Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Jun 23, 2017 11:07:29 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Jun 23, 2017 11:07:29 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by akshat.scmhrd
Page#    4 Blog Entries  
  
★  Rail Fanning
0 Followers
2733 views
Feb 29 2016 (21:21)   12780/Goa Express (PT) | BHS/Vidisha (3 PFs) | GZB/WAP-4/22732
 

Nitin Kumar~   2698 blog posts   303 correct pred (66% accurate)
Entry# 1753731            Tags   Past Edits
HIGH SPEED GOA EXPRESS :)

1 posts are hidden.

  
2068 views
Mar 01 2016 (10:35)
akshat.scmhrd   4 blog posts   11 correct pred (50% accurate)
Re# 1753731-2            Tags   Past Edits
Does the train have AC 1st. IRCTC doesn't show it

  
2160 views
Mar 01 2016 (10:46)
Subhash Dhavala*^~   6300 blog posts   4673 correct pred (61% accurate)
Re# 1753731-3            Tags   Past Edits
1AC runs till DD I think, Till Daund Availability is shown, Pl check

1 posts are hidden.
  
General Travel
0 Followers
1486 views
Oct 11 2014 (12:31)   22694/Delhi Hazrat Nizamuddin - KSR Bengaluru City Rajdhani Express
 

akshat.scmhrd   4 blog posts   11 correct pred (50% accurate)
Entry# 1242059            Tags   Past Edits
what is the difference between 22694 and 22692?

  
1133 views
Oct 11 2014 (12:35)
Hussain*^~   19765 blog posts   378241 correct pred (82% accurate)
Re# 1242059-1            Tags   Past Edits
Route is different...

  
1119 views
Oct 11 2014 (12:44)
Love the weather of Bangalore*^~   5850 blog posts   16805 correct pred (68% accurate)
Re# 1242059-2            Tags   Past Edits
22694: Upto Sec Both Same But After That One Is Follow Dhone Junction Route and another One Follow Dharmavaram Junction Route

  
1232 views
Oct 11 2014 (12:50)
MJ*^   8664 blog posts   11633 correct pred (68% accurate)
Re# 1242059-3            Tags   Past Edits
22694 follows sc-krnt-dhne-gy-dmm route
where as 22692 follows sc-yg-rc-gtl-kalluru(without touching gy)-dmm
  
Travel Question
0 Followers
967 views
Oct 11 2014 (12:47)   12114/Nagpur - Pune Garib Rath Express
 

akshat.scmhrd   4 blog posts   11 correct pred (50% accurate)
Entry# 1242094            Tags   Past Edits
Is there any progress on doubling of track between MMD and DD. Also, IR should link ANG to PUNE directly avoiding DD. I am sure it would save atleast 45 min.
  
General Travel
0 Followers
1585 views
Oct 11 2014 (08:52)   02680/Shri Mata Vaishno Devi Katra-Yesvantpur SF Special | BAY/Ballari Junction (Bellary) (4 PFs)
 

भूत हूँ मैं~   3499 blog posts   3084 correct pred (82% accurate)
Entry# 1241851            Tags   Past Edits
Really horrible route in SC-YPR section just for 1 stop, Bellary. ALso too slow between NDLS and NGP.
Here must be the approximate timings:
Must trail BSP Rajdhani by 1.15 hrs from NDLS itself. (Obviously its Premium).
Will depart NGP @ 7.30 AM, arrive KCG @ 4.30 PM.
From
...
more...
SC onwards, Instead of current such route, following can be done : Train can come to KCG instead of SC and get Deisel loco, departure @ 4.45 PM around. As per current runtime btween KCG and GTL 6.30hrs, it will pass through GTL @ 11.15 PM and will reach Bellay @ 12.10 AM (50 Kms from GTL). Now, instead of its present route, it can have rake reversal and may again go towards GTL. Let it depart from BAY @ 12.35 AM. It will again pass through GTL at 1.30 AM around and as per present run between GTL and YPR of 6 hrs, it will reach YPR from GTL @ 8 AM.
Note: Same departure time from NDLS, but 7 hrs prior arrival @ YPR. Big relief for pax...

5 posts are hidden.

  
953 views
Oct 11 2014 (12:43)
akshat.scmhrd   4 blog posts   11 correct pred (50% accurate)
Re# 1241851-6            Tags   Past Edits
The train is surprisingly slow on a truck route between NDLS and NGP and onwards. 4 hours slower than 12442 is very surprising.
However, its one of the fastest option ex JAT/SVDK. The next best direct option takes 34+ hours and is always late and this takes 28 hours despite and additional 80km/1.5 hours.
If the train would have been faster after JHS, it would be 24 hours flat!!!!
Page#    4 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Jul 3
Trains with ARP 15 Dep on: Sat Jul 8
Trains with ARP 30 Dep on: Sun Jul 23
Trains with ARP 120 Dep on: Sat Oct 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.