Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Feb 24, 2017 16:27:37 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Feb 24, 2017 16:27:37 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by bornbigboy
Page#    9 Blog Entries  
TRIP HAS ENDED.
Blog  Time-Table
TRIP HAS ENDED.
Blog  Time-Table
TRIP HAS ENDED.
Blog  Time-Table
TRIP HAS ENDED.
Blog  Time-Table
  
Predictions: 50
confirm: 15
rac: 35
wl: 0
Journey: Tue Mar 12, 2013 @ 18:25
Class: Sleeper - SL   |   Tot Seats: Avbl >594
Travel: HTE/Hatia   to   VSKP/Visakhapatnam Junction   |   826 km / 1903 km
12835/Hatia - Yesvantpur SF Express (PT)
Entry# 690959
 

Posted by: bornbigboy   4 blog posts   14 correct pred (56% accurate)
PNR: 661-xxxxxxx    |   Similar PNRs
Posted Status as of: Mar 11 2013 (17:08)
Passenger 1: Waitlist# 14 (Booking Status: W/L 154,GNWL)
Passenger 2: Waitlist# 15 (Booking Status: W/L 155,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 12 2013 (14:50)
Passenger 1: RS8 23 (Booking Status: W/L 154,GNWL)
Passenger 2: RS8 23 (Booking Status: W/L 155,GNWL)
Chart PREPARED

  
1156 views
Mar 12 2013 (11:10)
Hareesh Mangalam*^~   3846 blog posts   43014 correct pred (77% accurate)
Re# 690959-1            Tags   Past Edits
#RACAllocation
144 in SL from HTE to VSKP

  
1066 views
Mar 12 2013 (13:39)
छोटा आदमी~   6799 blog posts   99587 correct pred (90% accurate)
Re# 690959-2            Tags   Past Edits
not much rush, lets see if VSKP quota can do the trick
  
Predictions: 21
confirm: 21
rac: 0
wl: 0
Journey: Wed Feb 20, 2013 @ 01:15
Class: Sleeper - SL
Travel: RDM/Ramagundam   to   RNC/Ranchi Junction   |   1160 km / 1923 km
17007/Secunderabad - Darbhanga Express (PT)
Entry# 650587
 

Posted by: bornbigboy   4 blog posts   14 correct pred (56% accurate)
PNR: 424-xxxxxxx    |   Similar PNRs
Posted Status as of: Jan 24 2013 (13:08)
Passenger 1: RAC 36 (Booking Status: RAC 44,GNWL)
Passenger 2: RAC 37 (Booking Status: RAC 45,GNWL)
Passenger 3: RAC 38 (Booking Status: RAC 46,GNWL)
Passenger 4: RAC 39 (Booking Status: RAC 47,GNWL)
Passenger 5: RAC 40 (Booking Status: RAC 48,GNWL)
Passenger 6: RAC 41 (Booking Status: RAC 49,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Feb 19 2013 (20:36)
Passenger 1: EX3,1/Coach Position:12 (Booking Status: RAC 44,GNWL)
Passenger 2: EX3,4/Coach Position:12 (Booking Status: RAC 45,GNWL)
Passenger 3: EX3,2/Coach Position:12 (Booking Status: RAC 46,GNWL)
Passenger 4: EX3,3/Coach Position:12 (Booking Status: RAC 47,GNWL)
Passenger 5: EX3,5/Coach Position:12 (Booking Status: RAC 48,GNWL)
Passenger 6: EX3,6/Coach Position:12 (Booking Status: RAC 49,GNWL)
Chart PREPARED

  
1053 views
Feb 20 2013 (11:55)
Hareesh Mangalam*^~   3846 blog posts   43014 correct pred (77% accurate)
Re# 650587-1            Tags   Past Edits
#Extracoach EX3
3 Extra SL Coaches?
  
