Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Apr 27 05:01:13 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 1851203
Posted: May 17 2016 (13:54)

32 Responses
Last Response: May 18 2016 (17:10)
Travelogue
36201 views
12

★★
May 17 2016 (13:54)   13301/Swarna Rekha Express | DHN/Dhanbad Junction (9 PFs)
 
Arnab_K~
Arnab_K~   9049 blog posts
Entry# 1851203            Tags   Past Edits
DOWN MEMORY LANE.....
ACT 1 ( A very vagure recollection of a journey taken long back )
Timeline :- Summer Vacations of 2002, probably late of may!
Place of Action :- DHANBAD JUNCTION (DHN)
An
...
more...
otherwise normal morning at Dhanbad station. A chirpy ten year old boy made his way across his way, along platform 4/5 to catch the first run of the Swarnarekha Express! The newly introduced train was the first train between Dhanbad and Tata. It was after quite a time, that we were visiting my paternal uncle in Jamshedpur. Naturally I was very exicted to visit his place, even more so because of my cousins whom I hadn't seen in over a year. We hadn't talked or seen each other as mobile phones were a rarity back in those days, infact virtually non-existent, even landlines were rare. Letters were big then, and infact were the only means of communicating for almost everyone! Naturally my exictment reached stratospheric levels!
Now I had been to TATA numerous times before but it was the first time that was by a train. Normally we would take the numerous 'Shankar Parvati' or 'Shiv Shakti' run buses that traverse the two cities 24/7. I am sure that Dhanbad -Tata frequenters can relate to it :P
The new train was decorated with flowers just like a new bride. Even the old, dusty and rusty diesel engine, that was to serve as the link upto ADRA, wasn't spared, as flowers covered it's red-white and blue body. (It was obviously a WDM-2, but I didn't know it back then.) There was a 'Puja' being performed on the locomotive and locomotive was decorated with 'Swastikas'. I don't remember the exact number of coaches but all of them were new. We took our respective seats. The coach was mostly empty so we took our seats. I was seated in a window seat and the parents sat on the opposite seat.
Back then the train use to take the DHN-JRI-PEH-BJE-ADRA-PRR-CNI-TATA route, as the Dhansar-Jharia line was operational. The DHN-BJE line was a single diesel track so the train used to hauled by a Diesel loco from Dhanbad to Adra and by an electric locomotive from ADRA to TATA. The Dhanbad-Jharia single line used to be quite a busy line in it's 'heydays' and a few trains that terminate at Dhanbad now used to go all the way to Bhojudih. For example the ASN-DHN passenger would originally run ASN-BJE with an engine change at DHN.
The DHN-JRI-PEH was a relative circuitous route. The tracks would run parrallel to the DHN-CRP line upto the Diamond Crossing wherein the lines would begin curving negotiating a sharp turn and cross the DHN-CRP line almost perpendicularly and still keep on curving until the train had almost reversed it's original direction and would then go off towards Dhansar side. This was necessary because of the elevation difference that existed between Dhanbad and Dhansar stations.
Anyone that has been to Dhansar can clearly visualize the marked height difference that exists.
The trains would virtually crawl until it had negotiated the curve and the Diamond Crossing, and then would speed up. Unlike the DHN-CRP line, the DHN-PEH line was in good condition when it was operational and trains used to run from DHN-JRI at good speeds. It used to be fun to see the train cutting through the city landscape at good speeds. Dhansar would get always skipped by the Swarnarekha at good speeds....
The train which is now a pale shadow of it's former self, used to depart from DHN somewhere 6-7 AM and certainly not the present timing of 5:30 AM. The entire Dhanbad-Tata journey used to be covered up in about 4:30 hours and not 5:30 hours that the present train takes. It is a testament that the condition the DHN-JRI-PEH line was in, when compared to the present DHN-PKA-PEH line which inspite of being shorter is much slower and requires a rake reversal.
As the train departed and made it's way towards it's first halt 'Jharia', I remember happily munching on 'Jhalmuri'........
Place of Action :- JHARIA (JRI)
The first thing that comes to my mind as I recollect Jharia is 'Dust'! Jharia was the biggest railway station after Dhanbad obviously, on DHN-BJE and had probably 3 or 4 platforms but was dusty and dirty. It may come as no surprise that Jharia station was dirty considering the place that Jharia holds in regard to mining of coal but those things were beyond the comprehending power of my 10 year old self then. Anyway, usually there were not any vendors boarding from Jharia but Jharia did have a good number of passenger.
I don't remember much of Jharia on that day.....
Place of Action :- ADRA JUNCTION (ADRA)
The first big junction on the way. The train used to reverse it's direction from here onwards. Almost everyone would deboard to fill up there water bottles and have the 'Muri-Aloo Chop' thonga packets that ADRA is so famous for. Back then Purulia was a small station, and it's stature was much less than what is now. Therefore Adra used to be the main railway station of the Purulia district.
Another change that would happen at ADRA was that the diesel locomotive that hauled us this far would get detached and an electric locomotive would get attached at the other end.
The halt at ADRA used to be for around 20 minutes and numerous trains would criss cross the Swarna Rekha. Another change that would happen after ADRA was the appreciable speed up of the train due to much better condition of the line. Post Adra the train would run amok towards Purulia criss-crossing the rural landscape of the Purulia district.
Since it was summertime, the fields were all dried up, and it was quite a sight to see Golden yellow landscape pass by as the train headed for Purulia. Alongside the ADRA-PRR railway line parallel ran the Dhanbad-Chas-Purulia-Ranchi/Tata highway and it was joyous to see our train overtaking almost every vehicle that raced alongside.
Place of Action :- PURULIA (PRR)
Purulia used to be much smaller station than it is now. In this past 15 years Purulia has grown phenomenally and the growth and devlopment here have nothing short of exponential!
I do not remember much of Purulia excepting that a ticketless traveller had been caught by the onboard TTE and was being made to pay the required fine!
Place of Action :- CHANDIL (CNI)
Back again to Jharkhand, I have always been fascinated by Chandil due to it's presence in the 'Elephant Corridor'. I remember stretching my neck and looking out as far as my gaze would go in the look out for an elephant. I could never find one :P
Place of Action :- TATANAGAR JUNCTION (TATA)
Finally at around quarter past eleven the train reached it's final destination. I had been to Jamshedpur numerous times before but it was first time at TATA station. I must say I was quite overwhelmed by the rush there. Now I had been to much busier stations like Howrah, Sealdah, Asansol etc countless times before , but when you visit a relatively unknown station the rush seems all the more overwhelming! We sat on until everyone on board detrained, and then we got out.
My Uncle and cousins were already waiting with their faces beaming with happiness . We rushed to their side and what followed were 15 days of joy at my uncle's place at the 'STEEL CITY' and then we returned to Dhanbad by the same train :)

Translate to English
Translate to Hindi

28 Public Posts - Tue May 17, 2016

22416 views
0

May 17 2016 (23:04)
Sanz~
Sanz~   8512 blog posts
Re# 1851203-29               Past Edits
13301 Avg Speed
ADRA-TATA- 129km 2.50 hours at 46kmph 5 halts
ASN TATA passenger in ADRA-TATA 3.30 hours at 37kmph with 20 halts. To remove extra halts make it fast passenger or something
Translate to English
Translate to Hindi

1 Public Posts - Tue May 17, 2016

2 Public Posts - Wed May 18, 2016

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy