेकिन यह तिथि भी पार हो गई। इसके बाद अधिकारियों की निगरानी में लगातार कार्य चला और 19 माह बाद सफलता मिली है। अब सुरंग के फिनिशिंग का कार्य प्रगति पर है। 16 से 28 करोड़ पहुंचा बजट सुरंग निर्माण के लिए 16 करोड़ का बजट तय था, लेकिन काम की शुरुआत के बाद बढ़ते काम ने इसे 28 करोड़ रुपए तक पहुंचा दिया। आंकड़ों पर गौर करें तो सुरंग एक व दो को पूरा करने के लिए वर्ष 2011-12 में 16 करोड़ रुपए का टेंडर हुआ। सुरंग निर्माण की शुरुआत से इसका खर्च अनुमान से अधिक बढ़ता चला गया। लागत बढऩे से निर्माणदायी कम्पनी ने बीच में काम बंद कर दिया था। अधिकारियों के दबाव में कार्य शुरू हुआ, लेकिन पूर्व निर्धारित राशि में इसे पूरा करना मुश्किल था। इसके लिए पुन: करीब 12 करोड़ रुपए का री-टेण्डर निकाला गया।
पत्थर कमजोर होने की थी जानकारी विभाग को भू-संरक्षण टेस्ट रिपोर्ट में पत्थर कमजोर होने की जानकारी थी, लेकिन पत्थर इतना कमजोर होगा की काम में अड़चन शुरू हो जाएगी। इसका अनुमान किसी को नहीं था। सुरंग के कार्य में अनुमान से अधिक लोहे की खपत बढ़ी है। मिट्टी व पत्थर भी अधिक निकले हैं।

  
101 views
Today (18:27)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10068 blog posts   14938 correct pred (63% accurate)
Re# 2300371-1            Tags   Past Edits
  
Poll
0 Followers
337 views
63 votes
Today (05:02)  

Jackpot June Edition will be Launch on 1st June^~   34516 blog posts   28164 correct pred (78% accurate)
Entry# 2299323            Tags   Past Edits
Its Half Tenure for RM Suresh P Prabhu
how much u rate him on Points table of 0 to 10.
#thinkDKG Polls official
010%6
16%4
20%0
311%7
45%3
517%11
613%8
717%11
810%6
92%1
1010%6

6 posts are hidden.

  
70 views
Today (15:42)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10068 blog posts   14938 correct pred (63% accurate)
Re# 2299323-17            Tags   Past Edits
#sitesuggestion
there should be a two dimension survey feature so that we can make points plus rating together for multiple question e.g.
A. 1. 2. 3.
B. 1. 2. 3.
C. 1. 2. 3.

5 posts are hidden.
  
Rail News
0 Followers
97 views
New Facilities/TechnologyNER/North Eastern  -  
Today (10:59)   ऐसे काम करेगी डिवाइस,ऐसी डिवाइस, आग लगी तो खुद ही रोक देगी ट्रेन

☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   5699 news posts
Entry# 2300091   News Entry# 303902         Tags   Past Edits
ऐसे काम करेगी डिवाइस
नई तकनीक
’ बर्निंग ट्रेन बनने से बचाएगी अत्याधुनिक डिवाइस, रुकेगा नुकसान
’ ट्रेनों में ऑटोमेटिक फायर एंड स्मोक डिटेक्शन सिस्टम लगाने की तैयारी
Click here to enlarge image
गोरखपुर
...
more...
वरिष्ठ संवाददाताट्रेनों में आग की घटनाओं को रोकने के लिए रेलवे ने एक नई तकनीक विकसित की है। इससे आग लगते ही ट्रेन खुद-ब-खुद रुक जाएगी और होने वाले धन-जन की हानि को रोका जा सकेगा। रेलवे बोर्ड ने इस तकनीक का प्रयोग करने की मंजूरी दे दी है।ट्रेनों में अगलगी की घटनाओं को रोकने के लिए रेलवे ‘ऑटोमेटिक फायर एंड स्मोक डिटेक्शन सिस्टम’ डिवाइस का प्रयोग करने जा रही है। इस डिवाइस की खासियत है कि जैसे ही ट्रेन में आग लगेगी, तत्काल चेन पुलिंग हो जाएगी और ट्रेन रुक जाएगी। इससे आग बुझाने और राहत एवं बचाव कार्य करने में भी आसानी होगी। ट्रेन रुक जाने पर यात्री भी अपने आप को बचाने का प्रयास कर सकेंगे।300 बोगियों में लगेगी डिवाइस : रेलवे ने इस तकनीक को मंजूरी देते हुए प्रयोग के तौर पर पहली बार इस डिवाइस को नई दिल्ली- भुवनेश्वर राजधानी एक्सप्रेस में लगाया है। इसके बाद पूर्वोत्तर रेलवे की करीब 300 बोगियों में डिवाइस लगाई जाएगी। यदि यह प्रयोग सफल रहा तो उसे देश की सभी बोगियों में लागू कर दिया जाएगा।सिगरेट-बीड़ी पर अंकुश नहीं : ट्रेनों में सिगरेट और बीड़ी पीने पर यह स्मोक सिस्टम उसे नहीं पकड़ सकेगा। रेलवे के सूत्रों ने बताया कि दरअसल बीड़ी व सिगरेट से निकलने वाले धुएं की क्षमता इतनी अधिक नहीं होती है कि उसे डिवाइस की मदद से पकड़ा जा सके या उसके धुएं से चेन पुलिंग हो जाए। इसलिए ट्रेनों में सिगरेट व बीड़ी पीने की प्रवृत्ति को इस डिवाइस की बदौलत नहीं पकड़ा जा सकेगा।
ट्रेनों में अब एयर ब्रेकिंग सिस्टम होता है। इसी प्रणाली से ट्रेन रुकती है। ट्रेन को चलाने से पहले तैयारी परखने के लिए चालक और गार्ड एयरप्रेशर की जांच करता करते हैं। एक्सप्रेस ट्रेनों में बेकिं्रग सिस्टम के लिए साढ़े पांच किलो एयरप्रेशर का मानक होता है। प्रेशर जांचने के लिए चालक अपने सिस्टम से एक किग्रा हवा निकाल देता है और वाकी-टॉकी से गार्ड से उसके कक्ष में लगे गेज की री¨डग पढ़ने को कहता है। जो नई डिवाइस ट्रेनों में लगाई जा रही है, वह चालक व गार्ड के अलार्म बजा कर ट्रेन की बोगी में आग लगने और धुआं उठने की जानकारी देगा।

  
248 views
Today (14:45)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10068 blog posts   14938 correct pred (63% accurate)
Re# 2300091-1            Tags   Past Edits
cigrate pine pe toh nahi rukegi naa
  
Rail News
0 Followers
75 views
Other News
Today (14:30)   Railways to introduce Backup Signalling System | Indore News

Jayashree   36439 news posts
Entry# 2300077   News Entry# 303927         Tags   Past Edits
Indore: To provide an alternate to the Route Relay Interlocking (RRI) System that operates rail line points and signals, the railways will soon introduce a Backup Signaling System (BBS) for smooth train operations.
The move comes after a major fire broke out at the Route Relay Interlocking panel at Itarsi Railway Station in June, 2015. IT had led to major disruptions in railway traffic with over 2,000 trains being cancelled.
An official with Ratlam division of the Western railways said the new system operates through fibre optics and can help prevent disruptions in
...
more...
train services. "This will provide a backup for the entire train route at the railway station. The system is designed in such a way that it may be easy to transfer data to a laptop or a similar equipment and allow trains to pass through," he said.
He added that the introducing this system will ensure that at least 90 per cent of trains can be operated when a signal cabin is disabled.
"Developed by the Research Design and Standards Organisation (RDSO), the new backup system will be introduced in all railway stations. The railways has already started its trial at Nishatpura railway station under West Central Railways," said a spokesman with Ratlam division of the western railways. The commissioner of Railway Safety has also approved this newly introduced system.
T
There are backup systems for each function like electrical interlocking, power supply, panels, signals and others at the station. But there was no backup for the entire train management system at the stations, and the RDSO was in the process to develop and install such a system.
The move is also part of automatic safety systems like protection of trains and warning systems.