Predictions: 30
confirm: 24
rac: 0
wl: 6
Journey: Wed Feb 20, 2013 @ 01:15
Class: Sleeper - SL
Travel: RDM/Ramagundam   to   RNC/Ranchi Junction   |   1160 km / 1923 km
17007/Secunderabad - Darbhanga Express (PT)
Entry# 672676
 

Posted by: bornbigboy   4 blog posts   14 correct pred (56% accurate)
PNR: 434-xxxxxxx    |   Similar PNRs
Posted Status as of: Feb 17 2013 (13:38)
Passenger 1: Waitlist# 175 (Booking Status: W/L 258,GNWL)
Passenger 2: Waitlist# 176 (Booking Status: W/L 259,GNWL)
Passenger 3: Waitlist# 177 (Booking Status: W/L 260,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Feb 21 2013 (11:52)
Passenger 1: EX3,25/Coach Position:12 (Booking Status: W/L 258,GNWL)
Passenger 2: EX3,28/Coach Position:12 (Booking Status: W/L 259,GNWL)
Passenger 3: EX3,26/Coach Position:12 (Booking Status: W/L 260,GNWL)
Chart PREPARED

  
1138 views
Feb 19 2013 (22:24)
rdb*^   30561 blog posts   359684 correct pred (79% accurate)
Re# 672676-1            Tags   Past Edits

1 posts are hidden.
  
Predictions: 15
confirm: 1
rac: 6
wl: 8
Journey: Thu Nov 22, 2012 @ 23:47
Class: Sleeper - SL   |   Tot Seats: Avbl >198
Travel: KZJ/Kazipet Junction   to   VSKP/Visakhapatnam Junction   |   568 km / 971 km
18510/Hazur Sahib Nanded - Visakhapatnam Express (PT)
Entry# 580562
 

Posted by: bornbigboy   4 blog posts   14 correct pred (56% accurate)
PNR: 424-xxxxxxx    |   Similar PNRs
Posted Status as of: Nov 12 2012 (14:57)
Passenger 1: Waitlist# 117 (Booking Status: W/L 145,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Nov 23 2012 (12:30)
Passenger 1: S1,12/Coach Position:18 (Booking Status: W/L 145,GNWL)
Chart PREPARED

  
1087 views
Nov 22 2012 (22:03)
rdb*^   30561 blog posts   359684 correct pred (79% accurate)
Re# 580562-1            Tags   Past Edits

1 posts are hidden.

  
896 views
Nov 23 2012 (12:25)
Namaste Sharada Devi Kashmir Pura Vasini Tvam ham*^~   900 blog posts   43327 correct pred (67% accurate)
Re# 580562-3            Tags   Past Edits
JAMMU WALO KI PREDICTION ZINDABAD
  
Predictions: 14
confirm: 4
rac: 0
wl: 10
Journey: Tue Nov 06, 2012 @ 15:53
Class: AC 3-tier - 3A
Travel: SCM/Simhachalam   to   JRA/Jaraikela   |   680 km / 2363 km
13352-Slip/Alappuzha - Tatanagar (Bokaro) Express Slip (PT)
Entry# 573274
 

Posted by: bornbigboy   4 blog posts   14 correct pred (56% accurate)
PNR: 486-xxxxxxx    |   Similar PNRs
Posted Status as of: Nov 05 2012 (21:56)
Passenger 1: Waitlist# 7 (Booking Status: W/L 9,RLGN)
* Please Note that in case the Final Charts have not been prepared, the Current Status might upgrade/downgrade at a later stage.
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Nov 06 2012 (11:59)
Passenger 1: B1,41 (Booking Status: W/L 9,RLGN)
* Please Note that in case the Final Charts have not been prepared, the Current Status might upgrade/downgrade at a later stage.
Chart PREPARED

  
1437 views
Nov 07 2012 (01:34)
DB*^~   33537 blog posts   224048 correct pred (71% accurate)
Re# 573274-1            Tags   Past Edits
Page#    9 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Mar 6
Trains with ARP 15 Dep on: Sat Mar 11
Trains with ARP 30 Dep on: Sun Mar 26
Trains with ARP 120 Dep on: Sat Jun 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Yesterday (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site