  
545 views
Today (14:34)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10068 blog posts   14938 correct pred (63% accurate)
Re# 2300077-1            Tags   Past Edits
  
General Travel
0 Followers
88 views
Yesterday (16:14)   THAL/Thal

® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10068 blog posts   14938 correct pred (63% accurate)
Entry# 2298650            Tags   Past Edits
ye station kab chalu hua
  
Rail News
0 Followers
901 views
Other NewsCR/Central  -  
May 28 2017 (22:53)   Tejas Express: Railways to provide Rs 30 headphones after 337 stolen | mumbai news | Hindustan Times

🚆Bhartiya Rail🚆   63 news posts
Entry# 2297558   News Entry# 303752         Tags   Past Edits
A total of 337 headphones distributed to passengers for the entertainment systems on-board the Mumbai-Goa Tejas Express were stolen in just four round trips after it debuted last Monday, a railway source said.
For its fifth trip on Saturday from CST, the Indian Railway Catering and Tourism Corporation (IRCTC) provided low-cost headphones.
The IRCTC spokesperson did not confirm the number of missing headphones, but said that it had bought 1,000 headphones, each costing Rs30
The
...
more...
Indian Railway had introduced the systems to provide a flight-like travel experience for passengers.
The train has 990 seats across 13 passenger coaches, including an executive coach that has more comfortable seats with neck and leg rests.
The system has preloaded games, movies and songs, besides FM channels. For the first four trips, headphones of a leading brand were handed over to passengers before the start of the journey.
However, after the first trip itself, the train came back with fewer headphones, damaged infotainment screens and waste strewn all over.
The cost of each headphone was around Rs200. The new ones will cost Rs30 each, a source said.
“Many passengers do not return the headphones before alighting and take those with them thinking that its cost was included in their ticket fare,”said an attendant on the train.
He said the on-board staff are now afraid that IRCTC might recover the cost of missing headphones from their salary.
Without catering services, a Tejas Express chair-car and executive-car ticket between Mumbai and Goa costs Rs 1,285 and Rs2,585, respectively.
According to an IRCTC source, from Friday’s trip, instead of distributing headphones to the passengers, staffers issued the headphones to the passengers after noting down their seat details and collected it from them.
It considerably brought down the number of missing headphones, the source said.
Meanwhile, many of the 990 infotainment screens were also found damaged.
According to officials, passengers damaged the buttons of three screens by pressing hard on them with an object. There were scratches on many screens.
Many passengers who travelled on the train on Friday complained about inedible food and poor WiFi.
Travellers who chose the non-vegetarian meal were served an omelette with rusk, juice, butter and jam.
Vegetarians, who were served upma with rusk, a cupcake, tea, juice, butter and jam, also said the meal did not meet their expectations.
In addition, WiFi was only available to passengers travelling in the executive chair car, and even they complained about weak signals and connection issues.

  
397 views
May 28 2017 (22:59)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10068 blog posts   14938 correct pred (63% accurate)
Re# 2297558-1            Tags   Past Edits
Itna kharcha Kia Tha to CCTV bhi laga dete

  
Hagge ka magga bhi chain se baandh k rakhte ho aur ear phone nikal k le Gaya koi

  
392 views
Yesterday (00:13)
Amit   271 blog posts   226 correct pred (76% accurate)
Re# 2297558-3            Tags   Past Edits
Hillarious waste of money.
This money could be spent on passenger safety, healthy food, clean toilets, essential rail doubling of KR etc. Why do babus always compare IR with China / Japanese Rail? It simply is not going to happen!

  
552 views
Yesterday (00:57)
Jackpot June Edition will be Launch on 1st June^~   34516 blog posts   28164 correct pred (78% accurate)
Re# 2297558-4            Tags   Past Edits
unhe pata nhi tha bhartiya log itne jayda chor h jo sirf demand krna jaante h
aur suvidhao ka durupyog

9 posts are hidden.

  
969 views
Yesterday (09:06)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10068 blog posts   14938 correct pred (63% accurate)
Re# 2297558-14            Tags   Past Edits
Hagge ka magga bhi chain se baandh k rakhte ho aur ear phone nikal k le Gaya koi

6 posts are hidden.
  
Site-Related
1 Followers
402 views
May 26 2017 (17:20)  

® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10068 blog posts   14938 correct pred (63% accurate)
Entry# 2294196            Tags   Past Edits
Here I came up with another utility named: "View/Add/Edit Atlas in Full Screen Mode"
If this does not work as IRI link save this file and open in browser
Enjoy..
Have you tough of seeing Atlas in full screen mode while editing so that you does not click somewhere by mistake and discard your effort.
Also
...
more...
facing screen space concerns and scrolling for your changes.
Here is the solution just enter route numeric number in textbox and click Go, It will redirect you corresponding route you can edit it and press save.
This depends fully on IRI Atlas so if IRI site is down it wont work.
  
Rail News
0 Followers
826 views
Other News
May 25 2017 (17:15)   hubballi-varanasi-hubballi express: Hubballi- Varanasi train to run from May 28 | Varanasi News

Jayashree   36439 news posts
Entry# 2292601   News Entry# 303579         Tags   Past Edits
VARANASI: The newly introduced Hubballi-Varanasi-Hubballi Express (17324/17323) will start regular operation from Varanasi on May 28. The weekly train was flagged off from Hubballi on Tuesday by Union railway minister Suresh Prabhu through video conferencing.
Chief area manager at Varanasi station Ravi Prakash Chaturvedi said the train will leave from Varanasi on every Sunday at 9.05pm and reach Hubballi on the third day of journey at 1pm. In return journey it will deaprt from Hubballi on every Friday at 5.05pm and reach Varanasi on the third day at 11.55am.
The train will stop
...
more...
at Gadag, Badami, Bagalkot, Almatti, Bijapur, Solapur, Daund, Ahmadnagar, Kopargaon, Manmad, Bhusaval, Khandwa, Itarsi, Pipariya, Narsinghpur, Jabalpur, Katni, Maihar, Satna, Manikpur, Chheoki and Mirzapur stations en route both directions.
The 16-boggy train will have one AC2, one AC3, six sleeper coaches, six second class general compartments and two compartments for physically challenged persons.
The Varanasi is one of the busiest railway stations in the country under Lucknow division of North railway zone and Varanasi division of north eastern railway zone handling more that 250 trains and about 84,000 passengers everyday. According to records, the number of halting trains is 173, while 44 trains originate from here and 45 trains terminate at this station.

3 posts are hidden.

  
643 views
May 26 2017 (14:19)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10068 blog posts   14938 correct pred (63% accurate)
Re# 2292601-4            Tags   Past Edits
kabhi to train 12 hours late chalegi tab kaam me aayegi

4 posts are hidden.
  
Predictions: 2
confirm: 2
rac: 0
wl: 0
PREDICT


Journey: Thu Jun 01, 2017 @ 15:45
Class: Sleeper - SL   |   Tot Seats: Avbl 158
Travel: GWL/Gwalior Junction   to   JP/Jaipur Junction   |   357 km / 1090 km
19665/Khajuraho - Udaipur City Express

Posted by: ® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10068 blog posts   14938 correct pred (63% accurate)
PNR: 271-xxxxxxx   |   Similar PNRs
Entry# 2292252        
Posted Status as of: May 25 2017 (14:04)
Boarding Point: GWL/Gwalior Junction
Resv To: JP/Jaipur Junction
Resv Quota: PQ
Passenger 1: Confirmed (Booking Status: Confirmed: S9/32 [SU])
Total Fare:  225
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Today (09:08) 
Boarding Point: GWL/Gwalior Junction
Resv To: JP/Jaipur Junction
Resv Quota: PQ
Passenger 1: Confirmed (Booking Status: Confirmed: S9/32 [SU])
Total Fare:  225
Chart NOT Prepared

Predictions

confirmMay 25 2017 (14:04)® राहुल जैन ☺ झाडू व...8 corr (57% acc)
confirmMay 25 2017 (14:25)premprasad25 

  
329 views
May 25 2017 (14:24)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10068 blog posts   14938 correct pred (63% accurate)
Re# 2292252-1            Tags   Past Edits
for cnf ticket why showing prediction buttons
also showing captcha for first time on IRI
  
★★  Info Update
1 Followers
3356 views
May 19 2017 (09:48)   51703/Jabalpur - Ghunsore Passenger (UnReserved) | JBP/Jabalpur Junction (6 PFs)

2017Year of hopes for JBP~   3364 blog posts   44 correct pred (50% accurate)
Entry# 2282689            Tags   Past Edits
अगले माह होगा नैनपुर ट्रैक पर इंजन का ट्रायल
अगले माह होगा नैनपुर ट्रैक पर इंजन का ट्रायल
भाससे | जबलपुर
ब्रॉडगेज की नई रेल लाइन पर अगले माह में घंसौर से नैनपुर के बीच इंजन ट्रायल की जाएगी। नए रेल ट्रैक पर 90 प्रतिशत काम को पूरा कर लिया गया है। पांच किमी की रेल लाइन मंे बचे छुटपुट कार्य को अगले
...
more...
माह के दूसरे सप्ताह तक पूरा करने नया टारगेट दिया गया है। सीआरएस की मंजूरी मिलते ही माह के अंत तक घंसौर से नैनपुर के बीच पैसेंजर ट्रेन को हमेशा के लिये दौड़ाया जाएगा। जबलपुर-बालाघाट ब्रॉडगेज परियोजना के तहत निर्माण कार्य 20 साल में भी पूरा नहीं हो सका। लंबा समय बीत जाने के बाद भी ब्रॉडगेज परियोजना अधूरी पड़ी है। नई रेल लाइन बिछाने के कार्य में तेजी लाने को लेकर नए सिरे से योजना तैयार की गई। गोंदिया से बालाघाट के बीच नई रेल लाइन का काम पहले ही पूरा कर लिया गया है।
दक्षिण पूर्व मध्य रेल ने जबलपुर से बालाघाट के बीच कार्य में तेजी लाने तीन चरण में काम करने योजना तैयार की। पहले चरण में जबलपुर से सुकरी के बीच 45 किमी के काम को भी पूरा कर लिया गया है। इसके बाद सुकरी से घंसौर तक काम पूरा होते ही एसईसीआर के इंजीनियरांे द्वारा नैनपुर तक नए रेल ट्रैक का काम तेज गति से काम किया जाने लगा है। दूसरे चरण में घंसौर से नैनपुर के बीच 35 किमी की नई रेल लाइन को बिछाए जाने का काम लगभग पूरा हो गया है। सूत्रों के अनुसार पांच किमी के ट्रैक में अर्थवर्क, पटरियों का अलायमंेट, ट्रैक के ज्वाॅइंट, गिट्टी बिछाने सहित कुछ कार्य बचे हुए हैं।
जानकारों ने बताया कि अगले माह के दूसरे सप्ताह में सभी बचे कार्य को पूरा कर लिये जाने के बाद नई लाइन पर घंसौर से नैनपुर के बीच इंजन को दौड़ाकर ट्रायल ली जाएगी। ट्रायल के सफल होते ही एसईसीआर के डीआरएम और चीफ इंजीनियर द्वारा नए ट्रैक की स्थिति का जायजा लिया जाएगा। सब कुछ ठीक रहा तो सीआरएस को फाइनल ट्रायल के लिये बुलाया जाएगा। सीआरएस की एनओसी मिलते ही अगले माह के अंत तक जबलपुर से घंसौर के बीच फर्राटा मार रही ट्रेन को नैनपुर तक दौड़ाया जाएगा। एसईसीआर के इंजीनियरों ने अपने नए टारगेट को लेकर तैयारियां जोर-शोर से शुरू कर दी हैं। जिससे समय रहते जबलपुर से नैनपुर के बीच ट्रेन सेवा के शुरू होते ही आवाजाही में यात्रियों को आसानी हो जाएगी।पी-1
पांच किलोमीटर की रेल लाइन पर चल रहा कार्य, सीआरएस की मंजूरी मिलते ही माह के अंत में चलेगी घंसौर से पैसेंजर ट्रेन

36 posts are hidden.

  
891 views
May 24 2017 (19:53)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10068 blog posts   14938 correct pred (63% accurate)
Re# 2282689-42            Tags   Past Edits
this will be the fastest and as promised gc
#jabalpurnews #balaghatnews

  
800 views
May 24 2017 (23:53)
2017Year of hopes for JBP~   3364 blog posts   44 correct pred (50% accurate)
Re# 2282689-43            Tags   Past Edits
Yeah it is but they shud have open gns-nir in june as planned before but now its extended to august n hope after some time again it shud not be extended

2 posts are hidden.
Page#    6518 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Jun 9
Trains with ARP 15 Dep on: Wed Jun 14
Trains with ARP 30 Dep on: Thu Jun 29
Trains with ARP 120 Dep on: Wed Sep 27

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site